NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
New Source Review (NSR) Program Basics
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
Major Sources Pollutant Federal NSR 112(g) Major Major ROP Major PSD Major Offset Attainment Pollutants 250 or 100 NANA100 Non-Attainment Pollutants NA100NA100.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Iowa Title V Operating Permits Lori Hanson, Title V Operating Permit Section Supervisor.
New Federal Regulations for Internal Combustion Engines Doug Parce.
IDEM OFFICE OF AIR QUALITY PRIORITIES FOR Accomplishments In 2003 Achieved federal approval of Prevention of Significant Deterioration Permit.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Kimberton, PA | Columbus, GA | Strategic Air Planning: Where Do We Grow From Here? Colin McCall |
Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2014.
When “My Bad” Means You’re Bad EPA’s Renewed Focus on “Excess Emissions” Steve McKinney Air and Waste Management Association 2007 Annual Meeting & Technical.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Florida Department of Environmental Protection Nonattainment Area New Source Review Updates Rule Development Workshop Chapters and October.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
An Emissions Cap Alternative to New Source Review September 27, 1999.
1 Regulatory Concepts Related to the Control of NOx and SOx From Fossil- fired Electric Generating Units Air Quality Technical Advisory Committee Meeting.
The world’s leading sustainability consultancy Generic Front Cover What’s this layout for? This is the generic slide front cover, but you can also make.
Air Quality Program Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 9/12/
American Public Power Association Washington, DC April 27, 2010 Leslie Sue Ritts, RITTS LAW GROUP, PLLC 1.
UTILITY NSR REFORM TIMEFRAMES EARLY 90’SBEGIN CAAA IMPLEMENTATION MID 90’SNSR REFORM DEVELOPMENT - S/A Principles - EPA Proposals.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Air Quality 101 Kansas Air Quality Program overview.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Implications of the 2008 Ozone Standard Changes Deanna L. Duram, P.E., C.M. August 7, 2008 trinityconsultants.com.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
Proposed Rulemaking 25 Pa. Code Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review John Slade, Chief Division of Permits Bureau.
Flexible Air Permitting Innovation Done Right State-EPA Innovations Symposium Denver, CO January 24, 2006.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
Air Quality Management Comparison of Cap-and-Trade, Command-and Control and Rate-Based Programs Dr. Ruben Deza Senior Environmental Engineer Clean Air.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
New Source Review Reform & the PAL Tom Wood September 18,2003.
Air Quality Technical Advisory Committee Meeting September 27, 2006 Virendra Trivedi Chief, New Source Review/Title V Section Division of Permits Bureau.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
1 New Sources in Nonattainment Areas: Citizens Against Refinery’s Effects Action to review EPA approval of Virginia SIP SIP included: Permit for refinery.
New Source Review (NSR) Program Basics
Flexible Air Permitting
Overhaul of Combustion Turbines Under NSR Regulations
Introduction to the Definition of Solid Waste Final Rule
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Overview of New Source Review (NSR)
GHG Permitting: Regulatory Update
90-Day NSR Study and NSR Improvements
Boiler Sheltered Initiative
The Projected Actual Emissions test & the “Could have Accommodated”/ “Demand growth” Exclusion david Lloyd, States/Local programs/EPA enforcement workshop.
New Source Review Update
Status of RMRR or learning the definition of “routine”…
Effective Title V Permits
Air Quality Committee May 13, 2015
Best Available Control Technology for Greenhouse Gas Emissions Sources
Uinta Basin General Conformity
Presentation transcript:

NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002

RESOURCES  AUGUST, 1992 EPA WORKSHOP  FACA PROCESS  JULY, 1994 PRELIMINARY STAFF PROPOSAL  1996 FEDERAL REGISTER PROPOSAL  1998 NOTICE OF AVAILABILITY  STAKEHOLDER MEETINGS

NSR TOPICS  PLANTWIDE APPLICABILITY LIMITS  BASELINE EMISSIONS  CLEAN UNIT EXEMPTION  DEBOTTLENECKING  ROUTINE MAINTENANCE, REPAIR, AND REPLACEMENT

PURPOSE  It is my intent to present the history and reasoning behind the STAPPA/ALAPCO positions.  This is not meant to be a legal review of the NSR reform effort.  It also is not my intent to present the positions of other stakeholders.

