1 Title of the Topic, for example: Project Planning. Project Scope. Work Breakdown Structure. By __ (your ClassID)

Slides:



Advertisements
Similar presentations
Chpter#5 -part#1 Project Scope and Human Resource Planning
Advertisements

Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
1 The Database Application Development Process The Database Application Development Process.
Project Scope Management
Chapter 5: Project Scope Management
Fundamentals of Information Systems, Second Edition
Iterative development and The Unified process
إدارة المشروعات Projects Management
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Objectives Explain the purpose and various phases of the traditional systems development life cycle (SDLC) Explain when to use an adaptive approach to.
Engineering Design Development. Turner College and Career High School.
1 Case Study: Starting the Student Registration System Chapter 3.
Introduction to Systems Analysis and Design
Gantt Chart Engineering Design Development. Turner College and Career High School.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
TIBCO Designer TIBCO BusinessWorks is a scalable, extensible, and easy to use integration platform that allows you to develop, deploy, and run integration.
Advanced Project Management Project Plan Templates
Usage of Agile in Different Technologies
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Section 02Systems Documentation1 02 Systems Documentation And Franchise Colleges By MANSHA NAWAZ.
INFO415 An overview of systems development
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Current Trends in Systems Develpment
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Project Management Process Groups
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Software Project Planning.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
IT Requirements Management Balancing Needs and Expectations.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Software Engineering Spring (C) Vasudeva VarmaClass of 32 CS3600: Software Engineering: Process and Product* *Most of the Content drawn.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
Systems Analysis and Design in a Changing World, Fourth Edition
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 10 Slide 1 Chapter 13 Finalizing Design Specifications.
Develop Project Charter
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Computing and SE II Chapter 15: Software Process Management Er-Yu Ding Software Institute, NJU.
د. باسم ممدوح الحلوانى Lecture 3 Scope Management.
MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
The Project Management Process Groups
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Information Technology Project Management, Seventh Edition.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
PERTEMUAN-2 Chapter 2. Project Selection and Management
Chapter 3: The Project Management Process Groups: A Case Study
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Chapter 3: The Project Management Process Groups: A Case Study
Chpter#5 -part#1 Project Scope and Human Resource Planning
Tools of Software Development
Project Management Process Groups
Presentation transcript:

1 Title of the Topic, for example: Project Planning. Project Scope. Work Breakdown Structure. By __ (your ClassID)

2 Tables of Contents 1.History of Agile Methodology (AM) 2.Main agile methods 3.Agile methods and software development life cycle - SDLC 4.AM fundamentals (what is AM about? How it works?) 5.AM main characteristics 6.AM versus traditional SE methodology: a detailed comparison 7.Real-world examples of AM applications in software development (SD) and information technology industry 8.Agile methods: lists of obtained tangible (with dollar amount) and intangible (with no dollar amount) benefits that were obtained by SD companies because of AM applications 9.List of References Used and Useful Web-Based Resources

3 1. History of Agile Methodology Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

4 Well-balanced slide (50% text + 50% graphics) with Web link at the bottom Scope statements may take many forms depending on the type of project being implemented and the nature of the organization. However, a baseline scope statement should contain:project  The project name  The problem statementproblem statement  The project goals and objectivesobjectives  The project requirements  The project deliverablesdeliverables  The project non-goals (what is out of scope)  Milestones (timetable, schedule) Milestones  Cost estimates Cost estimates Source:

5 Well-balanced slide with highlighting of a specific topic by arrow and oval in red color Project Planning starts with the Project Plan Development process, which is a part of the Integration Management knowledge area. The single deliverable from this process is the Project Management Plan – a consistent coherent document; it consists of deliverables for each of the other 9 Knowledge Areas (KAs). Project Plan = telling the team “WHAT TO DO” Source:

6 2. Main Agile Methods Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

7 Why to Create Project Plan?  The Cost of Software Change Law is a very well- known law (see on the right).  Errors found “upstream” during the planning phase cost on the order of times less to fix than errors found “downstream” during the building of the product.  Planning “forecasting” = “seeing into the future” is not an easy task  T. Caspers Jones (1998) summed it up this way: “The seeds of major software disasters are usually shown in the first three months of commencing the software project. Hasty scheduling, irrational commitments, unprofessional estimating techniques, carelessness of the project management function are the factors that tend to introduce terminal problems.” The Cost of SW Change

8 3. Agile Methods and Software Development Life Cycle Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

9 Well-balanced slide with hyperlinked computer screen snapshot (on the right) E-commerce servers – already reported about millions of dollars total loss because of a virus in and/or hacker’s attack on in e-commerce servers !

10 Well-balanced slide with a chart and short explanations on the right System Level (Webster System) Level of Subsystems (Domains) (Databases, GUI, Security, HELP, etc.) Level of Elements or Components (tables, forms, queries, reports, macros and modules, …) Level of Sub-elements, Details (for ex., attributes) (ID, First Name, Last Name, DOB, YOA, status, …) System Databases Security A subsystem A component A detail (attribute) Tables (DOs) Functions Forms Queries GUI …... Macros ID FN LN DOB YOA Status …

11 8. Agile Tools Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

12 Well-balanced slide with a table and text  WBS element may be a productproduct, datadata, a component, a service, orservice any combination.  100% rule: The WBS represents 100 percent of the work required to produce the final products, and, therefore, all tasks must add up to 100% of the total scope and should not go over 100%. Source:

13 9. History of Agile Methodology: References Used and Useful Web resources Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

14 List of References Used and Useful Web-Based Resources 1.Highsmith, J.A Agile Software Development Ecosystems. Boston, MA: Addison Wesley. 2.Rico, D., Sayani, H., “Use of Agile Methods in Software Engineering Education”, Proceedings of the Agile 2009 Conference, August 24-28, 2009, Chicago, Illinois, U.S.A., pp IBM Agile Development, Accessed April 2, 2014http://www-01.ibm.com 4.The 7th Annual State of Agile Development Survey, at State-of-Agile-Development-Survey.pdf. Accessed April 3, 2014http:// State-of-Agile-Development-Survey.pdf. 5.West, D. “Water-Scrum-Fall Is The Reality Of Agile For Most Organizations”, Accessed April 3, A. Begel, N. Nagappan, “Usage and Perceptions of Agile Software Development in an Industrial Context: An Exploratory Study”, Accessed April 4, 2014http://research.microsoft.com/pubs/56015/agiledevatms-esem07.pdf 7.Murphy, B., Bird, C., Zimmermann, T., Williams, L., Nagappan, N., Begel, A. “Have Agile Techniques Been the Silver Bullet for Software Development at Microsoft?”, Proceedings of the Seventh International Symposium on Empirical Software Engineering and Measurement (ESEM 2013), Baltimore, Maryland, USA, October The State of Scrum: Benchmarks and Guidelines, ScrumAlliance, June 2013, Accessed April 7, VersionOne (for agile project management), tools/. Accessed April 7, 2014http:// tools/ 10.VersionOne (for agile software development), Accessed April 7, 2014http://

15 Project Planning. Project Scope. Additional (optional) information. Attention: This is the example of slide-separator between various parts of your presentation. It should be EXCLUDED from total number of slides.

16 Attributes of Good Project Plans  Plans should be flexible and dynamic (be able to accommodate changes) Things always happen during the project to change each of these four constraints so plans should be built to accommodate room for issues/problems/delays.  Plans should be updated as changes occur (Integrated Change Control)  Plans should first and foremost guide project execution  Plans should never assume the team will work overtime, at least not at the start *)