Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.

Slides:



Advertisements
Similar presentations
The Proxity database is organized to allow the user to do market research on what is being acquired by the Government- who are the acquisition people involved-
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Modern Systems Analyst and as a Project Manager
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
What’s Inside / Coming Attractions
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Prioritized Scheduling and Managing of All Utility Work Utility Characteristics Historical Concerns Improvement Goals Process Teams Implementation of.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
TurnKey Project Management Services Capabilities Briefing.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Program Management Overview (An Introduction)
Northeast Utilities Transmission – Managing Capital Projects Presentation to UCONN Graduate Business Studies Program Operations Management May 29, 2008.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Distributed Power Systems ELCT 908
Other Planning Processes: Final Planning Touches
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
S/W Project Management
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
From Research Prototype to Production
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1/25 AREVA NP Bulatom Conference, Varna, May 28-30, 2008 Copyright © AREVA NP GmbH All rights, including rights created by patent grant or registration.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
6-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 6 Systems Development.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Specification & Quantities Estimating
Topic1b: Project Life Cycle
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Contractor Alternate Design Serving the Public’s Best Interest.
Utility Engineers, PC.  Generation  Transmission  Distribution.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Estimating and Scheduling CEE 492
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
project management software
Presentation transcript:

Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project Management Plus, Inc. All rights reserved.

Introduction Focus on substation, transmission and distribution (T&D) Project manager (PM) rather than lead engineer is now the responsible individual Effective PM requires insight –Technical aspects –Work practices

Agenda Inception and categories of substation, transmission and distribution projects Composition and interaction of a typical electric utility project team Case histories Keys to success

Project Categories Regulatory –EPA –NERC Public Improvement New Business

Project Categories Reliability –Tree trimming –Cable replacement Capacity (Summer Critical)

Budgeting and Prioritization Budget set by upper management Priority system for projects using proven metrics Projects are racked and stacked

Project Team PM needs to pull the team together Knowledge of work flow process Environmenta l Testing Operations Procuremen t Construction Engineerin g Real Estate Planning Network

At the Forefront Planners (analysts) –Review load data –Recommend changes based on planning criteria Customer support –Involved if new business –Liaison between customer and utility Project controls –Schedulers –Work planners

Design Stage Engineering –Substation, transmission or distribution Real Estate –Easements, Right of Ways, Surveying Environmental –Wetland permits, endangered species Procurement –Acquire major equipment Stores –Reserve material (cable, conduit, etc.)

Construction Stage Construction –Substation, transmission or distribution Operations –Outage and switching plans Network - IT –SCADA, communications Testing –Set protective relays, equipment check-out

Unraveling the Underground Maze Overview –Install 5 miles of 138kV underground transmission through the streets of a large city. –Need signoffs from 24 city and private entities –12 designers and 4 engineers assigned to project team –Inexperienced with city permit process

Unraveling the Underground Maze Action Plan –Need to locate a firm familiar with Underground facilities Permitting process –A subsurface utility engineering (SUE) firm was identified and interviewed

Unraveling the Underground Maze Results –SUE firm was approved as a subcontractor –Designers reduced from 12 to 6 –Received critical advice and support during the permitting process

The Mystery of the Missing Control Building Overview –Substation control building – critical path –The buildings subcontractor schedule was fluid –Client facing a substantial penalty if the project was not completed on time

The Mystery of the Missing Control Building Action Plan –Visit the subcontractors plant –All hands meeting at the plant –Added shift and personnel –Metric to measure progress –Corrective actions implemented

The Mystery of the Missing Control Building Results –Control building shipped in 3 weeks –Entire project completed on schedule –Penalty clause not invoked

The Secret of Conceptual Drawings Overview –3 projects, 2 were summer critical –The 3 rd project was a public improvement –All 3 in the same geographic area –Goal was to complete summer critical projects without any rework later –Internal construction resources unavailable –Detailed design and easement acquisition not complete

The Secret of Conceptual Drawings Action Plan –Develop a construction bid package using Conceptual drawings Unit prices –Estimated total of almost 23,000 feet of conduit and 6 underground vaults –Design and easement acquisition proceeds during bid process

The Secret of Conceptual Drawings Results –Bid package release and award on time –Design released to construction in phases as easements were obtained –Summer critical projects completed on schedule –Contract extras resolved via unit prices

Keys to Success Safety Understand the workflow Beware of hand-offs and interfaces Meetings – agenda and action items Communicate –Field forces –Operations –Governmental entities Compliment excellent performance

Questions? Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project Management Plus, Inc. All rights reserved.