Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
Advertisements

1 Personnel Protection System (PPS) – Definition Interlock system, to protect personnel from Ionising Radiation (and other hazards) –(Note: does not include.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Controls and Monitoring Implementation Plan J. Leaver 03/06/2009.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Pete Owens MICE Controls & Monitoring Workshop 25th September 2006 MICE Control and Monitoring: General Architecture Subsystem Integration User Interface.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Applied Science Division MICE Prototype Control System T W Bradshaw April 2004 MICE Proto Control System Organisation.ppt.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Controls and Monitoring Status Update J. Leaver 29/05/2009.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Control System and Software Engineering Process Elder Matias
MOM Report Galina Vankova RAL, MICE Video Conference.
Project manager report paul drumm CM16 October 2006.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Electrical & Control Power Supplies Trevor Hartnett.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
ERLP will be a fully functional prototype for the Forth Generation Light Source (4GLS) a new machine to be built at Daresbury Laboratory. 4GLS will be.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
Jefferson Lab Report Karen S. White 11/14/00. Overview  Status of Jefferson Lab Control System  Work In Progress  Transitioning to Operations.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
ICS WP3 – Software Core Components Suzanne Gysin Work Package Lead November 25, 2014.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Chris Booth Sheffield 29th March 2006
MICE RF System Power Supplies, Control and Monitoring Status report
MICE Control System.
Current Status of IPM-Linac Control System
MICE Target Report Video Conference 29/11/07
ESS Main Control Room & ICS Infrastructure
TS2 PSS; update on concepts of operation and system's architecture
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory

CM Pete Owens – Daresbury Laboratory General Philosophy Control system is based on EPICS. In general, individual groups are to be responsible for interfacing their own equipment to EPICS DL will provide overall infrastructure and support In agreed cases, DL will take responsibility for developing individual EPICS applications eg. Beamline PSUs, Decay Solenoid PSU etc. Naming convention Long-term support. Who will take on operational responsibility for day-to-day management of systems?

CM Pete Owens – Daresbury Laboratory EPICS tools Channel Access (CA) Display Manager (EDM) Archiver Alarm handler Backup and restore Strip Chart Etc.

CM Pete Owens – Daresbury Laboratory Naming Convention Device:Subsystem:Record A-Z, 0-9, -, : MICE-PC-MQ-03:VOUT MICE-VA-VALVE-06:ILK MICE-VA-IMG-002:RLA:SP

CM Pete Owens – Daresbury Laboratory Status of individual projects Network Personnel Safety Beamline PSUs Decay Solenoid PSU Hydrogen System Target Tracker RF System Control Room

CM Pete Owens – Daresbury Laboratory Network Network layout drawn up, circulated to interested parties and agreed. All sockets will be configurable between MICE Control network, Visitor network, RAL office network or telephone Rack and all network equipment purchased and ready for installation To be transferred to RAL on Wednesday

CM Pete Owens – Daresbury Laboratory PATCH PANEL Sockets in MICE LCR and hall 100 to 150 TELEPHONES x12 NETWORK SWITCH SITE FIBRE FEED DATA AQUISITION PC ATLAS CENTRE FIBRE Network Rack

CM Pete Owens – Daresbury Laboratory Personnel Safety PPS hardware and logic has been designed, procured and the racks built and tested. An EPICS interface will be provided for remote monitoring of operation. XML gateway to be added to feed information back to the ISIS control system. Still some issues remaining about the hall search philosophy, siting of search buttons etc.

CM Pete Owens – Daresbury Laboratory Beamline PSUs Racks built up – imminent delivery to RAL 12 Danfysik System 9000 PSUs RS422 serial comms to IOC EPICS database EDM user interface

CM Pete Owens – Daresbury Laboratory Decay Solenoid PSU The power supply has been tested at DL Control electronics have been reverse engineered PLC system was old, complex and difficult to support so has been abandoned in favour of an EPICS IOC Quench detection and heater control electronics have been refurbished and tested New control software scheme has been agreed IOC being built up.

CM Pete Owens – Daresbury Laboratory Hydrogen System Meetings have been held to discuss control requirements for the H2 system Little progress possible until the decay solenoid system is complete.

CM Pete Owens – Daresbury Laboratory Target Sheffield group responsible for providing the control interface to the target drive system DL will provide training, advice if necessary

CM Pete Owens – Daresbury Laboratory Tracker Imperial to develop their own EPICS software to control the tracker. DL will provide training, advice if necessary

CM Pete Owens – Daresbury Laboratory RF System Design review planned to be held at DL in the next couple of months. This will include control requirements

CM Pete Owens – Daresbury Laboratory Control Room  2 Servers  2 Console PCs  Currently being configured at DL