Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Photoproduction and Decays of Pseudoscalar Mesons in CLAS
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
CEBAF The Continuous Electron Beam Accelerating Facility (CEBAF) at JLab in Newport News, Virginia, is used to study the properties of quark matter. CEBAF.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Fiducial Cuts for the CLAS E5 Data Set K. Greenholt (G.P. Gilfoyle) Department of Physics University of Richmond, Virginia Goal: To generate electron fiducial.
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
CLAS12 – CND PARAMETERDESIGN VALUE Detector typeBarrel of scintillators Angular coverage40 o to 120 o Number of radial layers3 Number of azimuthal segments48.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
The eRHIC Interaction Region. Your Guide: B. Parker, BNL-SMD Time Tunnel The eRHIC Interaction Region Try to Envision a Viable Future Layout Give Overview.
Thomas Jefferson National Accelerator Facility Pg. 1 Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal Cesar Luongo Latifa Elouadrhiri Jefferson.
Fiducial Cuts for the CLAS E5 Data Set K. Greenholt (G.P. Gilfoyle) Department of Physics University of Richmond, Virginia INTRODUCTION The purpose of.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Hall B and GEANT4 Mark Ito Jefferson Lab GEANT4 Tutorial May 22, 2006.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Update on PANDA solenoid design
CBM magnet overview of the BINP work
Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal
Hall C Readiness Review – Small Angle SHMS Operation
CLAS12 Beamline Configurations
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Overview of CLAS12 Calibration
The 11T cryo-assembly: summary of design and integration aspects
CLAS12 First Experiment Workshop Report
Integration and IR Hall
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
Cryomodule Assembly Plan
as a prototype for Super c-tau factory
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead Engineer CLAS CD Workshop Saclay December 2-3, 2009

Thomas Jefferson National Accelerator Facility Page 2 CD Workshop Dec 2-3, 2009 Outline System Overview Solenoid and Support HTCC and Moeller Shields CTOF and Support SVT and support Summary/Conclusion

Thomas Jefferson National Accelerator Facility Page 3 CD Workshop Dec 2-3, 2009 Hall B Overview Hall B Space Frame Hall B – 98’ Diameter 20 Ton Polar Crane Beam entry tunnel Beam dump tunnel Cryogenic Supply and Return Line

Thomas Jefferson National Accelerator Facility Page 4 CD Workshop Dec 2-3, 2009 CLAS12 Detectors Silicon Vertex Tracker Central Time of Flight Solenoid High Threshold Cerenkov 3 Regions of Drift Chambers Torus 3 Panels of Time of Flight – 1a & 2 reused from CLAS Low Threshold Cerenkov – Reused from CLAS Electromagnetic Calorimeter – Reused from CLAS Pre-Shower Calorimeter

Thomas Jefferson National Accelerator Facility Page 5 CD Workshop Dec 2-3, 2009 Solenoid Purposes are: – Central field for tracking – Provide magnetic shielding of Moeller Electrons Peak field 5T Homogeneous central region 1e-4 in Ø =25mm L = 40mm Limited fringe field at locations of High Threshold Cerenkov PMT’s Contract awarded to Wang NMR 11/20/2009 Solenoid supported by 3 legged cart. Solenoid Lead can and Cryo reservoir Magnet Cryostat

Thomas Jefferson National Accelerator Facility Page 6 CD Workshop Dec 2-3, 2009 Central Detectors Central tracker and Time-of-Flight detectors are attached directly to the solenoid. This provides stable reliable support that will limit external vibrations since its mass is very large ~20tonn

Thomas Jefferson National Accelerator Facility Page 7 CD Workshop Dec 2-3, 2009 Plans for Mounting to Solenoid SVT Mounts CTOF Mounts Solenoid attachment to cart Solenoid specification shows desired mounting to be at ends of magnet. Details will need to be worked out with Vendor CTOF will be mounted from both ends Central Tracking Detectors must be mounted from upstream end only or we will loose HTCC and CLAS12 acceptance

Thomas Jefferson National Accelerator Facility Page 8 CD Workshop Dec 2-3, 2009 High Threshold Cerenkov Counter HTCC surrounds the solenoid and CD from outside It also protrudes inside with close clearance to the CTOF and also FST or other central tracker Several Moeller Electron Shields are planned They are envisioned to be cantilevered off the Torus Materials to be Lead or Tungsten or a combination Different configurations depending on the type of run (rastered or normal beam) High Threshold Cerenkov Outer cone- very close to light guides

Thomas Jefferson National Accelerator Facility Page 9 CD Workshop Dec 2-3, 2009 Central Detector Section View CTOF – ID = 500mm – OD = 563 mm HTCC starts at 380mm (desired to start earlier) Moeller Shield fits very closely to inside cone of HTCC High Threshold Cerenkov Outer cone- very close to light guides Moeller Shield

Thomas Jefferson National Accelerator Facility Page 10 CD Workshop Dec 2-3, 2009 Solenoid and Central Tracker SVT/Central Tracker supported off the Solenoid upstream Flange 6 link support system is the current design

