Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT
CURRENT EFFORTS FOR M.T.F. FINALIZE DETAILS OF FORCED COOLANT FLOW ABSORBER TO BE INSERTED INTO THE LAB G MAGNET. COORDINATE DESIGN OF THE CONVECTIVE TYPE ABSORBER FOR THE SAME LOCATION (KEK COLLABORATION). COMPLETE WINDOWS DESIGN WITH SHOP DRAWINGS FOR FABRICATION (TO BE SUBMITTED TO THE MISSISSIPPI COLLABORATION AT THE END OF THIS MEETING). INITIATE THE INTERFACE RESOLUTION OF UP & DOWN SIDE VACUUM WINDOW DESIGN REQUIREMENTS, (INCLUDING IMMEDIATE AND FUTURE EXPERIMENT PROGRAMS) START INSTRUMENTATION HARDWARE INTEGRATION DESIGN FOR THE IMMEDIATE TEST PLANS.
Edgar L. Black MAGNET, CRYOSTAT & ABSORBER LAYOUT
Edgar L. Black MTF ABSORBER FORCED FLOW
Edgar L. Black WINDOW/ ABSORBER SEAL DETAIL (SECTION OF THE MANIFOLD)
Edgar L. Black ABSORBER WINDOW DETAIL
Edgar L. Black WINDOW TEST PLATE
Edgar L. Black VACUUM VESSEL WINDOW
Edgar L. Black CURRENT EFFORTS FOR M.I.C.E. NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) NEED MORE INFORMATION ON THE PLANT FACILITIES NEED MORE INFORMATION ON THE PLANT FACILITIES
Edgar L. Black SFOFO/M.I.C.E. CONFIGURATION
Edgar L. Black M.I.C.E. SFOFO
Edgar L. Black LOCATION IN QUESTION PARTIAL VIEW OF THE R.A.L. FACILITY
Edgar L. Black LOCATION ENLARGED
Edgar L. Black FUTURE ACTIVITIES WITH TIME DURATIONS (HRS) 1-FABRICATION OF 21CM WINDOWS AND PRESSURE TEST PLATES OR 5 WINDOWS FOR EACH MATERIAL? 3 OR 5 WINDOWS FOR EACH MATERIAL? 2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE DESIGN FOR FABRICATION PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT WINDOWS AT FERMILAB SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE BURST TESTS AND TEST PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST AT N.I.U FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE TEST COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM MANIFOLD ASSEMBLY PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE ABSORBERS FLOW TEST. 160 OR SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) AND PERFORM TESTS.320