IMPLEMENTATION OF THE BWP & PERFORMANCE MONITORING AND ASSESSMENT.

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

Results Based Monitoring (RBM)
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
Lesson 2: Project: Evaluation, Monitoring, Auditing Macerata, 22 nd October Alessandro Valenza, Director, t33 srl.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
RBM in the context of Operations and Programme and Project Management Material of the Technical Assistance Unit (TAU)
HOW TO WRITE A GOOD TERMS OF REFERENCE FOR FOR EVALUATION Programme Management Interest Group 19 October 2010 Pinky Mashigo.
EVALUATION IN THE GEF Juha Uitto Director
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal Marko Prijatelj Directorate General for Regional.
PMP® Exam Preparation Course
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Development and Implementation of a National Multisectoral Output Monitoring System (SHAPMoS) for HIV Responses in Swaziland:  Challenges and lessons learned.
1 Framework Programme 7 Guide for Applicants
Improving Results Reporting Operations Managers Workshop Kiev, October 2008 Bratislava Regional Center Management Practice.
IPC Global Strategic Programme ( ) IPC Global Partners: IPC REGIONAL Strategic Programme IPC Regional Steering Committee Meeting – March.
Project “Ex-ante evaluation of programming documents and strengthening evaluation capacity for EU funds post-accession” (EUROPAID/130401/D/SER/HR) Project.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
WHO–ITU National eHealth Strategy Toolkit An effective approach to national Strategy Development and Implementation Clayton Hamilton WHO Regional Office.
Information for New Members of Crown Entity Boards Crown copyright: State Services Commission, February
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
A member of CGIAR consortium East and Central Africa Flagship Overview of DevResult Chris Okafor, Flagship Manager Rachel Zozo, M&E Officer.
UNFPA-UNICEF Joint Programme on Female Genital Mutilation/Cutting: Accelerating Change Management Response and Key Actions.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points Western and Central Africa Dakar, May 2007.
LOGICAL FRAMEWORK STRENGTHENING INTEGRITY and ACCOUNTABILITY PROGRAM 2 Ext. Implementor : SEKNAS FITRA Improved civil society involvement in controlling.
Omid Parhizkar, PhD Interim Results Management Coordinator Results Based Management at the GEF.
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
4/5 June 2009Challenges of the CMEF & Ongoing Evaluation 1 Common monitoring and evaluation framework Jela Tvrdonova, 2010.
1 Preparation of Six-Year ED Sector Programme Cycle and its 1st biennium Advantages -Real alignment of biennial C/5 (within 6-year ED Programme Cycle)
Regional Policy Result Orientation of future ETC Programes Veronica Gaffey Head of Evaluation & European Semester 23 April 2013.
County Office of Education LCAP Update Peter Birdsall – CISI W ORKSHOP S ACRAMENTO C OUNTY O FFICE OF E DUCATION.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
Application of Human Rights Principles in Results Based Management Muhammad Usman Akram, Evaluation Advisor Adapted from RBM training held for UNDP BRC.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
State of Georgia Release Management Training
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
1 RBM Workplanning and Budgeting-FAO Managing for results in FAO Module II. Operational Planning ‘Workplanning’
Roadmap & Actions Expert Consultation Health in All Policies.
Practical Experiences - Evaluation of Program 1 Geneva January 29, 2016.
Results Oriented Monitoring & Evaluation Model (ROMEM) Presented by Shawn Grey Ministry of Transport and Works Jamaica. Model developed by MTW and DPMI.
Steps in development of action plans ITC-ILO/ACTRAV Course A3 – Trade Union Training on Information Management for Trade Union Organization, Research.
Working with Logic Models
Building an ENI CBC project
Reporting, Monitoring and Evaluation
Guyana Country Cooperation Strategy and
Country Level Programs
Template Contents of the Low Carbon Development Strategy (LCDS)
SCOA for Municipalities:
System Office Performance Management
GEF Familiarization Seminar
Translating ideas into proposals for action programmes
PAHO’s Strategic Framework
Evaluation : goals and principles
SCOA for Municipalities:
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
Helene Skikos DG Education and Culture
WHAT is evaluation and WHY is it important?
Good practice in preparing an application
United Nations Voluntary Fund on Disability (UNVFD)
The Estonian experience with ex-ante evaluation – set-up and progress
Translating ideas into proposals for action programmes
Translating ideas into proposals for action programmes
Presentation transcript:

IMPLEMENTATION OF THE BWP & PERFORMANCE MONITORING AND ASSESSMENT

08-09 Performance Monitoring and Assessment Timeline July 08 December 09 PMA by EXM 1 st Week Dec PMA by EXM July 2009 PMA by EXM 1 st Week Dec PMA by EXM August 7, 2008 SPR/SWP July 2008 SPR/SWP Annual Report Last week Nov SPR/SWP Biennial/Final Report Last week Nov SPR/SWP July 2009 SPR (IPS) Semestral Progress Report SWP (PTS) Semestral Workplan PMAPerformance Monitoring and Assessment EXM Executive Management

