North San Jose Project. Work began on this project in 1999, completed in 2001 Work began on this project in 1999, completed in 2001 The transmission line.

Slides:



Advertisements
Similar presentations
High Voltage Braced Insulator Assemblies Design & Application
Advertisements

Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
EE 392 Stewardship Transmission Towers, Power Lines & Birds David Dukes Michael Harper.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
DESIGN OVERHEAD TRANSMISSION LINES Prepared by:- Er. Varinder Kaur
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Skilled Trades 1201 Floor Framing
Green. Clean. Wind energy. EverPower Wind Holdings, Inc.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
E4014 Construction Surveying
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
Types of Structures  Residential - Structures in which people live.  Ex. Single family houses, condominiums, and apartment complexes.  Industrial -
Russ Updike Capital Investment Manager Rocky Mountain Power
INTERNATIONAL RIGHT OF WAY ASSOCIATION | MARCH 20, 2015 STAKEHOLDER MANAGEMENT SOLUTIONS.
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Oncor Electric Delivery Company LLC Smart Grid Demonstration Project – Dynamic Line Rating (DLR) June 25, 2010 Justin Johnson ERCOT Reliability Operations.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
SOL 4.3 Electricity and Magnetism. a measure of the extra positive or negative that an object has + - charge.
The Need for Electric Transmission Improvements in Dane County.
Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement.
Public Information Presentation 1. Meeting Schedule  Town of Pleasant Valley May 07, 2014  Town of Union Vale May 08, 2014  Town of LaGrange May 21,
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Lecture 6 Development of Transmission Line Models Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Electric Current & Electric Circuits. The movement of electrically charged particles is an electric current. The SI unit for electric current is ampere.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
HeatLightSoundElectricity This is the flow of thermal energy from one object to another. Heat.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Heat, Electricity and Magnetism A Quiz. Heat flows by _______ from a warm material to a cool substance.
Electricity& Magnetism It’s electric and charged !
A PRESENTATION On 400KV GSS SURPURA JODHPUR
By Pearce, Adam, Nathan and Conor Materials We needed wire: We needed crocodile clips We needed batteries And last we needed a bulb.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
GUIDED BY: DR. NILESH CHOTHANI PREPARED BY: SEJAL SHAH( )
High Temperature Superconducting (HTS) Cable Project
Floor System Sizes and Materials
Project Costs 2016 Transmission & Distribution Benchmarking
Sub Station.
Electricity and Magnetism
Utility Needs and Smart Grid for Major Storm Events
Topic Name: INSULATORS
SUB-STATIONS.
Fencing Options for Your Grazing System
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
nSW Alignment Installation
Competency: Draw wall sections and details.
Basics of electrical engineering
Work experience presentation
AGA Workshop: Resource Management and Work Forecasting
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Natural Sciences and Technology Grade 6
Hamilton County / National Grid Meeting
Coil Fabrication Status
Presentation transcript:

North San Jose Project

Work began on this project in 1999, completed in 2001 Work began on this project in 1999, completed in 2001 The transmission line installed called the Nortech- Trimble 115 kV line is 4.6 miles long and runs between PG&Es Trimble Substation and a new PG&E Substation called Nortech Substation. The transmission line installed called the Nortech- Trimble 115 kV line is 4.6 miles long and runs between PG&Es Trimble Substation and a new PG&E Substation called Nortech Substation. The conductor is 795 kcmil ACSS/Condor (54/7) The conductor is 795 kcmil ACSS/Condor (54/7) This project added new distribution capacity in the North San Jose area to remedy the area deficiency caused by increased new construction This project added new distribution capacity in the North San Jose area to remedy the area deficiency caused by increased new construction

Why Horizontal Vee Insulators Were Chosen? Benefits of using a post insulator (no insulator swing from wind) with longer span lengths Benefits of using a post insulator (no insulator swing from wind) with longer span lengths No insulator swing means less right of way had to be acquired for the transmission line No insulator swing means less right of way had to be acquired for the transmission line During construction, area land costs were $1Million/acre During construction, area land costs were $1Million/acre Swivel post insulators used also provide tension relief between uneven spans Swivel post insulators used also provide tension relief between uneven spans

Construction Issues with Horizontal Vee Insulators Swivel post provided benefits noted previously but created a temporary problem for Construction Swivel post provided benefits noted previously but created a temporary problem for Construction Insulator assemblies provided by Sediver (MacLean Power Systems) had a pin which prevented swinging of the swivel post during installation of stringing blocks and during conductor pulling Insulator assemblies provided by Sediver (MacLean Power Systems) had a pin which prevented swinging of the swivel post during installation of stringing blocks and during conductor pulling Disadvantage listed by some manufacturers include concerns over pins not being removed during clipping and prior to the line being placed into service Disadvantage listed by some manufacturers include concerns over pins not being removed during clipping and prior to the line being placed into service

Other thoughts Line crews prefer removable pins on the swivel post type insulators Line crews prefer removable pins on the swivel post type insulators If pins are not present, crews can improvise methods to keep the insulator assembly from swinging during conductor installation If pins are not present, crews can improvise methods to keep the insulator assembly from swinging during conductor installation Pins, if provided, need to be removed prior to line being placed into service Pins, if provided, need to be removed prior to line being placed into service

North San Jose Project Existing conductor transferred to new steel poles to be used as a sock line Existing conductor transferred to new steel poles to be used as a sock line Travelers installed in preparation for sock line for new second circuit Travelers installed in preparation for sock line for new second circuit

North San Jose Project Top and remove wood pole Top and remove wood pole Note existing dual OPGW fiber optic system will remain on wood poles to be transferred after 115 kV T/Line is built Note existing dual OPGW fiber optic system will remain on wood poles to be transferred after 115 kV T/Line is built

North San Jose Project Dot com boom occurred during the permitting process Dot com boom occurred during the permitting process Horizontal Vee insulators reduced the number of structures, while reducing right of way needs for new T/Line Horizontal Vee insulators reduced the number of structures, while reducing right of way needs for new T/Line

Project had permitting challenges due to its location in close proximity to high tech building campuses Route was selected and permitting process began prior to the existence of many of the office buildings

North San Jose Project Steel pole prior to installation of insulator assembly Steel pole prior to installation of insulator assembly

Close up view of horizontal vee with swivel post insulators Close up view of horizontal vee with swivel post insulators Sediver assembly used pins to limit insulator movement during stringing Sediver assembly used pins to limit insulator movement during stringing Pins were removed after clipping was completed Pins were removed after clipping was completed

Line in service Line in service Close up view of swivel posts Close up view of swivel posts North San Jose Project

Questions/Comments