Emission Inventory System – Nonroad Inventory Due to the size of this webinar, all attendees will be muted, however, you are encouraged to ask questions.

Slides:



Advertisements
Similar presentations
National Emissions Inventory: why it matters, current status, and where were going Marc Houyoux Office of Air Quality Planning and Standards, US EPA 20.
Advertisements

Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
Emission Inventory System Reports Course Sally Dombrowski
CareCentrix Direct Training.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
Emission Inventory System – Nonpoint Inventory Due to the size of this webinar, all attendees will be muted, however, you are encouraged to ask questions.
Data Management and Analysis 1 Consumer Behavior Studies Plan Development and Assistance (Technical Advisory Group) SGIG/SGDP Build and Impact Metrics.
UIC Data Conversion and Submission via CDX Node Client UIC Database V2 6/16/
From TEISS To EIS Angelique Luedeker, ITEP/TAMS Center.
56TH ANNUAL WATER AND WASTEWATER OPERATORS' CONFERENCE April 17, 2013 NetDMR Update Shawn Hokanson SWPB Permit Support Supervisor Cheryl Edwards SWPB NetDMR.
NIMAC 2.0 Basics for AUs: Searching, Downloading, and Assigning Files & Using the Reports Options 1www.nimac.us.
Presented by the EPA AQS Team. Agenda Introductions Housekeeping/Overview of GoToWebinar Presentation Q& A session – use Question box to submit your questions.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
Emission Inventory System – Onroad Inventory Due to the size of this webinar, all attendees will be muted, however, you are encouraged to ask questions.
C-TPAT Security Link Portal Online Application. Online C-TPAT Application - Part 1. Part 1 of the Online C-TPAT Application process: Complete the Company.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Introducing... NPF Connect Press [Space Bar] to continue...
The National Emissions Inventory (NEI) Sally Dombrowski EPA-OAQPS.
1 Overview of Emissions Inventories Melinda Ronca-Battista, ITEP/TAMS Center.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
1 State Records Center Entering New Inventory  Versatile web address:  Look for any new ‘Special Updates’ each.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
1 Emissions Inventory System (EIS) Overview and Exporting Data from the EIS Sally Dombrowski EPA–OAQPS.
Lead Management Tool Partner User Guide March 15, 2013
Tribal Air Quality “Tools of the Trade” Lydia Scheer, ITEP.
Emission Inventory System Reports Course Sally Dombrowski
This tip sheet focuses on the elements required to access SMART. Total Pages: 5 Accessing SMART Logging In Agency/Facility/Program Access Logging Out IGSR.
1 Data Management And QA/QC Procedures In The United States And Canada Presented by Ms. Rebecca Lee Tooly USEPA Office of Air Quality Planning & Standards.
Inventory Needs and Legal Requirements Martin Johnson Emission Inventory Workshop Air Resources Board March 13, 2006.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Emission Inventory Quality Assurance/Quality Control (QA/QC) Melinda Ronca-Battista ITEP/TAMS Center.
Training Guide for Inzalo SOP Users. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP applications. The scope of this.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
Data Submittals to AQS Nate Herbst Southern Ute Indian Tribe.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Session Session 15 FAFSA on the Web - Onward and Upward!
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
1 Tribal Participation in the NEI Sally Dombrowski EPA–OAQPS.
11/24/20151 FETS & EPA’s NEI Providers, Features, Lessons Learned August 31, 2009 FETS Project Meeting Boise, ID.
Importing NEI Data From EIS Into TEISS Angelique Luedeker, ITEP.
IOWA Department of Natural Resources November Emissions Inventory Marnie Stein Environmental Specialist Senior Minor Source Inventory Update National.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
WRAP SCC Temporal and Speciation Profile Improvement Project Status WRAP Regional Modeling Center Carolina Environmental Program November 4, 2003.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker, ITEP.
Emission Inventory Input Format Eastern Canadian Premiers/New England Governors Conference Data Exchange Workgroup Gregory Stella U.S. Environmental Protection.
Importing NEI Data From EIS Into TEISS Angelique Luedeker, ITEP/TAMS Center.
1 Elements of EI Data Management Melinda Ronca-Battista ITEP/TAMS Center.
The New Bridge Tool Sally Dombrowski US Environmental Protection Agency, OAR, OAQPS, AQAD Emissions Inventory and Analysis Group May 19, 2015.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
Fab25 User Training Cerium Labs LabCollector - LIMS Lynette Ballast.
6/13/2016 U.S. Environmental Protection Agency 1 Starting a Facilities Flow Lee David
Elements of EI Data Management
Bulk Fuel,Gasoline and Diesel Event User Guide
To the ETS – Agreement Management Online Training Course
DrayWatch Training November 2009.
Guides to Reviewerss Journal of Mountain Science Guides to Reviewerss
For a new user you must click on the “Registration for Generator” link
CSDR Submit-Review Website Submitter Guide
TEISS Case Project Introduction
WRAP Technical Planning Meeting Salt Lake City, UT December 5, 2018
ETS – Air Data submission Training
Climate Surveys.
To the ETS – Agreement Management Online Training Course
Importing NEI Data From EIS Into TEISS
Presentation transcript:

