G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.

Slides:



Advertisements
Similar presentations
Triple-GEM detector operation for high-rate particle triggering W. Bonivento, G. Bencivenni, A. Cardini, C. Deplano, P. de Simone, F. Murtas, D. Pinci,
Advertisements

GEM Chambers at BNL The detector from CERN, can be configured with up to 4 GEMs The detector for pad readout and drift studies, 2 GEM maximum.
Un Rivelatore a Tripla-GEM per le Camere a Muoni di LHCb
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
G.Bencivenni LNF-INFN, GEM Training Session – CERN, 16, Feb THE LHCb EXPERIENCE WITH THE ASSEMBLY OF THE GEM (*) G. Bencivenni LNF - INFN Italy.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Status of PNPI R&D for choice of the MUCH tracking base detector (this work is supported by INTAS) ■ Introduction ■ MICROMEGAS ■ GEM ■ MICROMEGAS+GEM ■
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
Status of KLOE-2 Inner Tracker JOINT-GEM meeting Helsinki 15 July 2010 G.Bencivenni.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
HV connection for a Common GEM foil design Aiwu Zhang
Siena, 24 th May 2004 Aging Measurements on Triple-GEM detectors operated with CF4-based gas mixtures M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
F.Murtas1IMAGEM DDG GEM technology for X-ray and Gamma imaging IMAGEM l Detector setup l First results on X-ray imaging l First results on Gamma ray imaging.
A. Muraro 1, G. Croci 1,2, C. Cazzaniga 3, G. Claps 4, M. Cavenago 5, G. Grosso 1, F. Murtas 4,6,, E. Perelli Cippo 1, M. Rebai 2,3, R. Pasqualotto 7,
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
F.Murtas1 CNAO- ARDENT Workshop October 19 th 2012 Triple GEM detectors : Beam monitoring for beam profile and intensity measurements. Construction of.
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
18 October 2013 TRAINING COURSE ON RADIATION DOSIMETRY: Micro Dosimetry with GEM (Gas Electron Multiplier) and GEMpix F. Murtas, CERN-INFN.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
TEMPLATE DESIGN © CONFIG. 1: 12mm(Drift) / 12mm(T1) / 12mm(T2) / 12mm(Induction) CMS Endcap Resistive Plate Chamber Muon.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
M23 Inner Regions Upgrade with Triple-GEM detectors The XVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Report on very preliminary measurements of 10x10cm 2 Triple-GEM detectors with New Single Mask technique Overview Hole geometry Experimental setup Transparency.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
The interaction of the Laboratori Nazionali di Frascati– INFN with TE-MPE-EM Workshop G. Bencivenni LNF-INFN Frascati - Italy.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
F. Murtas CERN-INFN Frascati December 2 th 2013 – He3 free detectors Italy Workshop 1 Front End Electronics for GEM detector  Neutron detectors and GEM.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS 12th Topical Seminar on Innovative.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
GEM detectors activity at the Laboratori Nazionali di Frascati INFN G.BencivenniLNF-INFN.
F.Murtas G.Claps, E.Baracchini 1 EDIT FrascatiOctober 22 h 2015 GEMPIX detectors : GEM with higly pixelated readout Introduction GEMPIX Detectors GEMPIX.
Trigger & Tracking detector for CMS
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Entrance Muon Counter (EMC)
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Triple GEM detectors : measurements of stray neutron.
LABORATORI NAZIONALI DI FRASCATI
On behalf of the GEMs for CMS Collaboration
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
Simone Brusa / INFN – Ferrara On behalf of LHCb muon group:
(On Behalf of CMS Muon Group)
Resistive Plate Chambers performance with Cosmic Rays
Beam Monitors with GEM detectors
Presentation transcript:

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 2,3, M. Poli-Lener 1, D. Raspino Laboratori Nazionali di Frascati - INFN, Frascati, Italy 2 - Sezione INFN di Cagliari – Cagliari, Italy 3 - Università degli Studi di Cagliari, Cagliari, Italy

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002  2002 tests beam summary  Module-0 test results (preliminary)  New aging test results (preliminary)  Future Plans OUTLINE

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Discharge probability < %  inefficiency due to re-charging time End of efficiency plateau given by the limit on the discharge probability of During the PSI test each detector integrated without any damage or aging effect about 5000 discharges, corresponding to a discharge probability per incident particle of in 10 years at LHCb. Discharge probability per incident particle Start of efficiency plateau: 99% in 25 ns per station PSI beam test (June 2002): discharge studies

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 CERN test (July 2002): fast gas efficiency Single detector Efficiency in 25 ns 99% Efficiency in 25 ns Two detector in OR These results were obtained with a thr of 3 fC

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Discharge probability < % efficiency in 25 ns of two chambers in OR (measured after 10 years LHCb equivalent) 1250 V1315 V at least 65 V wide working region PSI + CERN beam test Ar/CO 2 /CF 4 = 45/15/40

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Module-0 test at T11-PS (october 2002)  Two coupled triple-GEM;  active area: 20x24 cm 2 (top side of each GEM divided in 6 sectors);  2x192 pads (10x25 mm 2 );  2x120 pads instrumented with ASDQ fee: HIGH operating threshold: ~ 200mV 5 fC

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Chamber A: one sector of one GEM foil was disconnected because the limiting resistor was broken and the whole GEM had to be supplied at lower voltage Chamber B: OK Total Efficiency Chamber B Total Efficiency Chamber A Module-0 test at T11-PS (october 2002)

G.Bencivenni LNF/INFNMuon Meeting 21-October mm 240 mm 34 mm Holes for SMD decoupling resistor G10 Frame

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Good uniformity even though efficiency is a little bit low, due to high thres hold (5 fC instead of3 fC) Module-0 test at T11-PS (october 2002) efficiency in 25 ns Chamber B efficiency in 25 ns A or B

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Module-0 test at T11-PS (october 2002) fine scan measurements with small crossed scintillator fingers Chamber B Cluster size uniformity Good and uniform cluster size along the pads Chamber B Cluster size-fine scan CS=1.1 on pad center CS=1.2 on pad edge

G.Bencivenni LNF/INFNMuon Meeting 21-October years of LHCb R1-M G=2x10 4 Aging test(I) By irradiating the detector with an X-rays flux of 50 MHz/cm 2 : ~ 20 C/cm 2 was integrated with G= 2x10 4 (15 LHCb Y) ~ 4.5 C/cm 2 was integrated with G= 6x10 3 (10 LHCb Y) Gain change less than 5% 10 years of LHCb R1-M G=6x10 3 P and T variations are corrected by using a low irradiated 3-GEM chamber HV= 1230 HV= 1280

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Aging test(II) G=6x keV X-ray spectrum 5.9 keV X-ray: charge peak stability during irradiation 5.9 keV X-ray: peak RMS stability during irradiation G=6x years of LHCb R1-M G=6x years of LHCb R1-M1

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 iso-C 4 H 10 aging test (very preliminary) Ar/CF 4 /iso-C 4 H 10 = 65/28/7 at 1030 V – G=1x 10 4 To simulate 10 years of LHCb R1-M1, at a gain of 10 4, a charge of 6.4 C/cm 2 must be integrated ~ 5 years of LHCb R1-M1 in progress !!! HV= 1030

G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Future Plans  ASDQ thr lowering (from 5 fC to 3 fC) by means of a better LV distribution (splitter board) and then possible test at BTF (LNF)  ENEA-Casaccia test with  (1.25 MeV) from Co 60 for large area irradiation  Light version design: Module 0.1 (light honeycomb panel …)  PSI/CERN beam tests