ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel.

Slides:



Advertisements
Similar presentations
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
Advertisements

Electronics Cooling MPE 635
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma.
for a neutrinos factory
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Tracking Integration Challenges Y. meeting 2013/9/25.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ALCPG11-Peterson1 Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
T.Schneider/LHCb Muon EDR
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Beam line Experiment area SC magnet Pion production target
LEPP meeting Dan Peterson ILC highlights : Development of a TPC for the ILD detector at the ILC There are some significant differences between.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Installation of the T600 at Fermilab CSN2, September 22,
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Installation of the T600 at Fermilab
GSI, for the CBM Collaboration
Heating and radiological
Technical Design for the Mu3e Detector
Quality Control Chamber Production
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
First tests on the roll-formed field cage.
TPC Field Cage Progress Report
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
DCLL TBM Design Status, Current and future activities
TEC assembly and commissioning at Lyon
Presentation transcript:

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel –Outer field cage vessel –Inner field cage vessel Two end plates for readout

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT2 Design Objectives Provide high stability and uniformity for: Gas gain (>10 4 ):0.5% Drift field (400 V/cm):E r /E z < Temperature:  T < 0.1 ºC Drift gas purity:5 ppm O 2, 10 ppm H 2 O Provide high mechanical precision for: Central electrode:250 µm Readout plane:250 µm

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT3 Technical Progress The FC prototype has undergone intensive testing during the past two years: –Individual components (electrical, mechanical, gas) –System behavior (FC + NA35 readout chamber, cosmics & laser runs) Laboratory results certify the required performance of the FC in terms of field quality. High radiation test in CERES area: –Check stability under ‘realistic’ conditions –Exposed FC to proton and Pb beams

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT4 Test-Setup in CERES Zone

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT5 High Intensity: Proton Runs Direct exposure to proton beam: –Locally irradiated area (1-4 cm 2 ) near central electrode: Stable up to 100 kV CERES p-beam:2.5 x 10 5 /cm 2 s (3 x 10 5 with Pb target) ALICE:360/cm 2 s

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT6 High Intensity: Pb-Ion Runs Exposure to secondaries from Pb beam: –Global irradiation of entire cylinder Stable to ≤ 60 kV! CERES Pb-beam:6000/cm 2 s (secondaries) ALICE:360 /cm 2 s

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT7 Material Tests: Hygroscopy Check crucial material of field cage for hygroscopic behavior: –Kevlar (skins) –Carbon fiber (skins) –Glass fiber (skins) –Makrolon (rods) Pre-condition material Choose glass fiber instead of Kevlar Drying  L/L [µm/m] T [min] Macrolon Carbon Fiber Kevlar Fiber Glass Fiber Wet

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT8 Material Tests: Tedlar Does Tedlar provide an efficient moisture barrier? –Sandwich sample exposed to water-saturated air at 29 ºC on both sides: Maximum possible water absorption by matrix is 6% of sample weight, i.e g. After 18 days of exposure, no weight increase was observed. Reverse test is ongoing, i.e. the sandwich is placed in a 100% dry atmosphere.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT9 Problems & Risks: Material Material tests basically finished. –Kevlar fallback: glass fiber (included in tender)  Slightly cheaper  More mass (<10% of total) –Tedlar fallback: none!  Aging tests planned (≥ 1 year) –Macrolon rods replaced by ceramics?  Very expensive (material and machining)

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT10 Cooling Tests: Resistor Chain Four internal resistor chains supply the appropriate potentials to the strips. Their power consumption is 60W each. This leads to temperature gradients inside TPC of »0.1 °C. Must cool the voltage divider!

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT11 Resistor Chain: Concept Voltage divider is placed inside rod. Liquid coolants to remove waste heat. First test with water successfully finished, as proof of principle.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT12 Resistor Chain: Test-Setup The Thermal Box Resistor Rod

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT13 Resistor Chain: Results Achieve negligible temperature gradient inside rod: Pt 1Pt 2 Pt 3Pt 4Pt 5 H 2 O in H2OH2O

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT14 Resistor Cooling: Next Steps We have verified that water and silicon fluid FL 200/5 remove heat equivalent to 60 W, as expected. For HV operation, only non-polar liquids can be used: The liquid must be compatible with the rod material.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT15 Problems & Risks: Charging Understand field cage charging under high radiation load: –Examine field cage in laboratory:  Bleed 300 MBe of 83 Kr into field cage gas to simulate charged particle flux.  Separate tests for drift and insulation volume. –Increase number of guard rings. –Eventually repeat beam test.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT16 Problems & Risks: Cooling The resistor rod is a high risk item... –Choose liquid that is safe for apparatus.  No chemical decomposition, dissolution etc. –Run circuit below atmospheric pressure.  Absolutely no leaks, cracks, capillary effects! –Tight quality control. –If all fails, use gas as coolant:  Double walled cooling circuit;  Needs additional, extensive testing.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT17 Stability Study: Why? Weights [N]: Rails ITS + Vac. Ch. Services ITS and beam pipe are supported by TPC. TPC moves (!) out for ITS interventions. Deformations must not harm TPC and ITS.

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT18 FEA: Critical Area Transition from solid Al flange to laminar composite structure 1.2 MPa 8.4 MPa 4.8 MPa 10.8 MPa Equivalent shear stress (van Mises) indicates critical zone

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT19 FEA: Results Buckling: –No buckling modes induced until load is increased by a factor of ~ 60. Stresses: –The critical zone is the transition from flange to cylinder (“ovalization” under load). –Maximum shear stress in glue joint is ≤ 3 MPa (factor of 6 from failure). –Interlaminar shear stress in composite matrix is ~ 5 kPa (6% risk of delamination)

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT20 Problems & Risks: Stability Flexible joint for central drum?: Removes load from critical zone Engineering design underway Lower cost than original version ITS attached here Critical zone

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT21 Problems Related to Contracting Cylinders: –Only five offers received –Lowest offer still 3 x higher than budget End Plates: –Lowest bid exceeds budget by factor of 5 –Splitting of production processes  Separate raw material, welding and machining –Design changes Alternative scenarios require new tenders –Could lead to delays and increased risks –Avoid market surveys (6 months delay)

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT22 Future Activities R&D and prototyping continues during construction in 2001: –Entire infrastructure of field cage  Central electrode (3 options)  Strips & Rods (4 different types)  Gas distribution  Alignment –Tooling and assembly techniques  Prepare DELPHI support frame  Test facilities (gas, survey, HV, LV, readout)

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT23 Project Schedule R & DDesign & PrototypingConstruction & AssemblyPhysics Program Chronology of the TPC Project: We are here!

ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT24 Field Cage: Summary Performance –All technical issues have been studied, certifying the viability of the chosen field cage principle. Reliability –No serious risks have been identified, except..  charging at high particle flux (tests underway) Schedule is very tight due to increased in-house production load.