PAHO’s Planning Framework Results Chain and Indicators Areas of Action Strategic Objectives OWERs RERs OSERs P & S Tasks Planning Instrument SO indicators RER indicators OSER indicators Means of Measurement contribute aggregate or contribute aggregate or contribute GPW (GHA) & HAA WHO MTSP PAHO SP & PB Biennial Workplans AMPESAMPES OWER indicators

Organization-wide Expected Result (OWER) Country-level or Office- Specific Expected Result Product/ Service Product/ Service Tasks Product/ Service Tasks Regional or HQ Expected Result Country-level or Office- Specific Expected Result Office-specific Expected Result (OSER) Region-wide Expected Result (RER) Biennial Workplan Contents and logical structure of a Biennial Workplan (BWP) in the Chain of Results

RERs (Region-wide Expected Results) All Results Aggregate to RERs RERs represent the PASB’s collective corporate efforts OSERs = Office-Specific Expected Results, contained in Biennial Workplans PAHO/WHO Country Office OSERs Subregional OSERs Executive Management OSERs Regional HQs Technical & Administrative Area OSERs Technical Center OSERs

If the ……... are produced The Organization will achieve the.... Organization-wide Expected Result Region-wide Expected Results Office- Specific Expected Results Office- Specific Expected Results Products/ Services In order to achieve the …..., the Organization will have to produce..... Chain of results and planning logic

Traditional RBM Results Chain Impact Impacts refer to the longer-term effects produced, directly or indirectly, by a development intervention. Typically is analized through independent evaluation Outcomes Outcomes refer to the likely or achieved short-term and/or medium-term effect of an intervention’s products and services. Outputs Outputs refer to the immediate results that are observable after the completion of activities and are the type of results over which managers have a high degree of influence. Activities Activities refer to actions taken or work performed through which inputs, such as funds, technical assistance and other types of resources are utilized to produce specific products and services (an output) Inputs Inputs refer to the financial, human, and material resources needed for the development intervention.

Traditional & PAHO RBM Results Chain InputsActivitiesOutputsOutcomesImpact InputsTasksProducts &Service OSER/RER /OWERs Strategic Objectvs Manageable Interest Managerial & Organizational Accountability

Office-specific expected result will be achieved Risks do not occur Risks do not occur IF Assumptions hold Assumptions hold then Product/ service produced and if Assumptions and Risk Logic

PRODUCTS AND SERVICES Product is the final output of a task or combination of tasks. Product is a tangible and observable result to which expected quality and quantity performance criteria, can be attached. Service is on-going and identifiable output of a task or combination of tasks. A service, typically, includes such things as capacity building, advocacy, and support for the development of policies, norms and guidelines The term service has been introduced to reflect the intangible nature of many of the outputs of PAHO/WHO and to enable these to be captured in biennial workplans.

AMPES ENTITY Situation Analysis Problems and Interventions Implementation Strategy Project OSER Link to RER indicator OSER indicator OSER indicator milestones Semester 1 Semester 2 Semester 3 Semester 4 Product / Service Task (PTS) cost $$ Link to: Core/Enabling Function Mainstreaming issues Planned Amount PAHO’s Planning Framework AMPES Biennial Workplan Structure

Semestral Workplan & Progress Report

Pan American Health Organization Report Date _________ Semestral Workplan Entity___________________ Project ___________________ Semester 1:  2:  3:  4:  OSER 1: (TEXTO) Product or Service (TEXT)DateLocation [1] [1] Initial Programmed Cost Responsible Officer Assessment at the end of the Semester StartEnd If the task was to be completed during the semester, check corresponding box if completed Implementation Rate by task [2] [2] Task 1 (TEXT)  Task 2 (TEXT)  Task 3 (TEXT)  Task n (TEXT)  [1] [1] Place or places where the task will be implemented. [2] [2] The system will provide the implementation rate [(expenditure/initial programmed cost) (100)] per task, product/service, OSER, AMPES Project, and Biennial Workplan.

