RELIABILITY Customer Meeting November 5, 2009. 2 NY Investment Plan  Supports National Grid’s vision to be the foremost electricity and gas company,

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPL Hurricane Assessment Operating Committee January 25, 2005.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Microgrids and Infrastructure Resiliency RPI Microgrid Workshop Stuart Nachmias October 10, 2013.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
1 What is Operations NU 4 Distribution Companies $1,311M Cap 32,000 Interruptions 67,000 Trouble Calls 40,000 miles of infrastructure 2 +
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
An Overview of Our Regulatory Proposal
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
AmeriCorps in Times of Disaster AmeriCorps Conference July 23,
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
© 2007 PPL Electric Utilities Energy Outlook: 2008 and Beyond Small Business Development Center Lehigh University November 7, 2007 Tom Stathos PPL Electric.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
Outage Communication – Improving the Flow of Information Presented at the EEI Transmission, Distribution, and Metering Conference Tucson, Arizona October.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
The ArcGIS Platform for Storm Response in Electric Utilities Kevin Kirk & Brian Baldwin.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
© 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Wildfires, Vegetation Management and Powerlines Presented to Senator.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
Metering Americas April 24, 2006 Advanced Metering.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Resiliency and Reliability
Utility Needs and Smart Grid for Major Storm Events
Predictive-Based Maintenance Strategy
Hurricane Preparedness Plan 2008
Mobile workforce management solution
Across the entire value chain
Ice Storm 2013 Technical Briefing
Pacific Power Seismic Preparedness Update
Key Performance Indicators
Smart Energy Infrastructure
AGA Operations Conference
Meeting the challenge: Electrification and Climate Change
Presentation transcript:

RELIABILITY Customer Meeting November 5, 2009

2 NY Investment Plan  Supports National Grid’s vision to be the foremost electricity and gas company, delivering unparalleled efficiency, reliability, and safety vital to the well-being of our customers and communities.  The capital plan will deliver our objectives around safety, reliability, efficiency, and customer satisfaction  The Customer reliability objectives are a primary driver of our capacity projects, reliability programs, and asset replacement programs. The capital plan is designed to:  Deliver performance that meets all regulatory targets  Begins the renewal of our aged infrastructure to deliver a sustainable network.  Provide our customers with a reliable, cost effective service

3 Capital Investments for Reliability  Reliability Enhancement Program –  $1.47 Billion for Upstate NY  2007 – 2011 Commitment period

4 Key Drivers of Investment System Capacity and Stability Capital expenditures undertaken to upgrade the capability of the T&D delivery system beyond minimum requirements in order to provide improved thermal loading, voltage, stability, reliability or availability performance. Asset Condition Capital expenditures required to reduce the risk and consequences of failures of T&D assets e.g. replacing or upgrading system elements such as overhead lines (including wood poles), underground cables and substation equipment Statutory or Regulatory Requirements Capital expenditures required to ensure that the T&D facilities meet the minimum legal, regulatory and contractual obligations of the Company. These items include New Business Residential, New Business Commercial, Outdoor lighting, Third party attachments, Land Rights, and Public Requirements including Municipal, State and NERC / NPCC requirements.

5 Key Drivers of Investment Damage/ Failure Capital expenditures required to replace failed or damaged equipment and to restore the T&D system to its normal operating configuration and capability following a storm or other event. Damage may be caused by storms, vehicle accidents, vandalism or deterioration, among other causes. Other Other - Capital expenditures that do not fit into one of the other categories or used as a placeholder for future reallocation

6 Capital Investments for Reliability

7 Capital Investment Program ProgramDescription Broad Based / Targeted 2009Examples Asset Condition Overhead and underground lines and substation equipment age, performance and condition Broad Based Breaker Replacement – Dewitt Station Replace metal clad at Springfield Station Rathbun Labrador line (Cazenovia & Fenner) upgrade 100 structures Tilden Tully line (Onondaga & Lafayette) 33 structures Sweet Rd. (Manlius) 2+ miles of wire upgrade

8 Capital Investment Program ProgramDescription Broad Based / Targeted 2009 Examples System Capacity & Stability Loading, voltage and stability of overhead and underground lines and substations Targeted New East Malloy Station with 4 feeders Miller St. Station added feeder and replaced bkr Nelson Rd. (Cazenovia).4 mile wire and voltage upgrade Young Rd. (Onondaga).5 mile wire & 22 pole voltage upgrade County Rt 12 (Central Square) rebuild 3 miles wire upgrade Cortland load relief

9 Capital Investment Program ProgramDescription Broad Based / Targeted 2009 Examples Statutory/ Regulatory Program work that is regulatory or statutory driven - New Business, Outdoor lighting, Third party attachments, Land Rights, and Public Requirements including Municipal, State and NERC / NPCC requirements. Broad Based Destiny expansion – UG add switchgear and reconductoring Jefferson Commons – expand UG svc in downtown Syracuse Hamilton Homes, Oswego – New UG primary system to replace 1950’s system. 4 new hotel/motels in Syracuse – new UG svc. Hope Lake water park, Greek Peak – new UG svc.