Thomas Jefferson National Accelerator Facility Page 11 CD Workshop Dec 2-3, 2009 Latest Central Tracker Layout Two size BST stave assemblies Target size limited to 3” OD Considering removable R1 BST to allow HD Ice target Max radius of Central Tracker 238mm Note the HTCC starts at 380 mm so there is some room for Micro Megas

Thomas Jefferson National Accelerator Facility Page 12 CD Workshop Dec 2-3, 2009 Silicon Vertex Tracker Cold plate with brass inserts Stave support Stave Cooling analysis shows efficient heat removal Deflection analysis complete Assembly and alignment methods will be confirmed with region 1 barrel assembly Documentation and tech notes at

Thomas Jefferson National Accelerator Facility Page 13 CD Workshop Dec 2-3, 2009 Latest Stave Design Copper/Aluminum Nitride FR4 Silicon 3 places FR4 Copper Rohacell Many designs considered Latest design uses Silicon Wafer as structure as well as detector, (proposed by M. Merkin and analyzed by S. Mandal) Prototype cores formed at JLab in mold First results give core thickness 2.78mm +/ mm, with higher quality mold we expect better

Thomas Jefferson National Accelerator Facility Page 14 CD Workshop Dec 2-3, 2009 SVT Engineering Results ItemUnitsValue Coolant temperature C15 Peak temperatureC22.1 Maximum deflection Microns10 fixed-pinned (R3&4) R2 BST thermal analysis Max. Deflection ~10.5  m R3&R4 BST deflection analysis Max. Temp ~22.1 C

Thomas Jefferson National Accelerator Facility Page 15 CD Workshop Dec 2-3, 2009 CTOF There have been two parallel design efforts One with standard PMT’s and one with high magnetic field PMT’s decision on which one is pending more study on HF PMT design

Thomas Jefferson National Accelerator Facility Page 16 CD Workshop Dec 2-3, 2009 Solenoid and CTOF CTOF is supported from both the upstream and downstream flanges of the solenoid Room for Central calorimeter or Neutron detector is being left for future upgrade

Thomas Jefferson National Accelerator Facility Page 17 CD Workshop Dec 2-3, 2009 Installation of Counter Assembly Reference (conservative) design shown here Counters will be built and tested complete – Light guides glued to scintillator – Wrapped and light sealed – PMT’s and 2 of the 3 layers of shield pre-installed Individual counter assemblies will be installed one at a time A strong-back will support the counters to prevent bending and glue joint failure Installation fixture will clock the light guide assembly to the proper Φ angle Counter exploded view Strong Back

Thomas Jefferson National Accelerator Facility Page 18 CD Workshop Dec 2-3, 2009 Counter Assembly Installed Installation fixture will roll counter assembly into position through the Solenoid bore Light guide assembly will be mounted to permanent clamps, then strong-back clamps can be removed

Thomas Jefferson National Accelerator Facility Page 19 CD Workshop Dec 2-3, 2009 Beam Line Most Beam Line Devices reused from CLAS – Steering, focusing and raster magnets – Beam Profile Monitors and Beam Position Monitors – Cryogenic Target – Photon Devices will be left on beam line including Photon Tagger, radiators, collimators and pair spectrometer Shielding after target simulated and defined through the Torus Re-arrangement of Moeller measurement system components, a study optimizing this is underway Shielding Cryogenic Target and Cart BPM’s (2) Raster Magnets (2 pairs) Tagger Magnet and other Photon Devices

Thomas Jefferson National Accelerator Facility Page 20 CD Workshop Dec 2-3, 2009 Hall B Prepared for CLAS12 Installation Forward Carriage with Electromagnetic Calorimeters Space Frame Cleared of Beam Line equipment

Thomas Jefferson National Accelerator Facility Page 21 CD Workshop Dec 2-3, 2009 CLAS12 installation schedule

Thomas Jefferson National Accelerator Facility Page 22 CD Workshop Dec 2-3, 2009 CD installation An additional level will be added to the space frame for the CD and HTCC Torus will be installed next The Solenoid will be craned in CTOF will be installed after solenoid acceptance testing Central Tracker is installed last

Thomas Jefferson National Accelerator Facility Page 23 CD Workshop Dec 2-3, 2009 Torus Assembled and Central Detector added Solenoid and Central Detector - slides on rails into the space frame for maintenance Torus positioned and aligned Space frame addition for Central Detector and HTCC

Thomas Jefferson National Accelerator Facility Page 24 CD Workshop Dec 2-3, 2009 Safety To work in Hall B all persons must be Trained and Qualified All work in Hall B work is scheduled and reviewed by the Hall Work Coordinator Independent activities have been and will continue to be reviewed for space and resource interferences Stop Work Program will always apply ISM principles must be followed Lock Tag and Try/LOTO will be used Tested and Inspected lifting fixtures PPE will be worn as required Hall B is a low radiation environment this will allow most items to be removed from the hall after survey w/o delay.

Thomas Jefferson National Accelerator Facility Page 25 CD Workshop Dec 2-3, 2009 Summary Design of CTOF and SVT proceeding Will be working with Solenoid vendor on supports for CD Looking forward to contributions on Central Detector Planning for installation being integrated in the design phase

Thomas Jefferson National Accelerator Facility Page 26 CD Workshop Dec 2-3, 2009 CLAS12 is COMPLETE!