Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.

Slides:



Advertisements
Similar presentations
Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Advertisements

Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Chapter 3 Managing the Information Systems Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
What is a project? Project Management Institute definition
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Engineering Design Development. Turner College and Career High School.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Gantt Chart Engineering Design Development. Turner College and Career High School.
Project Management and Scheduling
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Chapter 6 Introduction to Microsoft Project
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Computer System Analysis
Chapter 3 : Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
A description of how to construct a Work Breakdown Structure (WBS) with past historical data on a project that is in-flighted to U PlanIT. Next © 2009.
 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
The Project Plan IT Project Management COSC
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
Project UF Practical management of projects Randy Graff, PhD.
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Progress Reports. Schedule m m.
Statement of the Work SOW By: Wilmer Arellano FIU Summer 2007 (Updated)
By Wilmer Arellano Fall 2009
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Statement of the Work SOW
Microsoft Project Tutorial Jesal Bhuta
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 3 Managing the Information Systems Project
Using Project Portfolio Tool ‘PMFolio’ by AlNik Solutions, LLC Copyright 2011 ©
Project Time Management
1 Copyright © 2015 Pearson Education, Inc. Module 1 Workshop 2 Creating a Detailed Project Plan Series Editor Amy Kinser by Kristyn Jacobson.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
SOW / Open Workbench By Wilmer Arellano Fall 2010 Wilmer Arellano © 2010.
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
Open Workbench By Wilmer Arellano Spring This is just an example, you can customize as you like.
By Wilmer Arellano Spring 2010
Software project mgt. session # 3– lab manual.
Software project mgt. session # 3– lab manual.
Information System Analysis
Microsoft Project 2007 Demo Part 2
By Wilmer Arellano Fall 2010
Progress Reports.
By Wilmer Arellano Summer 2013
Presentation transcript:

Open Workbench By Wilmer Arellano Spring 2008

Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle. Certain areas that need to be addressed are as follows: –Scope of Work, Describes the work to be done in detail and specifies the hardware and software involved and the exact nature of the work to be done. –Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work. –Period of Performance, This specifies the allowable time for projects, such as start and finish times. –Deliverables Schedule, This part list the specific deliverables, describing what and when it is due. –Who is responsible for what.

Work Breakdown Structure (WBS) The WBS is the hierarchical list of the project's phases, tasks and milestones –Phase: A group of related tasks that completes a major step in a project. –Task: An activity that has a beginning and an end. Project plans are made up of tasks. –Milestone: A reference point marking a major event in a project and used to monitor the project's progress. Scope: The combination of all project goals and tasks, and the work required to accomplish them. –The scope translates into the timeline and budget. Budget: The estimated cost of a project. us/assistance/HA aspx#Step%201

Work Breakdown Structure (WBS) This is what we want Deliverables based WBS own_structure

Example

This is just an example, you can customize as you like.

In Favorites Gantt Charts, double-click the little square and enter: A new Phases with: Name Category And ID Make sure to select phase

The first phase has been created

In Favorites Gantt Charts, double-click the little square and enter: The Tasks with: Names Category And ID Duration Make sure to select task

The first task has been entered

This is how it would look after all tasks for the first phase have been entered

To indicate task’s dependencies drag from the end of one task to the beginning of the next one

Click here to auto- schedule

This is how it would look like Red Color indicates the Critical Path

Project with two phases included It is a coincidence that the two phases have same duration

Click to see the PERT The zoom commands were used to fit the chart in the window

On planning, Resource assignment, double click the little square to enter the resources and their costs

Do the same for non labor resources Use Equipment for Space

You can add the cost of components as “material”

Right click on the tasks and select assignment to assign resources to the tasks

Right click on the tasks and select assignment to assign resources to the tasks. Enter estimated hours in Estimate

As components were entered with a rate of $100, 1.5 will represent $150

The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed If you need to add a new task or phase in between tasks or phases, right click the square and select insert task

There will be a problem if you click schedule again

As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential. You would need to add more resources to keep the tasks in parallel The zoom commands were used to fit the chart in the window

Another Low Frequency Engineer was included Two more Lab Spaces were included It was not necessary increase the project duration

Click on controlling and then Revise Schedule to see the budget

Set The base Line Updating The Project Status

The task bar changes color to reflect status (Red / Blue – Not Started) (Purple – Started) (Grey – Progress completed) The task name changes color to reflect status (Red – Not Started) (Purple – Started) (Green – Completed)

Updating The Project Status If the task is completed enter 0 in Estimate

Updating The Project Status We reduced 20 hours but because of the weekend it appears to be a longer time

Milestones

Drag the milestone to the desired location

Milestones

Copy and Paste Table cells can be copied and pasted into excel By the way, this is a representation of the WBS

The Budget Even the Components are included here

& & Q uestions A nswers