Module 12 INTERNATIONAL AND NATIONAL DIMENSIONS TO IAS MANAGEMENT.

Slides:



Advertisements
Similar presentations
Sharon Gross U.S. Fish and Wildlife Service The U.S. Invasive Species Management Plan.
Advertisements

Invasive Species as a Trilateral Challenge Preventing the Introduction and Spread of Aquatic Invasives Species in North America Commission for Environmental.
National Strategy on Invasive Species and National Invasive Species Information System VIII Trilateral Committee Meeting Invasive Species as a Trilateral.
Disaster Risk Reduction and Governance. Ron Cadribo.
Armand Racine Consultant Chemicals Branch
Pest Risk Analysis (PRA) Training
Invasive Alien Species: Toward a National Plan for Canada Workshop on Invasive Alien Species and the International Plant Protection Convention September.
1 The Management of Invasive Species in Marine & Coastal Environments Module 6 The International Response.
Workshops for implementing the Strategic Plan for Biodiversity through the National Biodiversity Strategies and Action Plans Module 2 The Biodiversity.
A Presentation by UNEP At the UNFCCC Workshop on the Adaptation Fund Fairmont Hotel Macdonald Edmonton, Alberta, Canada 3—5 May 2006.
References to Economic Instruments in Selected MEAs Matthew Stilwell Matthew Stilwell.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
Module 2: laying the foundations for effective national frameworks Developing legal and institutional frameworks for invasive alien species.
Session V: Programme Roles and Responsibilities
Harmonization of Information Management and Reporting for Biodiversity- Related Treaties Vijay Samnotra, UNEP Espoo, Finland, July 2-4, 2003.
Global Environment Facility GEF approach to synergistic action on global environment issues Espoo, Finland, July 2 – 3, 2003.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
Intergovernmental Forum on Mining/Minerals/Metals and Sustainable Development Andre Bourassa Secretariat of the Forum.
The IUCN Programme Nature+ Proposal, May 2011.
Part 5: Relevant International Agreements, Treaties, Memberships & Guidance 2 “The consequences of an act affect the probability of its occurring again.”
The GEF in Mexico Integrating GEF Programmes and Strategies at Country Level Cape Town, August, 2006.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
1 The Management of Invasive Species in Marine & Coastal Environments Module 7 Developing a National Strategic Framework.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Implementation of Global Action Plan for Peatlands and Ramsar CC GAP future Wise Use of Peatlands Schiphol February, 2009.
The IPPC and Guidance on International Standards to Protect Forests Gillian Allard FAO Forestry Department in cooperation with the IPPC Secretariat.
Participatory research to enhance climate change policy and institutions in the Caribbean: ARIA toolkit pilot 27 th meeting of the CANARI Partnership January.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
Roles of GEF National Focal Points & Experiences in GEF Coordination and Integration Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland,
RELEVANCE OF INTERNATIONAL AND REGIONAL INSTRUMENTS TO NATIONAL COASTAL FISHERIES POLICY UNIT 1 Pio E. Manoa School of Marine Studies Faculty of Islands.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Module 6 Early Detection and Rapid Response. Learning outcomes By the end of this module you should be able to: –Understand the role of early detection.
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
The China Biodiversity Partnership And Framework for Action (CBPF) A Programmatic Approach for Biodiversity Conservation.
Ministry for Women, Youth, Children and Persons with Disabilities.
Module 5 Prevention. What is Prevention? –Minimizing the risk of moving alien species to countries or ecosystems where they may become invasive.
Land Governance and Security of Tenure in Developing Countries White paper of the French Development cooperation LAND POLICIES AND MDGS IN RESPONSE TO.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Integrating GEF in Environment and Sustainable Development Plans and Policies - – Jamaica’s Experience GEF CSP Sub-regional Workshop for Caribbean Focal.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
National Environmental Management: Biodiversity Bill 2003 DEPARTMENT OF ENVIRONMENTAL AFFAIRS AND TOURISM.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Invasive Alien Species REFIT Process The perspective from European hunters Meeting of the Directors-general of Hunting and Game management – 1 st of September.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Invasive Alien Species (IAS) The perspective from European hunters 1 st Meeting of the Working Group on Invasive Alien Species – 12 th of June 2015 Presentation.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
1 The Work Programme on Invasive Alien Species under the Convention on Biological Diversity Ryan Hill and Jo Mulongoy Secretariat of the Convention on.
Capacity Building for the implementation of the Cartagena Protocol on Biosafety by the German Development Co-operation: German Federal Ministry for Economic.
RCUK International Funding Name Job title Research Councils UK.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Regional Training – Legal Implementation of the Ballast Water Management Convention focusing on Compliance Monitoring and Enforcement 16 – 17 November.
University of Greenwich
Ralf Lopian Senior Advisor
NATIONAL REDD+ SECRETARIAT
Overview Rationale Context and Linkages Objectives Commitments
Understanding what is the Phytosanitary Capacity Evaluation (PCE)
Development of IAS policy Institutional state of play 3 September 2010
Overview Rationale Context and Linkages Objectives Commitments
Development of IAS policy
References to Economic Instruments in Selected MEAs
EU strategy on invasive alien species
Presentation transcript:

Module 12 INTERNATIONAL AND NATIONAL DIMENSIONS TO IAS MANAGEMENT

Conclusion from other Modules: (1) IAS management, public awareness, stakeholder support, institutional mandates, laws and regulations can not be developed or maintained in a vacuum – they influence each other and support each other First Part of Module

Conclusion from other Modules of this training (2) International efforts and cooperation will be required to effectively address IAS Second Part of Module

In order to to deal with invasive alien species, a National Strategic Framework is required. –National IAS Strategy (“The Plan”) –Implementation (“Carrying out the plan”) –Institutional and Structural arrangements (“Whose job is it?” Who decides?”) –Legislation (and regulations) (“Rights, obligations….”)

STRATEGY IMPLEMENTATION LEGISLATIONINSTITUTIONAL Different aspects of the Strategic Framework overlap and support each other

Building a National Strategic Framework BUILDING BLOCKS FOR NATIONAL STRATEGIC FRAMEWORK

Building a National Strategic Framework Structure in this Module: - Developing and implementing a National Strategy -Leadership, Coordination and Cooperation -Legal and Institutional requirements -Approaches

DEVELOPING AND IMPLEMENTING A NATIONAL STRATEGY (Building Blocks) Preliminary Assessment Task Force Producing the National Strategy Operational Arrangements National Strategy Implementation

Assessment of situation  What alien species and potentially IAS are in your country?  What are the pathways?  What is at risk?  What agencies deal with IAS?  What laws and regulations exist? What is the present situation and what constraints are there?

Task Force to formulate National Strategy (1)Wide stakeholder participation is crucial to -maximise expert input -maximise support For instance: Government agencies, Primary Producers, other industry and sectors, Environmental NGOs, Regional Government, other relevant Community groups

Task Force to formulate National Strategy (2) Analyse all relevant information (3) Determine suitable policies, practices, operational procedures, responsibilities and implementation arrangements (4)Determine who should be the Lead Agency

Task Force to formulate National Strategy (5)Produce a Draft National Strategy (6)Circulate the Draft National Strategy widely for comment and input (7)Incorporate input (8)Submit to government for consideration and approval

Lead Agency Is an agency with the principal responsibility for operationalising and managing the National Strategy on an ongoing basis ….. ….. in a system of cooperation with other national or local government agencies and consultation with other stakeholders

Lead Agency Can be: Existing agency or Newly formed entity The most suitable Lead Agency will be different in different countries – depends on: mandate, capacity, resources, national situation…..

Lead Agency 1)New Zealand, Ministry of Agriculture and Forestry has been designated the lead agency for all aspects of biosecurity strategy (including biodiversity impacts) 2)Strong coordinating structure e.g. USA National Invasive Species Council Key : structure of cooperation with other agencies where roles and responsibilities are clear and which enables all stakeholders to work effectively together

National IAS Strategy Vision and goals/objectives Scope (what species, what pathways?, geographic coverage) Context Contents: All aspects of dealing with IAS must be covered, including management, leadership, coordination, awareness, legal and institutional, research, funding … It sets “high level” recommendation for actions – not detailed ones

Widespread stakeholder involvement is critical Including governmental agencies, industry, primary sectors, NGOs, communities…. National Strategy must create clarity on mandates and responsibilities

IMPLEMENTATION OF NATIONAL STRATEGY AND NATIONAL SRATEGIC FRAMEWORK Implementation of a National Strategic Framework will consist of implementing high level recommendations for action as well as the planning and carrying out of day to day activities to address IAS issues.

LEADERSHIP AND COOPERATION (Building blocks) Lead Agency / Invasive Species Committee Interagency Cooperation Wide stakeholder involvement National Strategy Implementation Leadership & Coordination Cooperation

Lead Agency The main obligation and responsibility for the implementation and ongoing management of the National Strategy and other components of the national framework usually falls on a lead agency in a system of cooperation with other national or local government agencies and consultation with other stakeholders

“A priority action is to establish national IAS Committees (i.e. with full sectoral representation) and national IAS focal points in countries that do not already have them. The Committee should supervise the implementation of the Strategies/Plans and set IAS priorities and responsibilities such as identifying key organisations to lead on specific IAS issues in each country.” Statement by delegates to Austral Pacific Workshop (GISP). Honolulu, October 2002

INTERAGENCY COOPERATION Clarity of mandates Clarity of decision making Competition for funding should be avoided A decision-making systems to resolve potential conflicts of interest Good information flow between agencies Good will and understanding of a common goal

Wide Stakeholder involvement Advisory role in developing Strategy Involvement in the implementation of IAS management, for example: Consultation in risk analysis Development of voluntary guidelines or codes of conducts relating to their sector

Stakeholder Involvement in the implementation of IAS management, e.g. Participation in surveillance Community led restoration programmes Community led eradication or control programmes Awareness raising and education