Emission Inventory System – Nonroad Inventory Due to the size of this webinar, all attendees will be muted, however, you are encouraged to ask questions by using the ‘Question’ panel on your screen. We will answer as many questions as we can at the end of the webinar. If you encounter problems with the audio or other technical problems during the webinar, please let us know via the ‘question’ panel. We will begin promptly at 2:00 pm (EST) Open audio on the Go To Webinar panel to get the call-in number. 1

Nonroad Input and Emissions Data Submission Laurel Driver July 24,

EIS vs NEI Emission Inventory System (EIS) –Data repository for air emissions data used to create the NEI –Contains State, Local, Tribal and EPA submitted data –Can store multiple emissions values for the same unit/process –Can store annual, monthly, daily data (e.g., fires, events) –Data available via a password-protected web site EIS Gateway National Emission Inventory (NEI) –Snapshot in time from EIS –Inventory version shared with the public –One emissions value per process selected –Annual emissions values 3

S/L/T Reporting Requirement Air Emissions Reporting Rule (AERR) –Complete criteria pollutant inventory every 3 years All point sources (100 tpy potential to emit threshold) Nonpoint Sources Onroad and Nonroad sources Events (wildfires and prescribed fires) 2011 Emissions due 12/31/2012, EIS window opens 6/1/2012 –Annual reporting for type A point source facilities –SO2, NOx, CO with potential to emit > 2,500 tpy –VOC, PM, NH3 with potential to emit > 250 tpy –Pb with potential to emit > 5 tpy (to be amended to agree with Lead NAAQS level of > 0.5 tpy) –HAPs are submitted voluntarily by many S/L/Ts and are encouraged as part of an integrated report 4

Uses of the NEI The NEI is one of the key inputs for : –Modeling of national rules -NAAQS reviews, CSAPR, etc –Non-attainment Designations –NATA Review – toxics risk modeling –Trends reports and analyses 5

Components of the EIS Six different data categories –Facility Inventory –Point Emissions –Nonpoint Emissions –Onroad Emissions –Nonroad Emissions –Event Emissions (wildfires and prescribed fires) –No biogenic emissions, although these are part of EPA’s modeling files 6

Nonroad Submissions Emissions in NEI must be from an EPA- approved model –NONROAD (EPA) –Off-Road (California) EPA strongly encourages submittals of National Mobile Inventory Model (NMIM) National County Database (NCD) rather than emissions Tribes and CA should submit emissions 7

Why Inputs? EPA prefers to receive activity data instead of emissions as they allow for more in-depth analysis and consistent, integrated emissions in the NEI. If you do not submit nonroad input data, EPA will generate emission estimates using national defaults. EPA will provide a set of default nonroad inputs for agencies to review/ customize as desired Agencies may accept EPA defaults in lieu of submittals by sending a “support request” to EIS that states this. To the extent resources allow, EPA will assist agencies to build their submittals. 8

Support Request 9

Calculation of Emissions Why is EPA using NMIM? –NMIM runs the NONROAD model, and produces CAP and HAP results with common inputs –The EIS process to accept NCDs is in place and is the least resource intensive way to proceed until MOVES includes nonroad 10

Summary of NCDSubmittal Steps –Got to 2011NEI web page for instructions on onroad and nonroad input submittal instructions –Pick up your draft default NCD from EIS –Make changes and keep a complete NCD set –Compile Submission: 1. Folder of tables in.csv 2. Folder of External Files 3..txt file with documentation –EACH SUBMITTAL IS A COMPLETE REPLACEMENT OF PREVIOUS SUBMITTALS! 11

County vs State Submissions Encouraged to submit all activity data in a single submission Permitted to send one county file vs a complete State file NOT permitted to send a group of counties –NMIM can not accommodate county groups or Tribes 12

13 Pick up your draft default NCD

Nonroad NCD Tables included in download (blue ones are for nonroad) –baseyearvmt –county –countynrfile –countyvmtmonthallocation –countyyear –countyyearmonth –countyyearmonthhour –diesel –gasoline –naturalgas –state Preferred method –EPA to use NMIM –more in-depth analysis –consistent, integrated calculated emissions in the NEI EPA will provide default data –SLT can provide revised input NCD data Tribes and NCD Activity Tables –Can not accommodate Tribal lands, but tribes can use neighboring county NCDs for help with inputs –Submit emissions Can not submit NONROAD input files To the extent resources allow, EPA will provide assistance in building NCDs for submittal 14

Suggested Process: 1.Download file from EIS 2.Load to your local system 3.Make changes to tables 4.Save files to specified folders 5.Bundle and re- submit NCD tables are in.csv format The referenced external files are in ASCII format 15

How to Bundle Your NCD Activity Data for Re-Submission 16

Creating XML HEADER 2 ways –Using staging tables CERS and ExchangeHeader tables only -- currently under revision –Edit XML available from 2011 NEI page 17

