RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Slides:



Advertisements
Similar presentations
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
Apr, 2014 TE-EPC-CCE Radiation Tests
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
FCC Special Technologies WP Task 11 Radiation Hardness Assurance TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Radiation Protection computing tools Gérald Dumont HSE/RP.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
H4IRRAD 2012 M. Calviani (EN/STI) for H4IRRAD team.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
R2E Workshop Preparations RadWG Meeting March 25 th.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Monthly mean of stream lines at 200 hPa (upper) and 850 hPa (lower) in January A track of the tropical cyclone formed in January is superimposed.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Matters arising RADWG - 3 July 2009
CHARM facility update 23/04/2015
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
360o Feedback Report Post-Training After-Session Actions
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Collimator Control (SEUs & R2E Outlook)
Math Management Binder ©
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
Projects related to PA 10 Overview
McDonald’s calendar 2007.
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
MICROFIP-Do we need further tests? 28th June 2011
Projects related to PA 10 Overview
McDonald’s calendar 2007.
RADWG Meeting February 2017
Radiation Working Group RADWG
2015 January February March April May June July August September
Presentation transcript:

RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)

AGENDA  Matters arising  Radiation test plan  PSI  CNRAD  H4IRRAD  Equipment in TT83 MWPC  BE-RF equipment in PS

Matters arising-1  LHC restart – 14 March 2012  The shift for the failure analysis will restart  Each group should communicate the failures which are related to radiations  A dedicated mail address will be created  Review of critical projects  Recommended by the R2E reviewers in Nov 2011  External experts and PH-ESE group can be contacted

Matters arising -2  Data base for tracking radiation tolerant components  Strong interest from TE/EPC  Very useful for all the groups that have equipment exposed to radiation  Definition of the specifications to complete  Collaboration with BE/CO for the implementation  NanoFip tested at PSI in December 2011  Test results will be presented by E. Gousiou at the next meeting  Should we proceed with a unique purchase for all the CERN groups?

PSI test plan -1 Date Equipment Owner Test groupDUT 1 FebruaryEN/STI PXI power supply 18-19February EN/STI Voltage regulator Cypress Toshiba Diff Amp TE/EPC AC/DC MarchBI BPM electronics MarchEN/STI Analog switches current regulator RadFet April TE/EPCEN/STIMosfet-1 EN/STI RadMon prototype BI Beam Loss Monitor

PSI test plan -2 Date Equipment Owner Test groupDUT MayTE/EPCEN/STI Mosfet-2 or other, to be defined June-July TE/EPC EN/STI- TE/EPC PWM EN/STI Profibus for LVDT Conditioner AugustTE/EPC FGC critical components October EN/STI LVDT conditioner TE/EPCEN/STIDiode-1 DecemberTE/EPCEN/STI Diode-2 ADC-8bit TBD

PSI test plan -3  Program could be changed if high priorities arise  To be planned in time – 2 months before the slot  Other requests could arrive from TE/EPC for the FGC-Lite project.

CEA – 1 MeV facility  We can reserve beam time  Send requests if interested

Radiation test reports  From the radwg website radwg.web.cern.ch radwg.web.cern.ch  ges/reports/Radiation_report_menu.h tm ges/reports/Radiation_report_menu.h tm  EDMS link  :V0/P:CERN :V0/TAB3Agenda :V0/P:CERN :V0/TAB3Agenda

Course conference workshop  Course radiation effects R. Gaillard on CERN training web site  SEE symposium  April 2012   NSREC  July 2012   RADECS  September 2012 

Back-up