Joseph “Colt” Murphy Senior Financial Analyst ODASD Materiel Readiness 8 Dec 2010 OSD Product Support BCA Guidebook.

Slides:



Advertisements
Similar presentations
<<Date>><<SDLC Phase>>
Advertisements

U.S. General Services Administration Presentation to: ACT-IAC Cybersecurity SIG Improving Cybersecurity through Acquisition Emile Monette Senior Advisor.
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Contractor Assurance Discussion Forrestal Building Washington, D.C. December 14, 2011.
HHS CEA Executive Briefing Enterprise Performance Life Cycle (EPLC) Overview February 6, 2009.
ACT CANADA 2014: Using Business Cases To Get Great Projects Financed and Delivered December 1, 2014| Michael Sutherland.
Enterprise Architecture
Office of the Under Secretary of Defense (Comptroller) Physical Inventory Best Practices 1 Briefing for Joint Physical Inventory Working Group September.
What is Business Analysis Planning & Monitoring?
Program Update ASMC Meeting May BMMP Mission “Transform business operations to achieve improved warfighter support while enabling financial accountability.
Environmental Impact Assessment (EIA): Overview
The Microsoft Office 2007 Enterprise Project Management Solution:
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
Environment, Safety and Occupational Health (ESOH) in the DoD Business Management Modernization Program April 2005 John Coho I&E Business Transformation.
NIST Special Publication Revision 1
1 Hsin Chu, August 2012 Regulatory Impact Assessment Charles-Henri Montin, Senior Regulatory Expert, Ministry of economy and finance, Paris
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Life Cycle Product Support Brief to LCL FIPT July 17, 2009.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Life Cycle Cost-Logistics Improvement Joint Task with NDIA Logistics Div August J. Cothran B. Pieper J.S. Moorvitch.
Improving Certification, Training, & Professional Development for the AT&L Community Project Update Robert Hausmann, CNAC Judith Bayliss, DAU.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Life Cycle Logistics.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
The Value Driven Approach
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
LOG FIPT October 16, 2009 DoD Product Support Assessment Team (PSAT) Implementation.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Overview MRD Enterprise MRD Process
DoD Template for Application of TLCSM and PBL
Sample Fit-Gap Kick-off
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
Regulatory Strategies and Solutions Group, LLC
Capital Project / Infrastructure Renewal – Making the Business Case
Guiding Principles The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter.
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
The Open Group Architecture Framework (TOGAF)
Proposal/Initiative Title
Defense Logistics: Integrated and Efficient
Continuity Guidance Circular Webinar
Project Management Process Groups
Employee engagement Delivery guide
KEY INITIATIVE Shared Services Function Management
Stories of Transformation
Background and Overview
Presentation transcript:

Joseph “Colt” Murphy Senior Financial Analyst ODASD Materiel Readiness 8 Dec 2010 OSD Product Support BCA Guidebook

Introduction Product Support BCA Guidebook – Draft document – Final review phases within Materiel Readiness Purpose of brief – Explain the PSM need for standardized, transparent, and defendable decision making process – Present an overview of the BCA guide, context, and application 1

Overview Product Support Background – Assessments of DOD Product Support Actions – Product Support Strategy – Product Support Business Model Product Support BCA Guidebook – Definition – Structure – Delivery – Other considerations 2

Findings from GAO Report-December 2008 “29 PBLs examined (9 USA, 10 DON, 10 USAF) – Most of the Services have not established internal controls necessary to ensure a comprehensive assessment…many inconsistencies across the Services guidance. – In general, BCAs were either not done, not fully documented, or were not comprehensive or sound – Almost all costs were either difficult to verify/validate or trace back to sound accounting data” 3

2009 DoD Weapon System Acquisition Reform: Product Support Assessment (PSA) 4 Product Support Business Model: Provide Program Managers a model template for a weapon system support strategy that drives cost- effective performance and capability for the Warfighter across the weapon system life cycle and enables most advantageous use of an integrated defense industrial base Supply Chain Operational Strategy: Connect platform product support strategies to enterprise supply chain approaches that produces best value across the DoD components Industrial Integration Strategy: Align and expand the collaboration between Government & Industry that produces best value partnering practices Weapons System Data: Define, collect, report, and manage the data we need to drive effective Life Cycle Product Support Metrics: Use existing metrics to catalyze sustainment strategies and trigger continuous supportability analysis O&S Costs: Improve O&S cost visibility and influence Analytical Tools: Build a toolbox of analytical approaches (including BCA) Human Capital: Integrate Product Support competencies across the Logistics and Acquisition workforce domain to institutionalize successful traits of an outcome-based culture Governance: Strengthen and develop organization and mgmt processes to deliver the right sustainment information to decision-makers

