CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC.

Slides:



Advertisements
Similar presentations
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
The Big Picture Brand-new library / media center building Brand-new kinder classroom building Brand-new kinder playground and covered pavilion Renovated.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
Basics of Bus Routing 65 th Annual FAPT Summer Symposium June 24, 2013 Punta Gorda, FL. Presented By: Jamie Warrington FL. Dept. of Education Transportation.
J.R. Smith Elementary School How to arrive and leave safely.
Traffic Notes Arlene Hein Elementary
SCHEMATIC DESIGN PRESENTATION
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
NORTHFIELD COMMUNITY SCHOOL Elementary School Entrance Cedarbridge Road Side NORTHFIELD POLICE NJ 1.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Facilities and Programmes – Peterborough Agricultural Society Office Office Offices and meeting rooms for Peterborough Agricultural Society members.
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Santa Susana High School Parking Lot Safety. If you know your ride will show up before school is out, ask your ride to park in a parking spot until you.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Suisun Valley School K Classroom Addition Project.
Safe School Bus Routes and Bus Stop Placement A quick review on keeping your routes and bus stop locations safe. Presented By: Karen Strickland, Osceola.
Guide To School Bus - Purchasing
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Capital Project 2016 Members of the Bloomfield Facilities Committee Frank Young – BOE Jim Spelman – BOE Pam Nakoski - BOE (at large) Ian Caspersson – Community.
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Morning Arrival 9:00-9:15 BREAKFAST Children who eat breakfast at school may enter the building at 8:50. Please drop them off at 8:50 so they can go to.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Parent Drop off Please drop off between the cross walks. Pull up as far as possible. Do not let your students out before the crosswalk. If you pull into.
+ Kindergarten Orientation June 10th, Welcome to Kindergarten! St. Jerome Class of 2022 Current count: 17 students Supply list and contact.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Dún Laoghaire Area Committee Meeting 8 th April 2015 Non Statutory Public Consultation Proposed Road Safety Improvement Works at Schools on Cross Avenue.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
2015 Kindergarten/New Student Orientation. Orientation Welcome Break the ice Meet important staff Ask questions Learn about NES Visit classrooms.
STATE HIGH PROJECT Agenda ● Background ● Design ● Financial ● Questions C RABTREE, R OHRBAUGH & A SSOCIATES ARCHITECTS.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
IMPACT OF ADDITIONAL RESIDENTIAL DENSITY ON Redevelopment of North Toronto Collegiate Institute February 19, 2004 Architects Crang and Boake Inc. Teeple.
Albrecht Pick-Up and Drop-Off Procedures The following side show has been developed to help parents and students know and understand our pick-up and drop-off.
THE LOOP Introduction to the car-line Safety is our number one priority!
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HISD | Milby High School Transition Plan Milby High School Transition Plan May 2014 HOUSTON INDEPENDENT SCHOOL DISTRICT.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
School Traffic Safety - Quail Summit School Traffic Circulation Plan.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
FOOTHILL ELEMENTARY TRAFFIC PROBLEM SOLVING May 19, :30 p.m.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Munday CISD Areas Targeted for Improvement. Currently Day Care, Elementary Music and Reading Classes in 3 separate portable, temporary buildings New addition.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Traffic Management/Safe Walk Routes January 21,
White Pigeon Community Schools
Building Services Summer 2016 Update
Capital Facilities Program Update San Rafael City Schools
UPDATE: 8/8/2011 Batavia City School District
Woodbrook ES Addition & Modernization
ET 494: Senior Design Design of a New Hammond Head Start Center
Concept Plan for Proposed Park Near Hopewell School
Dismissal Staff Quick Start Guide
POINT PARKING SCHOOL YEAR
Recent Bond Accomplishments
WELCOME WELCOME.
Stoughton Public Library
Where do you go from here?
Presentation transcript:

CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC

PROJECT GOALS 1.Increase safety of students by separating bus unloading and parent pick-up/drop off areas 2.Maintain existing levels of parking or increase if possible

Karen Marcus – Principal Barbara Albertson – School Bus Coordinator Bonnie Hagerman – PTO Representative Sheri Wilkerson – County Schools Fleet Management Joe Letteri, Lisa Glass – County Schools Building Services Neale Craft, Montie Breeden – County Facilities Development Jim Boyd, Patricia Jessee – HB Architects, PC John Hash – Timmons Group DESIGN COMMITTEE

Crossing bus and parent traffic during loading and unloading EXISTING ISSUE

EXISTING SITE PLAN

Bus Loading Zone

EXISTING SITE PLAN Bus Loading Zone Parent Parking & Drop-off Area

EXISTING SITE PLAN Bus Loading Zone Parent Parking & Drop-off Area

Separate bus and parent loading by creating new parent drop- off/ pickup loop at the lower level of the school. DESIGN STRATEGY

PROPOSED PLAN

DEMO PLAN Remove existing rear parking lot, relocate (4) mobile classrooms to other schools.

Front Loop: Bus loading will continue in existing manner. PROPOSED DESIGN

DROP-OFF LOOP

New Parent Drop-off Loop: avoids children and parents walking through bus line expands current parking capacity by 17 spaces improves vehicle stacking capacity provides opportunity to improve drainage problems at new loop area maintains access to athletic fields beyond will be fenced off from play areas uses existing covered space as Vestibule PROPOSED DESIGN

New Student Vestibule – Provides for proper supervision of waiting students Re-purposes existing covered space EXISTING CONDITIONS

VESTIBULE ELEVATION New Storefront at Existing Roofed Area

GREEN FEATURES Improved storm water management with bio filter New air lock at vestibule entrance to reduce energy costs Efficient site lights at new drop-off loop to meet County requirements and Dark Skies Ordinance

Construction Budget - $360,000 Project will include bid alternates, including portion of new parking spaces as rear. Project Schedule – Complete construction drawings – mid spring 2010 Receive bids – late spring 2010 Construction – complete summer 2010 If necessary, new rear loop work can extend into 2010 school year without affecting daily school operations. PROJECT BUDGET & SCHEDULE

SITE IMPROVEMENTS