CIGRE Study Committee B3 “Substations”

Slides:



Advertisements
Similar presentations
Conducting your own Data Life Cycle Audit
Advertisements

Bernard Casier Member Quality Audit Cell The Flemish Quality Audit System Brussels, 26 th June 2012.
STUDY COMMITTEE C3, System Environmental Performance Meeting CNI, Latina 24 Novembre 2010 Study Committee C3 Antonio Negri.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Science Subject Leader Training
President of the National Statistics Council 1 Ridha FERCHIOU National Statistics Council 2007 CNS OECD World Forum on Statistics, Knowledge and Policy.
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
International Approaches to Labour Migration GTZ conference on Migration and Labour, Berlin 12 June 2007 Louka T. Katseli, Director, OECD Development Centre.
International Organization International Organization
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
NANC Report Future of Numbering Working Group (FoN) FoN Co-Chairs Don Gray, Nebraska PSC Adam Newman, Telcordia Technologies Jim Castagna, Verizon October.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The Implementation Structure DG AGRI, October 2005
What is valorisation ? Growth €
Action s innovant es t ransnational es Calls for Proposals France: ESF Innovative Transnational Actions.
International Telecommuniction Regulations 1 WG-ITR Council Working Group on ITRs General Overview Alaa M. Fahmy Chairman.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Welcome School Improvement Advisory Committee Members We are happy youre here!
Addition Facts
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
HE in FE: The Higher Education Academy and its Subject Centres Ian Lindsay Academic Advisor HE in FE.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
2009 Strategic Planning playbook
1 Looking at the TPBs Draft Participation Plan Presentation to the Transportation Planning Board July 18, 2007 Sarah Crawford Transportation Planner Department.
A Path breaking Technology for Network Maintenance and Optimization
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Business Promotion Opportunities Logos Mahatma Mandir, Sector-13, Gandhinagar, Nr Ahmedabad.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
15. Oktober Oktober Oktober 2012.
Programme Tx / Dx Demarcation Feb 08. Programme Topics cover in this presentation Back Ground Existing and future MTS substations Lines.
We are learning how to read the 24 hour clock
SIMOCODE-DP Software.
PM NAAQS Review Update Joseph Paisie Air Quality Strategies & Standards Division, Office of Air Quality Planning & Standards, EPA WESTAR Fall Business.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Addition 1’s to 20.
25 seconds left…...
“How will the new Primary Curriculum affect my school
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI Maximization Strategy at Duke Energy Tim Murphy IT Manager.
Week 1.
We will resume in: 25 Minutes.
Marketing Strategy and the Marketing Plan
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Module 13 Unified Command Module 13 Unified Command Origin of Unified Command Origin of Unified Command Description of Unified Command Description of Unified.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
Study Committee SC B3 CIGRE – CNC Toronto, October 2, 2009 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of substations.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
Study Committee SC B3 CIGRE - CNC Winnipeg, October 19, 2008 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C6 DISTRIBUTION SYSTEMS AND DISPERSED GENERATION.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Presentation transcript:

CIGRE Study Committee B3 “Substations” Prepared by Wolfgang Degen B3-AA2 Hanna Abdallah Modern substation technology CIGRE SC B3 “Substations”

CIGRE Study Committee B3 “Substations” Scope: Study Committee B3 is responsible for the design, construction, maintenance and ongoing management of substations and the electrical equipment in power stations, excluding generators. It serves a broad range of target groups in the Electric Power Industry whose interests cover technical, economic, environmental and social considerations in varying degrees

Modern substation technology CIGRE SC B3 “Substations” Number of represented countries: 36 24 Members and 12 Observers Number of working groups: 14 Number of advisory groups: 4 Annual meetings since 2002: 2002 Paris 2003 Utrecht* 2004 Paris 2005 Tokyo* 2006 Paris 2007 Berlin* 2008 Paris 2009 Capetown* * Colloquium, Tutorial and Panel

SC B3-Composition 2007 – Regular Members

SC- Composition 2007 - Observers

Organizational Diagram of CIGRE Study Committee B3 Strategic Advisory Group (includes 5 Area Advisors) A. Wiersma SC Secretary C. Counan SC Chairman Customer Advisory Group G. Breen Tutorial Advisory Group F. Besold Co-operation Group B3/B5/A3 F. Baldinger Study Committee 24 Regular Members, 12 Observer Members, 1 Special Reporter, all WB Convenors AA1 Substation Concepts and Developments H.-E. Olovsson AA2 Gas Insulated Substations W. Degen AA3 Air Insulated A. Sahazizian AA4 Substation Management J. Smit AA5 Secondary Systems B3.01 Concepts Hans Erik B3/B1.09 Application of Long High-Capacity GIL in Structures H. Koch B3.12 Obtaining Value from Substation Condition Monitoring A. Mackrell B3.17 Residual Life Concepts Applied to HV GIS K.Pohlink B3.15 Cost Reductions of Air Insulated Substations K. Kawakita B3.06 Substation Management TF 04 Replacement TF 05 Info Strategy B3.10 Primary/Secondary System Interface Modelling for Total Asset Performance Area Advisors (AA) and Working Groups B3.18 SF 6 Tightness Guide P.Glaubitz June 2007 2007 B3.13 Reducing replacement time of HV equipment F. Gallon B3.20 Mixed Technology Switchgear W. Degen B3.21 Turnkey Substations A.-M. Sahazizian B3.22 UHV Substations T. Yokota B3.11 Combining Innovation with Standardization J. Finn B3/C1/C2.14 Circuit Configuration Optimization G. Lingner Organisational diagram of CIGRE SC B3 “Substations”

Modern substation technology CIGRE SC B3 “Substations” SAG (Strategic Advisory Group) The objective of the Strategic Advisory Group is to support the SC Chairman in order to : ■ optimize the organization to the changing environment ■ suggest contributions/presentations by SC members and working groups for events ■ regularly update the committee’s strategic plan

Modern substation technology CIGRE SC B3 “Substations” CAG  (Customer Advisory Group) The CAG aims are: ■ Identify opportunities to increase customer satisfaction; ■ Collect feedback from customers, suggest work and preferential subjects; ■ Develop concepts for improved customer information and support implementation.

