Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
5 th LHC Radiation Day Radiation response of RADMON sensors T. Wijnands (TS/LEA), C. Pignard (TS/LEA) Acknowledgements : UCL Louvain-La-Neuve, PSI Villingen,
Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.
Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
News from ESA-CNES Final Presentation Days 2013 A Masi, News from ESA-CNES Final Presentation Days 2013 News from ESA-CNES Final Presentation Days 2013.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
ATLAS Radiation Monitor integrating monitor integrating monitor Igor Mandić, Vladimir Cindro, Andrej Gorišek, Gregor Kramberger, Marko Mikuž, Marko Zavrtanik.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, V. Cindro a, I. Dolenc a, A. Gorišek a, G. Kramberger a, M. Mikuž a,b, J. Hartert.
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Y. ThurelCERN / November / xxY. Thurel AB/PO Equipment irradiation test in CNGS Phase 1: [ … : Crash Event ] Phase 2 : [ :
Apr, 2014 TE-EPC-CCE Radiation Tests
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development /
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
Matters arising RADWG - 3 July 2009
DerivFIP – Radiation test
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
CHARM facility update 23/04/2015
CERN/SSC Technology Transfer Day
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
6th WorldFIP Insourcing Meeting
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
Compact readout unit for the EP-RADMON radiation monitoring sensors
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
SPS Beam Position Monitors: Front-End Electronics
Radiation Monitoring in LHC Experiments
Collimator Control (SEUs & R2E Outlook)
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
RADIATION induced failures in LHC 28th June 2011
Forward-bias operation of FZ and MCz silicon detectors made with different geometries in view of their applications as radiation monitoring sensors J.
MICROFIP-Do we need further tests? 28th June 2011
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage reference July TE/EPC EN/STI- TE/EPC PWM EN/STI Profibus module AugustTE/EPC FGC critical components BE/BI: Request to test components for the BPM equipment. Date? TE/EPC: Date for August?

Radiation test CEA – 1 MeV facility  Request of beam time in September for calibration purpose (RADMONs)  No confirmation yet  No further requests from other groups

Radiation test - CNRAD  BPM components  LED warning system  QPS  Ethernet Switches  Cryo power supply  TE/EPC components – later on  New RadMON – not sure yet

RADMON- Operation  Deployment of the new software  New TIMBER configuration  Unexpected rate of reset  Debug on-going

RADMON V6 - Hardware  Prototype tested at PSI  NanoFip  Maxim ADC  New components (current sources, regulators)  Weak points  Temperature sensor  Analog switches

RADMON V6 - Sensors  HEH fluence  Cypress – 90 nm, 8 Mbit  4 chips on board (16 Mbit   1 count  2e5 p/cm 2 )  TID (Si)  Tyndall radfet 100nm  TRAD radfet 1600 nm  Sensor response curve under investigation  1 MeV equivalent neutron fluence  BPW diode  LBDS diode

RADMON V6 – Next steps  HEH fluence  Test Memory 16 Mbit  TID (Si)  Comprehensive analysis in Co60 source  Validation on LHC field  1 MeV equivalent neutron fluence  Test at CEA for BPW and  Prototype  Test at H4IRRAD and/or CNRAD

Back-up

Radiation test- PSI Date Equipment Owner Test groupDUT 1 FebruaryEN/STI PXI power supply 18-19February EN/STI Voltage regulator Cypress Toshiba Diff Amp TE/EPC AC/DC MarchBI BPM electronics MarchEN/STI Analog switches current regulator RadFet April TE/EPCEN/STIMosfet-1 EN/STI RadMon prototype BI Beam Loss Monitor

SEU events in LHC DateTitle LHC point AreaTypeSEU? Beam Dump Equipment 04/05/2012 Cryogenic compressor stop in P8 Point 8US85soft SEETBCFALSECRYO 03/05/2012 RF trip module M2B2, L8B2 Point4UA47soft SEETBCTRUERF 19/04/2012QPS Wfip lostPoint 5DSsoft SEEYESFALSEQPS 16/04/2012Power converter- FGCPoint 7ARCssoft SEETBCTRUEEPC 13/04/2012Power Converter FaultPoint 1RR17hard SEEYESTRUEEPC 10/04/2012QPS-Protection 600 APoint 5UJ56soft SEETBCTRUEQPS 09/04/2012Power Converter FaultPoint 1UJ16hard SEEYESTRUEEPC 04/04/2012 Trip of QPS 4R8 - loss of cryo maintain Point 8LSS-TBCTRUEQPS

SEU events in LHC  QPS: 3 events (ISO150 not counted)  1 Dump (Confirmed)  PC: 3 events with dump  3 Dumps (2 Confirmed)  Cryo: 1 event  No Dump

SEU events in LHC  QPS events in xls file  G:\Projects\R2E\QPS  Which is the updated file?  PC:  Web site Web site  Does Radiation under investigation means TO BE CONFIRMED?  Cryo:  Mail update