Leadership, Coordination and Cooperation are key building blocks for a National Strategic Framework. It will depend on the country’s situation which Agency may be the best suited to be a Lead Agency. National IAS Committees could be a good first step towards a Strategic Framework Interagency Cooperation will require goodwill and understanding of the common goals Wide stakeholder involvement is critical for the success of a Strategic Framework

NATIONAL LEGAL & INSTITUTIONAL FRAMEWORK (Building Block) National Strategy Implementation Leadership & Coordination Cooperation Legal & Institutional

Law is used to implement policy objectives and determine principles, standards and procedures to achieve them Legal and Institutional systems underpin the mandate to act to address IAS Establishing efficient institutions is one of the most important roles of legislation, though this is often underestimated

Key Requirements for National Legal frameworks Terminology and Definitions Geographical coverage –All ecosystems –Species native in one part of country and invasive in another part of country (e.g. hedgehogs in Scotland) –Vulnerable and valuable areas

Key Requirements for National Legal frameworks Species coverage –No taxonomic groups omitted –IAS with impacts on primary production, livelihoods, biodiversity, health,….

Key Requirements for National Legal frameworks Management –Prevention –Early Detection /Rapid response –Eradication –Control –Mitigation of impacts

Remember… Where proposed biological control agents are alien species, the full process of risk analysis should apply to them, as for any other proposed intentional introduction of an alien species Legislation must exclude alien species from automatic protection

APPROACHES (Building Block) National Strategy Implementation Leadership & Coordination Cooperation Legal & Institutional Approaches

Regional and other transboundary approach IAS do not recognise country borders… –Formalised Regional Strategies –Regional Action Plans –Transboundary Cooperation

INTEGRATING IAS STRATEGIES INTO OTHER NATIONAL STRATEGIC ISSUES Development of biodiversity strategies Poverty alleviation strategies Sustainable development strategies EIA for large engineering works (e.g. canals, tunnels, etc.) Protected Areas Management Plans

Invasive species control and reforestation initiative (in partnership with local leaders ), school growing and planting native trees,…..(National Park America Samoa) SUPPORTING RESTORATION AND APPRECIATION OF NATIVE BIODIVERSITY

Using and encouraging native species as an alternative Promotion of native plants for disturbed lands, Alberta (Canada) Mekong River Commission (MRC) Fisheries Programme: promotion of aquaculture of Indigenous Mekong fish species Any use of native species as an alternative to using alien species must be done in the context of sustainable use.

Using and encouraging native species as an alternative Gardening Erosion control Developing aquaculture Stocking of rivers and ponds Forestry Aid and development assistance

CONTROLS ON DOMESTIC MOVEMENT OF SPECIES PRIORITISING –Risk Analysis PRECAUTION –Precautionary measures are advocated, required or allowed by several international instruments, –Precaution is especially relevant in the context of IAS with biodiversity impacts, because of the ecological complexity involved.

INDIVIDUAL CONTRIBUTIONS….. There is always something you can do

National Strategy Leadership and coordination Cooperation Implementation Legal / Institutional Approaches STRATEGIC FRAMEWORK!! CONCLUSIONS

National Strategy Leadership and coordination Cooperation Implementation Legal / Institutional Approaches STRATEGY IMPLEMENTATION LEGISLATION INSTITUTIONAL Prevention Early Detection / Rapid response Eradication Control Mitigation Awareness Education Research Funding Etc….. CONCLUSIONS

INTERNATIONAL INSTRUMENTS, INITIATIVES AND PROGRAMMES ON IAS

REGIONAL SPREAD OF IAS IAS, once introduced, can spread to neighbouring countries (e.g. Cactoblastis cactorum )

SUMMARY: WHY INTERNATIONAL APPROACH IS REQUIRED 1) MAGNITUDE OF THREAT (Global scale) 2) NEED FOR INFORMATION SHARING: “usual suspects” – shared problem species Prior invasiveness – early warning elsewhere 3) NEED FOR MANAGEMENT COOPERATION IAS in one country can spread to neighbours Shared IAS Capacity building 4) GLOBAL TRADE ASPECTS Cause: movement of huge amount of species outside native range (intentional, unintentional) Where prevention requires trade restrictions, must be consistent with WTO/SPS….

INTERNATIONAL INSTRUMENTS The Convention on Biological Diversity (CBD) RAMSAR The International Plant Protection Convention (IPPC) Office International des Epizooties (OIE) The World Health Organization (WHO) IMO GLOBALLAST International Civil Aviation Organization Technical Guidance for Fisheries and Aquaculture Relationship of existing instruments with the multilateral trading system

INTERNATIONAL PROGRAMMES AND INITIATIVES IAS and sustainable development programmes GLOBAL INVASIVE SPECIES PROGRAMME (GISP) WHAT GISP OFFERS COOPERATIVE INITIATIVE ON IAS ON ISLANDS (CII) International Cooperation between peers GISP Partners Regional Cooperation