10 Capital Investment Program ProgramDescription Broad Based / Targeted 2009 Examples Damage/FailureReplace failed or damaged equipment Broad Based As damage or failure occurs OtherOther capital work Broad Based Install 20 pole top reclosures in Central Region

11 Reliability – PSC Indices CAIDI - Hours Actual 2007 Actual 2008 Forecast 2009* Goal 2009 Central Region SAIFI - Hours Central Region *Forecast as of October 14, 2009 CAIDI — Average time required to restore service SAIFI — # of times the average customer is without power each year.

12 Emergency Response - Electric

13 National Grid Emergency Response Structure  National Grid is migrating its processes and structure to align with National Incident Command Structure –ICS  The Incident Command System:  Is a standardized, on-scene, all-hazard incident management concept  Allows National Grid to adopt an integrated organizational structure to match the complexities and demands of single or multiple incidents

14 Storm Response  Crew Response Utility Mutual Aid Local Region crews Local Division crews Contractors Other NG Division crews Other trained NG Dept. crews from Substations, Metering etc. # Customer Outages

15 Northeast Region Mutual Assistance Group NY Mutual Assistance  ENERGY EAST( NYSEG/RGE)  ORANGE & ROCKLAND  CENTRAL HUDSON  NATIONAL GRID (Upstate NY, New England, Long Island)  NORTHEAST UTIL (CL&P) -- note that NEU is not in NY State but has been grandfathered into our meetings.  CON EDISON  FIRST ENERGY (OH/PA/NJ) Canadian Companies  New Brunswick Power  Hydro One  Hydro Quebec

16 Planning Process In preparation of Forecasted Storms we:  Conduct System and Regional preparation meetings, including meteorologists  Review the number of internal crews, support personnel, contractor tree crews, and outside crews that are available

17 Restoration Process Initial Response  Make it Safe  Respond To Wires Down – Standby As necessary  Respond to Requests of Public Safety Officials  Clear Roadways  Restore Service to critical facilities where ‘quick wins’ can be achieved  Activate plans for mutual aid deployment and staging area for construction

18 RestorationProcess Restoration Process During the Storm  Number one priority is Safety  Severity of the storm will dictate response strategy  Track outage calls within our outage management system to drive most effective restoration strategy  Communications with Public Officials via municipal calls throughout event

19 Municipal Customers Energy Solutions Services  Manage Key Customers  Preparation  Pro-active customer contact to anticipated affected customers  Account Managers or Consumer Representatives  iAvenue – Global Connect Broadcast auto call system.  During the Event  ESS personnel assigned to County Emergency Operation Centers, National Grid Regional Control and Storm rooms  ESS remains in contact with affected customers/municipalities  Critical Care customers are assigned Consumer Representatives to initiate contact

20 Municipal Customers Municipal Conference Calls  VP of Customer Operations & Regional Executive coordinate calls  Information provided:  Damage Assessment  Safety Precautions implemented  Summary of Company resources being used  Estimated Restoration Times  Communities will be canvassed for critical information to help prioritize power restoration  Account Managers & Consumer Representatives responsible for contacting their respective municipalities

21 Other Reliability Programs How Other Reliability Programs Correlate to Storms  Stronger Infrastructure  Poles & Cross-arms  New components & Safeguards  Insulators, cutouts, animal guards  Minimize Tree Related Outages  Cycle Trimming  Uniform Clearances  Hazard Tree Removal All combining to minimize outages during Storms

22 Other Reliability Initiatives How Other Reliability Initiatives Correlate to Storms  Field Crews Improved Performance through  Smarter, more focused approach  Restoration methodology - Applying “switch before fix” ensuring all potential customers are restored prior to making a repair.  One Person Crew program – “Trouble Shooters”  First Responders –Central Region  7 crews, 6 days a week, 24 hour coverage All combining to improve restoration response

23 Storm Response  Storm Updates  Check National Grid Website under New York then Storm Central 

24 Storm Response