AUGUST, 1992 EPA WORKSHOP  The EPA outlined the following Agency goals for the NSR program: (1) to ensure that an increase in emissions due to a greenfield source or modification to an existing source does not exacerbate or significantly deteriorate air quality, (2) to ensure that source emissions are consistent with the State's attainment plan, (3) to ensure that air quality related values are not negatively impacted in Class I areas, and (4) to establish control technology requirements that maximize productive capacity while minimizing impacts on air quality.

AUGUST, 1992 EPA WORKSHOP  The EPA acknowledged a need for NSR program simplification consistent with statutory intent. The NSR program should increase certainty and consistency, improve permit processing time, conserve personnel and financial resources for all parties, remove market distortions and encourage pollution prevention. While no effort was made to reach a consensus on additional NSR goals, the invitees identified other desirable goals: (1) minimize disincentives for sources to modernize or improve operations; (2) include special consideration for process changes that do not negatively impact the environment, but look like major increases when compared on the basis of overtime and capacity; and (3) reduce permit delays to encourage building new, cleaner facilities instead of modifying existing sources.

APPLICABILITY OPTIONS  Option 1 - Chemical Manufacturers Association (CMA) Exhibit B Settlement Agreement (Potential-to-Potential),  Option 2 -WEPCO Remand or Rule,  Option 3 - NSPS-Type Test without Netting,  Option 4 - NSPS-Type Test with Netting, and  Option 5 - Plantwide Emissions Limit.

FACA PROCESS  APPLICABILITY  PRECONSTRUCTION ACTIVITIES  PALs  CLASS I AREA ISSUES  POLLUTION CONTROL PROJECTS  BACT ISSUES

STAPPA/ALAPCO PRINCIPLES  BEST TIME TO CONTROL IS AT THE TIME OF SOURCE INSTALLATION OR MODIFICATION  SUPPORT TOP DOWN BACK PROCESS  AIR QUALITY ANALYSIS OF INCREASED EMISSIONS  NO NETTING OUT OF CONTROL  SUPPORT BACT/LAER CLEARINGHOUSE  PALs ARE SUPPORTABLE

STAPPA/ALAPCO PRINCIPLES  WE FAVOR A SIMPLIFICATION PROCESS WHICH GIVES INDUSTRY TIMELINESS AND CERTAINTY, BUT RETAINS A STRONG TECHNOLOGY REQUIREMENT FOR ALL NEW OR MODIFIED SOURCES.  REWARD GOOD CONTROLS WITH INCREASED SIMPLICITY AND FLEXIBILITY

PLANTWIDE APPLICABILITY LIMIT  CONCEPT “BORN” IN EPA SHIFT FROM DUAL-SOURCE DEFINITION TO PLANTWIDE  ORIGINAL PROPOSAL WAS FOR MANDATORY AND AREA-WIDE PALs  BASED ON CURRENT ACTUALS

PALs—1996 PROPOSAL  VOLUNTARY PALs  ACTUALS BASED ON LAST 2 YEARS  ALLOWABLES IF NEW PLANT IN LAST 5 YEARS  LOTS OF ISSUES FOR COMMENT

PALs—ISSUES  COMPLIANCE VERIFICATION  ACTUALS VS ALLOWABLES  NEW UNITS AND CONTROLS  POLLUTANTS COVERED  INTERACTION WITH TITLE V  MACT AND HAPs  PERIODIC ADJUSTMENTS

STAPPA/ALAPCO RECOMMENDATIONS  ACTUALS BASED ON LAST 2 YEARS  ALLOWABLES--DECLINING CAPS BASED ON BACT  SIGNIFICANT NEW UNITS MEET BACT  TITLE V ENFORCEMENT  REVIEWED PERIODICALLY