Modern substation technology CIGRE SC B3 “Substations” The CAG aims are: ■ Identify opportunities to increase customer satisfaction; ■ Collect feedback from customers, suggest work and preferential subjects; ■ Develop concepts for improved customer information and support implementation.

Modern substation technology CIGRE SC B3 “Substations” TAG (Tutorial Advisory Group) The general objective of the TAG is to advise the Study Committee and its Chairman on the implementation of CIGRE policy in relation to tutorials .

Modern substation technology CIGRE SC B3 “Substations” AA1 Substations Concepts and Developments” The advisory area covers the whole substation in a system approach as nodes of optimal power systems. The main directions outlined in the Strategic Plan should guide the activities related to AA1. The technical, environmental and economical aspects related to substation concepts, should be an integral part of the activities. WG B3.11: Combining Innovation with Standardization. B3.12 Obtaining Value from Substation Condition Monitoring WG B3.13 Reducing Replacement Time of High Voltage Equipment. WG B3-C1-C2.14 Circuit Configuration Optimization

Modern substation technology CIGRE SC B3 “Substations” AA1 Substations Concepts and Developments” The advisory area covers the whole substation in a system approach as nodes of optimal power systems. The main directions outlined in the Strategic Plan should guide the activities related to AA1. The technical, environmental and economical aspects related to substation concepts, should be an integral part of the activities. WG B3.11: Combining Innovation with Standardization. B3.12 Obtaining Value from Substation Condition Monitoring WG B3.13 Reducing Replacement Time of High Voltage Equipment. WG B3-C1-C2.14 Circuit Configuration Optimization

Modern substation technology CIGRE SC B3 “Substations” GAS INSULATED SUBSTATION COVERS ALL ASPECTS OF DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE AND LIFE CYCLE MANAGEMENT OF THE PRIMARY INSTALLATIONS OF GAS INSULATED SUBSTATION. WG B3-02 “Gas Insulated Substations” WG B3-17 "GIS Life" WG B3-18 "SF6” WG B3-20 "Mixed Technologies Switchgear" WG B3/B1-09 “Application of Long High Capacity Gas Insulated Lines”

Modern substation technology CIGRE SC B3 “Substations” AIR INSULATED SUBSTATION THE ADVISORY AREA COVERS ALL ASPECTS OF DESIGN,CONSTRUCTION,OPERATION AND LIFE CYCLE MANAGEMENT OF THE PRIMARY INSTALLATIONS OF AIR INSULATED SUBSTATION: TF B3-15 “Cost Reductions of AIS” Turnkey Substation

Modern substation technology CIGRE SC B3 “Substations” ADVISORY AREA AA4 SUBSTATION MANAGEMENT JWG B3-06 -Substation Management- JTF B3/A2/A3/B2/C2-19 - Dynamic Loading of Electric Power Transmission Equipment

Modern substation technology CIGRE SC B3 “Substations” Information: www.cigre-b3.org/ Contact: Hanna Abdallah (US Delegate-Substation Committee) Email: Hannaessa.abdallah@aps.com Virginia C. Sulzberger (USNC Secretary-Treasurer) v.c.sulzberger@comcast.net

Documentation of Work (1) Publish and make available papers and guides drawn up by CIGRE, such as : SF6, EMF, Mixed Technologies Switchgear… It should contribute to recognition of CIGRE as a technical reference body.

Documentation of Work (2) ELECTRA (CIGRE Publication) A report on the technical activities of CIGRE, referred to as General Report, will be published every year in the June issue. To this end, the detailed Study Committee Progress Reports on the basis of which the General Report will be drawn up will have to be available by mid-April. These Progress Reports and the General Report will be available on the CIGRE website and freely accessible to all.

Thursday 28th August 2008 I hope to welcome you all! SC B3 “Substations” next meeting: (CIGRE conference Paris) Thursday 28th August 2008 Palais des Congrès, Salle Bleue, 08.45 hrs I hope to welcome you all!

Preferential Subject 1 PS1: Lessons learned on Substation Asset Use Optimization Refurbishment, renewal and maintenance strategies. Influences of dynamic loading on maintenance policy and asset performance. Substation lifecycle cost reduction. Benefits of condition monitoring for decision support.

Preferential Subject 2 PS2: New Challenges in Substations Impacts of future network concept, e.g. “smart grids”, on substation design, primary and secondary (digital communication, automation, control and operation) Connecting new renewable generation including offshore substations. Coping with major growth, e.g. mega-cities and metropolitan areas. Designs for least environmental impact. Innovative designs/layouts to increase operational flexibility, overcome site constraints (including economical consequences), etc. Impact and experience of the process bus on the substation as a whole.

Modern substation technology CIGRE SC B3 “Substations” See you in Paris Modern substation technology CIGRE SC B3 “Substations”