Product Support Manager Product Support Strategy – The business model of an integrated system – Balance across functional areas and stakeholders – Evolutionary process develops the strategy Congressional influences on the Strategy – Required governmental position with responsibility – Improved credibility and transparency of data and decision making – Directive in governing frequency and supporting documentation of decision making NDAA 2010 Section 805, WSARA

DoD Product Support Strategy Process 6

Analysis of support and strategy options 7 CONTRACTOR ORGANIC Organic Support Contractor Support Transaction Based Support Performance Based Support Best Mix Partnering Opportunities Partnering Opportunities Title 10 (CORE & 50/50) Title 10 (CORE & 50/50) Service Policies Service Policies OSD/Service Guidance OSD/Service Guidance Existing Infrastructure Existing Infrastructure Best Competencies Best Competencies Operational Mission Operational Mission Best Value Assessment Best Value Assessment Best Mix of Public/PrivateCapabilities Optimal use of Performance Based Strategies

Product Support Decision Matrix 8

Overview Product Support Background – Assessments of DOD Product Support Actions – Product Support Strategy – Product Support Business Model Product Support BCA Guidebook – Definition – Structure – Delivery – Other considerations 9

DoD Product Support BCA Definition What is a BCA? “A (Product Support) BCA is a structured methodology and document that aids decision making by identifying and comparing alternatives by examining the mission and business impacts (both financial and non-financial), risks, and sensitivities” 10

Purpose of a BCA Support decisions that balance benefits, costs and risks within some form of prioritization Provides a fair and objective study to lead to a decision, not justify a decision after the fact For product support strategies, assess performance and costs with the goal to: – Optimize total system availability – Minimize cost – Minimize logistics footprint 11

Business Case Analysis Structure 12

BCA Sustainment Guidebook Overview 13 – Purpose – People – Data Management – Process & Content – Governance – Documentation – Checklist – References

BCA People 14 A.Sponsor B.Owner C.Warfighter D.PM/PSM E.Governance Body F.Business Analyst G.Logistician H.Systems Engineer I.PSI/PSP J.Data Manager K.Legal & Contracts L.Approval Authorities M.Subject Matter Experts (SMEs) N.Other

Draft DoD BCA Process 15 The BCA process flow prepares, performs, and presents a BCA in a structured manner to ensure effective documentation and credible decision support.

BCA – Content 16 Executive Summary Introduction Problem Statement Background Scope Desired Outcomes and Requirements Desired Outcomes Requirements Assumptions and Methods Grounds Rules, Assumptions, and Constraints Analysis Methods, Tools, and Rationale Evaluation Criteria Alternatives Current Baseline/Anticipated Initial Support/Status Quo Alternatives Mission and Business Impacts Benefits and Nonfinancial Analysis Cost and Financial Analysis Risk Analysis Risk Analysis and Mitigation Plans Sensitivity Analysis Conclusion Comparison of Alternatives Summary of Results Recommendations Specific Actions Based on Business Objectives Implementation Plan

Comparison of Alternatives Overall integrated score for each alternative – Requires extensive weighting and scoring (scoring criteria essential) – Rolls cost, schedule, and performance into a single score – Potential to lose important distinctions in the process – Good for repeatability and transparency Robust discussions of the recommendation present the trade space around the decision 17

BCA Delivery An undelivered BCA = no BCA – Narrative document, fully addresses the study – Comprehensive and organized in a useful manner for decision makers and reviewing officials – Fully supported with documentation Anticipated oversight requirements Credibility required to stand up to rigorous auditing The document is iterative by nature – Foundation for follow-on studies within the program – Useful in analogy methodology of future programs 18

Other BCA Attributes Standardized BCA process – Its principles are similar to those of any scientific or objective based study – Emphasis on credibility, transparency and repeatability Process is standard yet methods are not prescribed – Tailor to the problem statement – Availability of required data can drive analysis – Required fidelity of the results can drive scope – Time and resources available vary by program 19

Other BCA Considerations Workload associated with a BCA can vary from moderate to very large You get what you pay for (sometimes) Standardized BCA process has many positives – Decision support becomes consistent – Process clarity provides greater understanding and less ambiguity – Structure inherently provides for easier review, updating, and incorporating into follow-on studies 20

Product Support BCA Requirements 21

DoD Product Support BCA Principles to Keep in Mind Product Support BCAs should be based on Warfighter requirements Be linked to Warfighter outcomes, metrics and contract incentives For ACAT 1 programs, develop initial BCA prior to MS B and perform detailed BCA prior to MS C Use best value determination Update BCA every five years or prior to a change in Product Support Strategy 22

Discussion 23

Back-up 24

Product Support Strategy Specifics For legacy programs, assess changes to existing strategy – develop new program strategy For legacy programs, use cost and performance history for baseline – for new programs establish baseline early in the life cycle Reflect operational requirements and DoD guidance for contractors on the battlefield Address flexibility to support contingencies and surge requirements Value and affordability based decision 25