The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic Training on Management of.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
BY S V SATISH GM (AIR TRAFFIC MANAGEMENT) AIRPORTS AUTHORITY OF INDIA.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Products and Services Three - Dimensional ATC Aerodrome Simulators Airline Operational Control Service (AOC) Training (ATC and Engineer) Flight Inspection.
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
PBN Airspace Concept Process
Islamic Republic of Afghanistan Ministry of Education EMIS Directorate.
Area Nav: RNP Evolution
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
AFI Comprehensive Implementation Programme (ACIP), in cooperation with AFCAC and other stakeholders, to organize Pan African Training Coordination Conferences.
ATM Implementation Support by ICAO APAC RSO
6Th International Conference ICAO Global Aviation Training Office
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 Aerodrome Certification Requirements in Pakistan Module - 4 AERODROME CERTIFICATION COURSE September 15.
Introduction to PBN Seminar ICAO PBN Implementation 1.
3 Air Navigation Services Air Traffic Services (Control, Information, Alert) Aeronautical Information Service, NOTAM Aeronautical Meteorology Service.
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
AABI Winter Meeting February 2015 PBN and RNP Training.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Module-3 OJT (Vietnam) on “Design Verification/Ground.
1 MAINTAINING MET COMPETENCE AT AN AIR NAVIGATION SERVICES PROVIDER Alexandru Hozoc Head of ROMATSA TCAeM.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
2 nd GNSS Vulnerabilities and Solutions Conference Baska, KrK Island, Croatia September 3, 2009   Hank Skalski U.S. Department.
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
ICC Copyright 2005 Ifield Computer Consultancy Ltd., Commercial in Confidence Ifield Computer Consultancy Limited Grapevine Texas November 2005 Delivering.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design.
Our Experience with D-AIM based on AIXM AIXM/WXXM Information Exchange Conference Washington DC, May 12 – 14, 2009 Takashi Hatta ATC Systems Service, Ltd.,
Introduction to the Slovak AIS Augustin Lamprecht, Head of AIS ICAO AIS/MAP IMPLEMENTATION SEMINAR KIEV, MAY, 2003.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Theory of change Contribution: 1 Standardisation of technical manual for urban utilities Condition:1 Technical standardisation of water and sanitation.
ICAO COSCAP - SA May AERODROME CERTIFICATION COURSE How can aerodrome certification be achieved? Establish an appropriate regulatory system within.
ATM Implementation Support by ICAO APAC RSO
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
INFORMATION SESSION ON GEOGRAPHICAL INDICATIONS
AERONAUTICAL RADIO OF THAILAND LTD.
Familiarization Training on PBN Operations for ATC CLOSING
Sri Lanka's Experience with ICAO TCB Projects
IATA/ATDI Senior Civil Aviation Management Course
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Department of Civil Aviation Ministry of Information & Communications
ASEAN PBN Routes Objectives:
PBN and the benefits for GA
JICA Group Training Course in 2016
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5 Development Status
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Technical Co-operation Challenges
RNAV and RNP Strategy in Japan
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Long term vision for Air Traffic Systems CARATS
Presentation transcript:

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic Training on Management of WGS-84 Data Survey and Data Quality for Civil Aviation in Vietnam December 2011

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Title: WGS-84 Data Survey Training in Cat Bi Airport & Development of WGS-84 Database in Vietnam (2011) 2.Short-term Experts: 2 Surveyors 3. Term: from 5 to 9 December (5 working days) 4. Objectives: To understand 1)What WGS-84 & WGS-84 Survey are/Why WGS-84 is required 2)What ICAO Standards for WGS-84 are 3)What Long base-line analysis is/Why it is required 4)Process of determining WGS-84 coordinate 5) How to analyze the existing WGS-84 survey data 6) How to analyze Total Station Data for position of facilities & obstacle 7)How to manage survey data quality 8)How to maintain survey data, including development of database 2

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 3 5. Seminar Program :  08:30Registration (to be decided by CAAV)  09:00Opening  Remarks by CAAV  Remarks by JICA Project Leader  09:30Current Situation on the Management and Application of WGS-84 CA in Vietnam by Mr. Tran Tuan Linh, CAAV  10:00GPS technology and Satellite Based Air Navigation System by JICA Expert  10:30Coffee break  10:45WGS-84 basic theory and WGS-84 survey by JICA Expert  11:30-13:30Lunch hosted by JICA  13:30ICAO Specification of WGS-84 implementation & WGS-84 survey plan by JICA Expert  14:00WGS-84 coordinate survey managed by government and Data management in Japan by JICA Expert  14:30Outline of AIS with WGS-84 Coordinate by JICA Expert  15:00Summary  15:30Closing Remarks by CAAV

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 6. Expected Achievements: a) To publish WGS-84 coordinates of Air Navigation Facilities in AIP b)To authorize the surveyed data in Database for civil aviation use c)To operate WGS-84 Database system d)To develop next WGS-84 Data survey plan? e)To conduct WGS-84 survey by National Geographic Department? and/or CAAV, or to arrange WGS-84 Data survey to be conducted by other agency on a contract-based 4 7.Who should participate and can benefit: Organizations/Agencies responsible for flight procedure design/approval/implementation as well as WGS-84 data survey and management a)CAAV b)VATM c)NAC/MAC/SAC d)MONRE e)ATEC, Survey agencies

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Evaluation/Assessment of the Training ✈ Feedback from Counterparts participating in the Training is essential for JICA and Project to improve our programs. Training Certificate ✈ Certificate will be issued to participants who have attended all the Sessions and actively participated in activities (Participants will also be evaluated by JICA) ✈ Certificate is jointly signed by DCA DG CAAV DG and JICA Project Leader 5

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 6 Mr. Yuji NAKAGAWA Manager, Osaka Branch, Nippo Co. Ltd,. 1st Class License for Surveyor Professional Engineer (Registered in the fields of “Steel and Concrete Structure” & “Planning of Construction”) Mr. Yohei SHINDE Chief Surveyor, Nippo Co. Ltd, 2nd Class License for Surveyor Certificate for Bernese Introductory Course

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 7 1) WGS-84 Surveying procedures, Software, training, Procedures 2) Design of RNAV air routes PBN Training in CAAV, Standards, PBN Procedure 3) Flight validation Equipment, RADAR coverage 4) AIS (ISO9001, eAIP publication, NOTAM automation) QMS manual, AIS-DB, road traffic controller company implementation - Avionics, Training, operation procedures 5) RNAV,RNP operational approval Hand book, Training RNAV prediction Equipment GPS

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 8 Please Switch Off Your Mobile Phone or Use Vibration Mode in the Conference Room Thank You for Your Understanding and Cooperation