Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.

Slides:



Advertisements
Similar presentations
24. June 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory SPIE Glasgow 2004.
Advertisements

LIGO-G Z Peter Shawhan, for the LIGO Scientific Collaboration GWDAW December 16, 2005 All-Sky Search for Gravitational Wave Bursts in LIGO S4.
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
GWDAW9 – Annecy December 15-18, 2004 A. Di Credico Syracuse University LIGO-G Z 1 Gravitational wave burst vetoes in the LIGO S2 and S3 data analyses.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
GWDAW-8 (December 17-20, 2003, Milwaukee, Wisconsin, USA) Search for burst gravitational waves with TAMA data Masaki Ando Department of Physics, University.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Francesco Fidecaro Advanced Virgo Review, Cascina, November 3, 2008 Virgo brief status report.
Interferometric detector for GW: status and perspectives Giovanni Losurdo INFN Firenze-Urbino
Francesco Fidecaro STAC meeting, Cascina, May 28, 2009 Virgo status report.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Advanced interferometers for astronomical observations Lee Samuel Finn Center for Gravitational Wave Physics, Penn State.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
GRBs & VIRGO C7 run Alessandra Corsi & E. Cuoco, F. Ricci.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
R&D on thermal noise in Europe: the STREGA Project Geppo Cagnoli University of Glasgow AMALDI 6 – Okinawa - Japan June
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
VIRGO LAPP – Annecy NIKHEF – Amsterdam INFN – Firenze-Urbino INFN – Frascati IPN – Lyon INFN – Napoli OCA – Nice LAL – Orsay ESPCI – Paris INFN – Perugia.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Igor Yakushin, December 2004, GWDAW-9 LIGO-G Z Status of the untriggered burst search in S3 LIGO data Igor Yakushin (LIGO Livingston Observatory)
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Data Analysis report November, 2009 Gianluca M Guidi
Present Status of the Virgo Experiment
(Some) noise hunting issues at Virgo
Virgo Status Detector Status Computing Data Analysis status and Plans
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Brennan Hughey for the LSC May 12th, 2008
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
GEO – VIRGO joint noise hunting project
Virgo Update – LSC meeting
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
Presentation transcript:

Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis Workshop Potsdam, December 18 th 2006

GWDAW 11 December 18 th, 2006 – Gabriele Vajente2 Virgo collaboration New groups joined the collaboration ESPCI Paris LAPP LAL Orsay LMA Lyon OCA INFN Perugia INFN Firenze INFN Napoli INFN Pisa INFN Roma 1 NIKHEF INFN Roma 2

GWDAW 11 December 18 th, 2006 – Gabriele Vajente3 Restart after shutdown Last winter shutdown for hardware upgrades Injection bench replacement to run with higher input power (10 W enter the ITF) Power Recycling mirror replacement with new monolithic mirror, higher reflectivity (95 %) PR mirror mechanical transfer function OLD NEW

GWDAW 11 December 18 th, 2006 – Gabriele Vajente4 Thermal issues Higher power produces thermal effects Lock acquisition long (~20 min) Thermal transient is a critical period Wait for 10 min after reaching dark fringe condition Needed a reduction of input power to 5.5 W (entering the ITF) Need for a thermal compensation system, work starting BS Pick-off power Lower sideband Higher sideband

GWDAW 11 December 18 th, 2006 – Gabriele Vajente5 WSR3 and WSR4 were canceled for bad conditions Week-end Science Run Periodic short data taking started in September 2006 start moving towards a science run operation take snapshots of the commissioning progress take clean data in controlled conditions light organization priority always on commissioning WSR1 September 08 th - 11 th WSR2 September 22 th - 25 th WSR3 October 06 th - 09 th WSR4 October 13 th - 16 th WSR5 November 10 th - 13 th WSR6 December 01 th - 04 th WSR7 January 12 th - 15 th

GWDAW 11 December 18 th, 2006 – Gabriele Vajente6 Sensitivity in WSRs

GWDAW 11 December 18 th, 2006 – Gabriele Vajente7 Comparison of sensitivity

GWDAW 11 December 18 th, 2006 – Gabriele Vajente8 Duty cycle and horizon in WSRs Horizon for NS NS (averaged) [MPc] WSR1 Duty cycle 87.7% Longest lock 15 h WSR2 Duty cycle 68.7% Longest lock 27 h WSR5 Duty cycle 64.2% Longest lock 10 h WSR6 Duty cycle 80.5% Longest lock 18 h

GWDAW 11 December 18 th, 2006 – Gabriele Vajente9 Dependence on weather conditions The horizon is affected by microseismic conditions Sea activity Wind Suspension control improvements on-going Horizon NS-NS optimal [MPc] Seismic activity [a.u.] RMS 220 mHz – 1 Hz RMS 30 mHz – 100 mHz

GWDAW 11 December 18 th, 2006 – Gabriele Vajente10 Noise budget Below 50 Hz control noise (longitudinal and angular) Above 1kHz frequency noise and shot noise Intermediate region WSR5

GWDAW 11 December 18 th, 2006 – Gabriele Vajente11 Acoustic noise / diffused light The main suspect is acoustic and seismic noise from benches in air Through diffused and scattered light effects Investigations on-going Projection of acoustic noise introduced by the detection bench, measured with acoustic noise injections

GWDAW 11 December 18 th, 2006 – Gabriele Vajente12 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration

GWDAW 11 December 18 th, 2006 – Gabriele Vajente13 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Analysis of data quality (talk by E.Cuoco) Studies on veto procedures and efficiency (poster by M. Del Prete) Search fro bursts from GRB a (poster by A. Corsi)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente14 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration On-line analysis perfomed using Merlino and MBTA algorithms (talk by L. B. Bosi) Study on coherent analysis with a network of ITF (poster by S. Birindelli) Improvements in the timing accuracy (poster by D. Grosjean)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente15 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Coincidence analysis between C6 and C7 run (talk by C.Palomba)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente16 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Analysis of prospect of detection in a network search Virgo/LSC (talk by G.Cella)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente17 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Search and removal of lines (poster by I. Fiori et al.)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente18 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Analyzed 24 hours of data in coincidence during Virgo C7 run ILIAS-WG2 methodological paper under preparation (Talk by L. Baggio)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente19 Brief overview of Data Analysis at Virgo Virgo search groups Bursts Binary inspirals Periodic signals Stochastic background Noise studies Virgo-Bars network Virgo-LIGO collaboration Comparison of calibration and pipelines Methodological work on simulated data Exchanges of short data segments for developing and testing network analysis methods.

GWDAW 11 December 18 th, 2006 – Gabriele Vajente20 Prospects for the future Virgo WSRs Virgo commissioning Virgo+ upgrade Virgo+ commissioning Virgo+ Scientific Run Virgo commissioning TIME Virgo Scientific Run (in coincidence with S5)

GWDAW 11 December 18 th, 2006 – Gabriele Vajente21 Virgo+ 50 W laser, F=150 cavities Low loss suprasil end mirrors Monolitic suspensions Shot noise decreased Thermal noise decreased

GWDAW 11 December 18 th, 2006 – Gabriele Vajente22 Summary WSR program started and continuing with good duty cycle improving sensitivity (high frequency almost at measured shot noise, comparable with LIGO) Commissioning continues big efforts in the Hz region Goal to have a Science Run in coincidence with LSC S5 Plans for Virgo+ upgrade