[1] [1] The semestral assessment is cumulative. That is to say, the 2 nd Semester is the mid-term assessment and the 4 th Semester is the end of biennium assessment. [2] [2] Semestral monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on the level of achievement of the milestones during the semester; the system will automatically generate this information. [3] [3] Cumulative monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on cumulative level of achievement of the milestones; the system will automatically generate the report. [4] [4] If a milestone or milestones from previous semesters were not achieved in an earlier review, but were achieved subsequently, please check the appropriate boxes. If they remain unchecked, it is understood that they were not achieved; therefore a justification must be provided. [1] [1] The semestral assessment is cumulative. That is to say, the 2 nd Semester is the mid-term assessment and the 4 th Semester is the end of biennium assessment. [2] [2] Semestral monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on the level of achievement of the milestones during the semester; the system will automatically generate this information. [3] [3] Cumulative monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on cumulative level of achievement of the milestones; the system will automatically generate the report. [4] [4] If a milestone or milestones from previous semesters were not achieved in an earlier review, but were achieved subsequently, please check the appropriate boxes. If they remain unchecked, it is understood that they were not achieved; therefore a justification must be provided. [1] [1] The semestral assessment is cumulative. That is to say, the 2 nd Semester is the mid-term assessment and the 4 th Semester is the end of biennium assessment. [2] [2] Semestral monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on the level of achievement of the milestones during the semester; the system will automatically generate this information. [3] [3] Cumulative monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on cumulative level of achievement of the milestones; the system will automatically generate the report. [4] [4] If a milestone or milestones from previous semesters were not achieved in an earlier review, but were achieved subsequently, please check the appropriate boxes. If they remain unchecked, it is understood that they were not achieved; therefore a justification must be provided. [1] [1] The semestral assessment is cumulative. That is to say, the 2 nd Semester is the mid-term assessment and the 4 th Semester is the end of biennium assessment. [2] [2] Semestral monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on the level of achievement of the milestones during the semester; the system will automatically generate this information. [3] [3] Cumulative monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on cumulative level of achievement of the milestones; the system will automatically generate the report. [4] [4] If a milestone or milestones from previous semesters were not achieved in an earlier review, but were achieved subsequently, please check the appropriate boxes. If they remain unchecked, it is understood that they were not achieved; therefore a justification must be provided. Pan American Health Organization Date ____________ Progress Report [1] [1] Entity ________________ Project _______________ Semester 1:  2:  3:  4:  Mid-term End of biennium Assessment Assessment OSER No. 1: (TEXT) COLOR [2] [2] (OSER Semestral Monitoring as per milestones achieved) COLOR [3] [3] (OSER Cumulative monitoring as per milestones achieved) Risk and Assumptions (between products/services and OSER): n… 1.OSER indicator: (TEXT) Milestones [4] [4] Semester: 1 Semester: 2 Semester: 3 Semester: 4 MILESTONE TEXT or N/A  OSER indicator progress is measured based on milestone achievement (check the corresponding box) In the event that the milestone was not achieved, please explain: [1] [1] The semestral assessment is cumulative. That is to say, the 2 nd Semester is the mid-term assessment and the 4 th Semester is the end of biennium assessment. [2] [2] Semestral monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on the level of achievement of the milestones during the semester; the system will automatically generate this information. [3] [3] Cumulative monitoring: Green (90-100%) - Yellow (75-89%) - Red (< 74%) The color of the OSER depends on cumulative level of achievement of the milestones; the system will automatically generate the report. [4] [4] If a milestone or milestones from previous semesters were not achieved in an earlier review, but were achieved subsequently, please check the appropriate boxes. If they remain unchecked, it is understood that they were not achieved; therefore a justification must be provided.

Cont… Progress Report Products and Services [1] [1] Progress status based on the accomplishment of tasks [2] [2] Implementation Rate Proposed date of delivery for Product/ Service [3] [3] Has the product/service been delivered? (mark the box) [4] [4] 1. TEXT Product/ ServiceColor  2. TEXT Product/ ServiceColor  n. TEXT Product/ ServiceColor  If a product or service was not delivered, or was not delivered on time, please explain: [1] [1] A product is the final output of a task or combination of tasks. It is a tangible and observable result to which expected quality and quantity performance criteria can be associated. A service is an on-going and identifiable output of a task or combination of tasks. A service, typically, includes such things as capacity building, advocacy, and support for the development of policies, norms and guidelines. This term has been introduced to reflect the intangible nature of many of the outputs of PAHO/WHO and to enable these to be captured in the biennial workplans. [2] [2] The level of progress is automatically provided by the system on the basis of the information included in the Semestral Workplan in relation to the accomplishment of tasks: [(Green (90-100%) - Yellow (75-89%) - Red (< 74%)] [3] [3] The date is automatically provided by the system. It refers to the information that is entered when a product/service is created. A completion date is required for each product/service. The system transfers this information to this section in the form. [4] [4] When a product/service has been delivered, the Project Coordinator must check the corresponding box.

Pan American Health Organization AMPES Project Progress Analysis Project Coordinator Name: ______________________________________ Project: __________________ Entity: _________ Report Date:__________ Semester: 1:  2:  3:  4:  Based on the analysis of the OSERs under your project, please comment (where appropriate, and if needed) on: Progress status of the OSERs. ¿Are there any OSERs at risk of achievement? Lessons learnt: Comment if the technical and implementation progress and the assigned resources are appropriate: Unexpected OSERs effects or results - positive or negative- if any: Recommendations on any adjustments to ensure the achievement of the OSERs (example: adjustments in human and financial resources among projects): Recommendations, including adjustments in programming when needed:

Pan American Health Organization Biennial Workplan (BWP) Progress Analysis Name of the Entity Manager: ________________________ Entity: _______________ Date of Report:__________ Semester: 1:  2:  3:  4:  Based on the analysis of the AMPES projects, please comment (where appropriate, and if needed) on: Entity lessons learnt: Proposed managerial adjustments to improve/ensure the achievement of the AMPES projects (i.e. adjustments in human or financial resources among projects): Other issues (such as resources mobilization needs or efforts): Recommendations, including program adjustments when needed:

Schedule of Changes PTS and IPS to be tested by 4th semester assessment Incorporation of Products and Services in BWP Project Management tools: 2010

Q &A Comments