WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.

Slides:



Advertisements
Similar presentations
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Advertisements

SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
POTF Status update.
1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
Path Operator Task Force Recommendation
Presented to PGDTF February 11, 2015
PER
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Goshen Area Bus Reconfiguration
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
Path Operator Implementation Team Report to OC March 25, 2015.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
1 Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Peak RCCo Performance Metrics Draft –November 2013.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
CIIMS Update Stacen Tyskiewicz CIIMS Chair March 22, 2016.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
Stacen Tyskiewicz CIIMS Chair July 12, 2016
RAC Implementation Status
Brett Wangen Director of Engineering, Peak Reliability
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Western Electricity Coordinating Council
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Doug Reese, USFEATF Chair
Project WECC-0100 Update Load Modeling Task Force
Planning Tools Overview
Mgr. Interconnection Reliability Initiatives
Vic Howell – Mgr. Operations Engineering Support
Enhanced Curtailment Calculator (ECC)
Path Operator Task Force Kickoff April 3, 2013 Webinar
Coordinate Operations Standard
Planning Coordinator Gap Update March 25, 2014
RAC Implementation Status
Doug Reese, USFEATF Chair
Planning Tools Overview
Path Operator Task Force Kickoff April 3, 2013 Webinar
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas

2 Recap POTF New Paradigm and Potential Implication for Planning Next Steps Topics

3 The Path Concept White Paper was approved by the PCC and posted on the PCC Documents web site New PCC Path Concept Task Force was populated to continue work with the POTF Recap

4 Chuck Matthews (BPA) Jim Tucker (Deseret G&T) Abbas Abed (Navigant) Don Johnson (Portland General Electric) Gordon Dobson-Mack (Powerex) Brian Keel (SRP) Chifong Thomas (Smart Wire Grid) - Chair Rabi Kiran (SCE) David Franklin (SCE) Peter Mackin (USE) Bob Easton (WAPA-RMR) Branden Sudduth (WECC) Path Concept Task Force (PCTF)

5 To ensure that Facility Ratings and voltage limits are not exceeded in both the pre- and post-Contingency state To ensure that stability limits are not exceeded in the pre-Contingency state. Pre-Contingency stability limits are established to ensure pre- and post- Contingency BES stability. Ultimate reliability objectives

6 The “Path SOL” concept goes away: o While Facility Ratings and voltage limits pre- and post- Contingency are always SOLs, a Path itself does not have an SOL. The only time the Path itself has an SOL is when the Path happens to coincide with a monitored stability limit. o Instead, a Path has a Transfer Capability or Total Transfer Capability (TTC) as defined in the NERC Glossary of Terms Exceeding an established Transfer Capability or a TTC in real-time does not constitute SOL exceedance POTF Conclusions/Recommendations that can Impact Planning Processes

7 Operators should monitor actual Path flow against pre- determined TTC values to provide operator awareness of when reliability issues might be expected to occur WECC Path Ratings serve as a TTC cap for WECC Paths. TTC still needs to be determined: o Transfer analysis studies need to be run throughout the operations horizon to determine stability limits – even if voltage or thermal constraints are encountered at lower transfer levels Proposed to have agreements and understanding of who calculates TTC for every ATC Path in WECC. POTF Conclusions/Recommendations that can Impact Planning Processes

8 For TTC – Run transfer analysis studies ahead of time to determine the Path TTC. Allocates the Path TTC among TOPs who operate TTC Facilities on that WECC Path. For Reliability – Run transfer analysis studies ahead of time to determine stability limits and to identify thermal and voltage limitations that could be encountered. Changes in Operator Activities that can impact Planning Process

9 SOL exceedances (as indicated by real-time tools) to be mitigated by the most appropriate or effective means: With internal congestion management tools (CAISO and BPA have these), and/or Locally according to operational plans and procedures, or Op Guides, and/or With interconnection-wide congestion management tools administered by Peak RC. Changes in Operator Activities that can impact Planning Process

10 How do nomograms fit in to the new paradigm? Possible Solutions: o Nomograms determine TTC, not SOL. o TOP that identified flow interactions between two ATC paths needs to continue to coordinate on TTC establishment for those paths. Remaining Issue(s) that can Impact Planning Process

11 If Path Ratings are TTC caps, and nomograms determine TTCs o Can the real-time Path flow exceed the established Path Rating?  If so,  Should the potential exceedance be estimated ahead of real- time?  Should the TTC facility owner(s) be required to request a TTC exceedance?  How should impacts on other systems due to real-time TTC exceedance be accounted for?  How would the planner know when this happens and plan for system improvements? Questions for Planning Processes

12 o If a Path Owner requests to increase the seasonal or real-time Path TTC, would the Path Owner then be required to go through the Path Rating Process?  If not, what does it mean to have an Accepted Rating? o Other issues? Questions for Planning Processes

13 Identify issues and develop solutions Next Steps

Questions?