MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
STFC Technology Target wheel eddy current modelling James Rochford On behalf of the Helical collaboration.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
MOM report – part I Roumen Tsenov as MOM ( )
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
LIGO-G09xxxxx-v1 Form F v1 The Viewfinder Telescopes of Advanced LIGO’s Optical Levers Michael Enciso Mentor: Riccardo DeSalvo Co-Mentor: Tara Celermsongsak.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Chris Booth Sheffield 29th March 2006
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
Status of Target Design
Presentation transcript:

MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007

2 Target Progress Summary Target Review - Decision to continue working with the present control system rather than design from new. Target Acceleration has been increased and it is now able to get into and out of the ISIS beam in time. Long term testing of both the hardware and control software is now underway. Control software appears to be robust ->Testing has enabled minor issues to be resolved. Target cooling appears adequate at the required acceleration. Actuator runs at about 65 deg C Target Bearings are wearing out very quickly. We are currently in the process of trying to resolve this by looking at alternative bearing materials. If we can solve the bearing issues then progress looks good for installation onto ISIS later this year

3 Target Review March 07 A target review meeting was held at Daresbury Laboratories in March 2007 to look at whether a new control system was required. It was agreed that designing a new system from scratch was not feasible in such a short period of time and so work would continue on improving the present design. This was felt not to be without it risks… Disadvantages: –Significantly lower processing power by continuing to use an 8 bit controller –Not been able to implement various feedback algorithms which we feel would further stabilise the targets trajectory –We cannot use all of the positional resolution that we have available. This means we don’t have the degree of control that we would have liked

4 Reminder of Target Specifications: ISIS runs at 50Hz ~10ms beam on and acceleration + 10ms beam off We need to intersect the last ~2ms of a given ISIS pulse without causing beam loss at any other time The target will run at 1Hz intercepting just 1 in 50 of the ISIS pulses Last autumn we ran some tests at ISIS that allowed us to build a profile of how the beam radius alters with time at the target point in the vertical direction. The original specification was to have the control over the position to which the target dips to within +-0.5mm

5 BEAM RADIUS Time ms Distance from beam centre mm Required Target Trajectory ~80g Acceleration Target intercepts ISIS beam for ~2mS ~30ms

6 Top Bearing Bottom Bearing Magnets Coils Water Cooling Simplified Diagram of the Internal Mechanics

7 Target Progress Temperature Protection system put in place April 07 – This allows unsupervised 24/7 running Power supply received from Daresbury - Tested at Daresbury up to 70 Amps - Theoretically it could deliver up to 80 Amps Note that we had previously only been able to deliver 10Amps to our actuator! Started running at low currents for several hours at a time Increased the coil currents as confidence with the system increased and problems were resolved. Running at 60 Amps coil current. (Will shortly show how that corresponds to acceleration and trajectory)

8 Photos of Setup

9 Target Reliability We have started some long term testing with the target, so what do we need to achieve? Lifetime of about 6 months between replacements Running at 1 Hz 8 hours per day: 5 million actuations 24 hours a day: 15 million actuations Long Term stability How repeatable does the movement need to be? What long term changes do we see? – mechanical Reliability of control electronics and power supply

10 Target Progress Using 2 shafts Light ~ 27 grams Cross Section Heavy ~ 35 grams Square Section Each of these uses different bottom bearings (top bearings are interchangeable Clearly we would like to use the lighter one as it gives a higher acceleration for a given coil current. This is the one that is designed for use in ISIS.

11 Target Drops & Control Reliability The target is held out of the beam electromagnetically and so any problems with the control electronics can result in the target being dropped. Result of a target drop is that the target will fall into the ISIS beam and the beam loss will trip ISIS off. Clearly we would like this to happen as little as possible but it is a possibility that needs to be considered The baseline that we have been given is that the target needs to be reliable enough so that it doesn’t drop more than once a day. ~ 1 in every pulses.