BASELINE EMISSIONS  DESIRE FOR A COMMON, PREDICTABLE, AND USEFUL BASELINE  CURRENTLY AVERAGE OVER LAST TWO YEARS  ADMINISTRATOR HAS DISCRETION TO CONSIDER SOME OTHER TIME PERIOD  WEPCO ALLOWS A FIVE YEAR LOOKBACK  1996 PROPOSAL FOR HIGHEST PRODUCTION LEVEL IN PAST TEN YEARS BUT KEEPS FIVE YEAR CONTEMPORANEOUS RULE

BASELINE EMISSIONS ISSUES  TWO, FIVE, OR TEN YEAR LOOKBACK  HOURLY OR ANNUAL EMISSIONS  ACTUAL/POTENTIAL/ALLOWABLE AND IN WHAT COMBINATION?  RESOURCES AND RECORDS

STAPPA/ALAPCO RECOMMENDATIONS  MAINTAIN CURRENT TWO YEAR BASELINE WITH ADMINISTRATOR’S DISCRETION TO CONSIDER A MORE REPRESENTATIVE PERIOD  ALTERNATIVE FOR ALLOWABLES BASED PALs

CLEAN UNIT  GREW OUT OF FACA DISCUSSION OF AN ALLOWABLE-TO-ALLOWABLE TEST FOR PREVIOUSLY REVIEWED UNITS  APPEARED IN 1994 PRELIMINARY STAFF PROPOSAL

CLEAN UNIT—1996 PROPOSAL  EXPANDED TO INCLUDE CLEAN FACILITIES  TEN YEAR TIME PERIOD  REJECTED MACT AND RACT AS “CLEAN”  USE OF TITLE V

STAPPA/ALAPCO RECOMMENDATIONS  TEN YEAR TIME PERIOD IS EXCESSIVE  ONLY “TODAY’S” BACT/LAER QUALIFY AS CLEAN  USE TITLE V FOR ENFORCEMENT  FIVE YEAR RENEWAL

DEBOTTLENECKING  … where there is reason to believe that the project will result in debottlenecking…………..or other meaningful increase in the use of the unit above current levels. Where the project will increase utilization and emissions, the associated emissions increases are calculated based on the post-modification potential to emit of the unit considering the application of the proposed controls (i.e., the "actual-to-potential" test). In such cases the permitting agency would consider the projected increase in emissions as collateral to the project

DEBOTTLENECKING  NO CURRENT EPA PROPOSAL  SHOULD BE “COVERED” UNDER TITLE V PERMITS  SHOULD ALSO BE “COVERED” UNDER PALs  POSSIBLE TIE TO POLLUTION CONTROL PROJECTS

ROUTINE MAINTENANCE, REPAIR, AND REPLACEMENT  EPA RULES STATE:  A physical change or change in the method of operation shall not include: (a) routine maintenance, repair, and replacement

ROUTINE MAINTENANCE, REPAIR, AND REPLACEMENT  NO DEFINITION BUT LOTS OF HISTORY  WEPCO COURT CASE  LIFE EXTENSION PROJECTS/ REFURBISHMENTS  CAPITAL COSTS VS MAINTENANCE COSTS

1994 PRELIMINARY STAFF PROPOSAL  (B) Routine maintenance, repair and replacement does not include: (1) An activity that either increases or affects: emissions of any pollutant, the present efficiency, capacity, operating rate, utilization, or fuel adaptability of the source or any emission unit; (2) An activity that substantially extends the useful economic life of the emission unit; or (3) A reconstruction as defined in 40 CFR

STAPPA/ALAPCO RECOMMENDATIONS  EPA DEFINITION COULD HELP  INDUSTRY SPECIFIC LISTS COULD HELP  OPPOSED TO INVESTMENT TEST  OPPOSED TO LIKE-KIND REPLACEMENT EXEMPTION

BOTTOM LINE PRINCIPLES  REWARD GOOD CONTROLS WITH INCREASED SIMPLICITY AND FLEXIBILITY  GREATLY STREAMLINE THE NSR PROGRAM FOR WELL-CONTROLLED (CLEAN UNIT) SOURCES  STRESS THE APPLICATION OF BACT