Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
GEO600 Harald Lück Ruthe, Worldwide Interferometer Network.
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
Variable reflectivity signal-recycling mirror and control Stefan Goßler for the experimental team of The ANU Centre of Gravitational Physics.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
GEO600 Status Update Harald Lück Hannover, April 2005.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Perugia, Italy Reducing the Noise in GEO600 Joshua Smith for the GEO 600 team.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
Laser Frequency Stabilization – 2004, May 04 1 Laser Frequency Stabilization François BONDU CNRS – ARTEMIS, Nice VIRGO How it works (Design) Make it work.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
The VIRGO detection system
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
GEO600 – The output mode cleaner Mirko Prijatelj for the GEO600-Team Institute for Gravitational Physics Albert-Einstein-Institute Hannover / Germany.
The Proposed Holographic Noise Experiment
GEO600 Control aspects where do the error signal come from?
Nergis Mavalvala Aspen January 2005
Homodyne readout of an interferometer with Signal Recycling
GEO – VIRGO joint noise hunting project
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
40m Laboratory Upgrade Progress Report
GEO HF Limits/Goals/Options…
Advanced LIGO optical configuration investigated in 40meter prototype
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team

Joshua Smith December 2003 Optical layout Michelson Interferometer with Dual Recycling Folded arms with optical path length of 2400 m Mode Cleaners 2 triangular ring cavities (8 m optical path length each) Laser

Joshua Smith December 2003 Dual Recycling PR enhances carrier SR enhances signal MSR MPR Signal sidebands carrier

Joshua Smith December 2003 Summer setbacks Local control flag broken off open tanks & rebond Broken fused silica fiber open tanks & replace Turbo pump failures Some air leaked into tanks and tubes as a result Air Conditioning Failures HOT electronics don’t work! Signal Recycling locks rare

Joshua Smith December 2003 Excess mirror tilt Mirror tilt of ~1  pendulum resonances makes signal recycling lock acquisition very difficult Cause: Long to tilt coupling in monolithic suspensions Measured coherence: mirror tilt with ground motion along beam axis Understood, oversight in assembly

Joshua Smith December 2003 Reducing mirror tilt (I) Digital feedforward of ground motion to suspension point

Joshua Smith December 2003 Reducing mirror tilt (II) Applied digital FF correction for the tilt introduced by longitudinal feedback to intermediate mass

Joshua Smith December 2003 Locking dual-recycled GEO600 Problems with locking on SR error signal narrow catching range SR mirror motion too large Invented new acquisition scheme Pre-lock on “2f” error signal Signal 2xMI mod freq, dominates light on output PD 2f represents optical gain of MI allows much more frequent lock acquisition time (~ 1 min compared to ~ 1 day on SR signal) Pre-lock reduces SR mirror motion Switch to Proper SR error signal on zero crossing

Joshua Smith December 2003 Tuning dual-recycled GEO600 Initial SR detuning of ~5 kHz Easier lock acquisition Downtune to operating point Automatic detuning to 1.3 kHz in ~ 30 s (Data not valid during the downtuning) Relavant gains, phases automatically adjusted by Labview system Have tuned as low as 700 Hz

Joshua Smith December 2003 Tunable optical gain

Joshua Smith December 2003 S3 1-week duty cycle locked h unlocked 8.2 h longest lock 27.1 h Duty Cycle: % Day Duty Cycle [%]

Joshua Smith December 2003 Lock losses (1 week) 16Total 3Not identified 8 North building temperature 1Modecleaner alignement jumps 1SR feedback saturation 2Seismic event 1Alignment feedback end of range NoCause of loss of lock Longitudinal Drift control for MSR added Faulty contact found in MC electronics Heater with thermostat placed near to tank Investigations into causes of lock losses give:

Joshua Smith December 2003 Sensitivity

Joshua Smith December 2003 Lines in S3 h(t)

Joshua Smith December 2003 Calibration Line Amplitude Noise (I) Noise at IFO output >> than input fluctuations likely dominated by optical gain fluctuations Calibration line amplitude timeseries dominated by common low frequency noise!

Joshua Smith December 2003 Calibration Line Amplitude Noise (II) Calibration line amplitude coherence with seismic and alignment double-freq microseism freq’s Discovered in parallel by Bala, GEO++ mons Likely optical gain fluctuations due to misalignment

Joshua Smith December 2003 The Way Forward Sensitivity improvement given highest priority Removing lines Pulsar hardware signal injections Rejoin S3