12 10 Amps ~15g Dip Depth Dip Time 20 Amps ~31g Acceleration Achieved – Heavy Shaft 30 Amps ~43g 40 Amps ~59g 60 Amps ~85g

13 Table to show the Number of Actuations Performed in the Testing as a Function of Actuator Current and how this Translates into Target Acceleration Note that target travel is 44mm And also note that dip time here refers to the time for the target to get from top to bottom (i.e. half of it’s trajectory)

14 DAQ - What are we measuring? The sorts of trends that we are looking for include: Changes in dip depth over time The spread in dip depth The time it takes for the target to reach the required dip depth and how this changes over time Changes in start position This is still under development as it is only recently that we have acquired enough data to be able to start looking for ‘interesting’ things! The following plots represent a run at 60A using the heavy shaft ~250K events. Please don’t read too much into these at the moment, they are provided as examples! Gradual Drift over 250,000 pulses. Is this bearing wear? Ignore! Dip depth was changed manually at the start of the run

15 Target Reliability Two main problems: 1)Glitches in the electronics that caused the target to drop. Possible origins of the glitch? Dust from bearing wear? Electrical Noise - Poor Grounding, Poor Screening Poor Connectors The Glitching now appears to be a solved problem as shown on the next slide 2) Bearing Wear - Revisit in a couple of slides time

16

17 Target Reliability Bearings – We were running on ceramic bearings Photos on next slide– Wearing out in typically around 100,000 actuations 3 possible elements to this problem –Is the Bearing material not suitable? – Ceramic material is relatively ‘soft’ –Is the shaft not straight? –Is there a radial force on the target shaft?

18 Typically ~100,000 Actuations

19 Target Reliability Changed to Brass/Aluminium Bearings -> These appear to be wearing much better BUT brass is not an approved material for use in ISIS PHOTOS are on the next slide Square Section Shaft seems to run much truer than the cross section shaft. Bearings wear more slowly using the Square (heavier) shaft Have yet to address how much any off-axis force has to bear on this situation – Possible causes: –Coil misalignment – What are the acceptable tolerances? –Any off axis misalignment of the target with respect to the coils –These effects must be small – Awaiting some FE simulation results from our R.A. M. Mohammed

20 Typically ~250,000 Actuations

21 Target Reliability Designing some bearing mounts that use ruby bearings. Hopefully these will be much more hard wearing. Questions? –Why are the bearings wearing so quickly? –Is this a problem with the stator design? Off axis forces? –Is there a problem with the target shaft? Is it perfectly straight? –Will the new bearings actually eliminate the problem or will some wear still be expected and if so: –Will the production of dust from wear be an issue for use of the target in ISIS? We expect that we will always see some bearing wear and therefore there will always be some dust produced

22 Installation Target electronics is being situated in the atrium outside of the synchrotron entrance. Waiting for confirmation of cable run lengths The original intention was to install onto ISIS in late June. Clearly with the problems that we’re having with the bearings this isn’t going to happen. End of our window of opportunity for installation this summer is mid July 07. This date looks tight but may be possible if we can solve the bearing wear problem quickly? Next installation opportunity after this will be Christmas 07.

23 Remaining Work Interfacing issues with ISIS & MICE needs to be looked at in further detail – This was started yesterday with the installation meeting. Control Electronics crate needs rebuilding –Extra protection circuitry added to protect power amplifier –Delay circuits to interface with ISIS signals –Interlocks to prevent system changes without a physical key –Driver circuits for signalling Power Supply for control electronics Temperature monitoring for DAQ Etc i.e. Much still to be done! (as is usual!!)

24 Conclusions A Very Significant amount of progress has been made with the target. The target is now Operating at the ‘specification’ acceleration. We are working to improve the reliability of the mechanism to prevent target drops. Basically there. Bearing Wear is probably now our single biggest concern. We would like to have longer runs so that long term trends can be monitored more effectively on the DAQ (but we will need better bearings before we can do this!)

25 2 High Speed Photographs (10mS) taken of the target movement at 80g acceleration