Editing XML text <hdr:Document id="IDxx" xmlns:hdr=" xmlns:xsi=" instance" xsi:schemaLocation=" Your Name Your Organization EIS T14:02:39 EISv1.0 SubmissionType QA DataCategory Nonroad NCDDataFile Sample_submission_file.zip <cer:CERS xmlns:cer=" xmlns:xsi=" xsi:schemaLocation=“ youruserid.gov yourPSC

What Will Be Checked QA checks on: –Limited checks will be done on the NCD tables –No checks will be done on the external reference files, but naming convention and presence are checked. –THE REJECTION OF ANY ACTIVITY DATA WILL CAUSE THE REJECTION OF THE ENTIRE SUBMISSION 19

What EPA will do with submittals Collect and compile submitted NCD Do QA checks Contact agencies with questions Run NONROAD via NMIM model for CAP/HAP at monthly or finer level Load emissions into EIS 20

Emissions Submittals Agencies may submit emissions, but inputs are preferred Multiple emissions data are accessible in EIS. If an agency submits, EPA and SLT data will be present. 21

Nonroad Emissions Submittals Requirements for submitting onroad emissions inventory –CERS –Exchange Header –Location –Emissions Process –Reporting Period –Emissions Optional –Excluded Location Parameter 22

Required - CERS Required –User ID (EIS login) –Program System Code –Emissions Year Optional –Model –Model Version –Emissions Creation Date –Submittal Comment 23

Required - Exchange Header Required: - AuthorName - OrganizationName - DocumentTitle (EIS) - DataFlowName (EIS_v1_0) - SubmissionType ("QA" or "Production") - PropertyName ("Data Category") - PropertyValue ("Nonroad") Optional: - Keywords - Comments - PropertyName ("NCDDataFile" - required when submitting NCD data) - PropertyValue (the name of the NCD zip file being submitted - required when submitting NCD data) 24

Required - Location Required –State/County FIPS or Tribal Code Optional –Census Tract Identifier –Shape Identifier –Location Comment 25

Required - Emissions Process Required –State/County FIPS or Tribal Code –Source Classification Code –Emissions Type Code Optional –Census Tract –Shape Identifier –Process Comment 26

Required - Reporting Period Required –State/County FIPS or Tribal Code –Source Classification Code –Emissions Type Code –Reporting Period Type Code Optional –Census Tract and Shape Identifier –Calculation Data Year – Only Onroad –Calculation Data Source – Only Onroad –Reporting Period Comment 27

Required - Emissions Required –State/County FIPS or Tribal Code –Source Classification Code –Emissions Type Code –Reporting Period type Code –Pollutant Code –Total Emissions and UOM Optional –Census Tract and Shape Identifier –Emissions Comment 28

Creating XML File via the Bridge Tool Select the Data Category being converted. Browse for Access file and select “Start”. REMEMBER: The Bridge Tool works on Access If your file is saved as Access 2007 or later, you will need to do a “save as” to Access 2003 prior to using the Bridge Tool. 29

Common Bridge Tool Errors Look at your xml file prior to zipping it using Note Pad or your web browser. Make sure you see all of the components. 30

Submitting the zipped XML File Two methods –Node-to-node –CDX web client (most common method) Use Gateway login and password QA and Production Environment –QA is always open to check your data. Does not change anything in the EIS –Production submission is your official submission and will update the EIS –Recommend always sending to QA first 31

32

Select EIS from the left-hand side bar 33

Browse for your ZIPPED XML submission file. Then complete your notification. This can be more then one address. Then select “Submit”. 34

Notifications First , from “CDXNotification”, immediate – Transaction Status: Pending Second , also from “CDXNotification”, when EIS completes processing –Transaction Status: Completed. Feedback report is available at EIS Gateway Third , from “noreply” (EIS Gateway), on quarter hours –Status : Completed or Failed Wrong file submission error – Usually a zipped Access file is submitted instead of the xml file Window closed error – “User, agency, submission year not authorized” Completed might be for an XML file containing no data Go to EIS Gateway and read the Feedback Report and resolve any critical errors and Potential Duplicates 35

36

The Feedback Report Summary Page –Name of submitter –What environment submissions was made to QA or Production –Data Category submitted Nonroad –Total number of critical and warning errors. 37

Feedback Report Critical Errors The most important page of your feedback report All critical errors must be resolved prior to submitting to Production 38

Feedback 39

Feedback 40

When will my data show up in EIS? Nonroad data on the Gateway is available immediately Reports available the next day 41

Nonpoint/Onroad/Nonroad Emissions 42

Agency Submission History Report 43

How do I get data out of EIS? 44

Report Downloads 45

How does EPA Check Your Data? Again, inputs are strongly preferred. Submitted emissions are compared to EPA’s for pollutants covered, disagreement between CAP/HAP, anomalous emis type/pol combinations, SCC coverage, etc. 46

Common Problems Overwriting previous submittals. Several submitters in trying to update/correct emissions values, submitted only one pollutant which overwrote previous submittal which contained many pollutants Poor use of emission type. For example, all emissions as evap does not make sense. Bad emis type/pollutant combinations (e.g., evap pm) 47

Contacts Submittal Issues -Sally Dombrowski Inventory Issues –Laurel Driver – Mobile Sources NONROAD model Issues 48