Absorber Home works RIKEN/RBRC Itaru Nakagawa. Machining MachineDepth PitchSpeed FactoryFraise0.5 ~ 2 mm 40 ~ 50 m/min Test BenchLathe1 mm78 m/min.

Slides:



Advertisements
Similar presentations
Inventory Management & Administration System Tourism suite A powerful computer software application handling carefully your inventory department activity.
Advertisements

Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
Heat treating - Plating - Powder coating. Regional Need: “Regarding … heat treating, plating and powder coating services, (we) lose a lot of bids because.
Proven Waste Gasification Technology for Circular Society
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1.
Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1.
Real-estate Management System
City Council Workshop Tuesday, July 30 th Current General Fund Budget Rent Expense$240,000 Interest Revenue$280,000 (CRA Loan) Rent Expense$240,000.
Auridos Komercijawww.forge.lt1 Company presentation 2012 AURIDOS KOMERCIJA.
Update Southend Wheelchair Service Karen Christensen.
Инвестиционный паспорт Муниципального образования «Целинский район»
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
CDA COLLEGE ACC101: BOOK KEEPING 1 Lecture 3 Lecture 3 Lecturer: Kleanthis Zisimos.
10/21/06 PragueE.Kistenev, NCC meeting NCC status report Physics case Design status Mechanics ROU’s & Front End Pad-structured Stripixel Sensors Pad-structured.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
WEEK 1 You have 10 seconds to name…
Name of Company (include company logo somewhere on this page) Your Name.
ADAMS Assignment 2 ME451:Kinematics and Dynamics of Machine Systems (Spring 09)
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
2010 Global Forecasting Conference National Tooling & Machining Association.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Stainless steel 316 CNMG MF 2025 C5-PCLNL HP 3,0 1,5 1,0 0,5 0,25 0,10,15 0,20,25 0,30,350,40,5 1 v c 180 m/min Coolant pressure 7 bar Feed.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
By Edwin.  Height= 1.54m 154cm  Length of arm= 40cm 400mm  Length of leg= 60cm 600mm  Length of foot= 25cm 250mm  Width of foot= 3cm 30mm  Circumference.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
The reading is 7.38 mm. The reading is 7.72 mm.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Gonzales Iron Works Custom Steel Awnings Austin TX
Gonzales Iron Works Custom Metal Fabrication Austin TX
MGT 521 Week 1 Summary To purchase this material link 521/MGT-521-Week-1-Summary For more details visit
MGT 420 Week 4 DQ 2 What are some areas of a company adversely affected when switching suppliers? How would altering suppliers affect the different areas.
FIN 324 Week 5 DQ 5 Does an organization receive money when its stock is traded in the secondary market? To purchase this material click below link
PSY 428 Week 1 Summary To purchase this material click on below link 428/PSY-428-Week-1-Summary For more classes visit.
PSY 428 Week 2 Summary To purchase this material click on below link 428/PSY-428-Week-2-Summary For more classes visit.
PSY 428 Week 3 Summary To purchase this material click on below link 428/PSY-428-Week-3-Summary For more classes visit.
PSY 428 Week 4 Summary To purchase this material click on below link 428/PSY-428-Week-4-Summary For more classes visit.
PSY 428 Week 5 Summary To purchase this material click on below link 428/PSY-428-Week-5-Summary For more classes visit.
IT 242 Week 6 CheckPoint Static or Dynamic To purchase this material link CheckPoint-Static-or-Dynamic.
LDR 300 Week 1 Summary To purchase this material link 300/LDR-300-Week-1-Summary For more courses visit our website.
LDR 300 Week 2 Summary To purchase this material link 300/LDR-300-Week-2-Summary For more courses visit our website.
LDR 300 Week 3 Summary To purchase this material link 300/LDR-300-Week-3-Summary For more courses visit our website.
LDR 300 Week 4 Summary To purchase this material link 300/LDR-300-Week-4-Summary For more courses visit our website.
LDR 531 Week 1 Summary To purchase this material click on below link 531/LDR-531-Week-1-Summary For more details
LDR 531 Week 2 Summary To purchase this material click on below link 531/LDR-531-Week-2-Summary LDR 531 Week 2 Summary.
LDR 531 Week 4 Summary To purchase this material click on below link 531/LDR-531-Week-4-Summary LDR 531 Week 4 Summary.
LDR 531 Week 5 Summary To purchase this material click on below link R-531/LDR-531-Week-5-Summary For more details
LDR 531 Week 6 Summary To purchase this material click on below link 531/LDR-531-Week-6-Summary For more details
ACC 422 Week 1 Summary To purchase this material click 422/ACC-422-Week-1-Summary For more classes visit
ACC 422 Week 2 Summary To purchase this material click 422-Week-2-Summary For more classes visit
ACC 422 Week 3 Summary To purchase this material click 422/ACC-422-Week-3-Summary For more classes visit
ACC 422 Week 4 Summary To purchase this material click 422-Week-4-Summary For more classes visit
ACC 423 Week 1 DQ 1 Why do companies offer stock options? What is the experience of either your organization or an organization that you are familiar with.
ACC 291 Week 3 DQ 2 Why do corporations buy back their own stock? What does it tell you about the corporation? What effect does the purchase have on the.
Status on INTT bus extender R&D
How to make a data table Learning Target Goal:
Linear Programming – A First Example
الجوانب القانونية لاعسار الشركات الصغيرة التجربة البريطانية.
A COMMITMENT TO SMART MANUFACTURING
شركات المساهمة​ (corporations) Joint stock company
LTNA Samples Returned 03/12/2018 Supplier DUoS MPRNs
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Capital budgeting Example: Forge Investment Co.

STEEL PLATES.
Reading Stock Quotes Investing Part 2
Presentation transcript:

Absorber Home works RIKEN/RBRC Itaru Nakagawa

Machining MachineDepth PitchSpeed FactoryFraise0.5 ~ 2 mm 40 ~ 50 m/min Test BenchLathe1 mm78 m/min.

B-Field Measurement B=500Gauss probe B=500Gauss probe Before machining After machining  d=0.1mm Pitch  r=0.1mm Pitch

Measured Results SUS303w/o samplew sampleSUS304w/o samplew/ samle Before Before Average After Average After Average Average

Material (SUS310) Supplier Metal Plate [mm]ProductionQuoteDelivery [week] Daido Steel Co.350 t mm (1body) Forging (1layer) $252k12 weeks Nippon Yakin Co. via TIME 50 t x1200x4000 (4) 45 t x1200x3300(4) Plate (8layers) $144k weeks Shima Metals50 t ×1170×2340 (14) Plates (7layers) $157k ($9.1/kg) 8 – 10 weeks Fuji Kogyo (via Giken) 210 t x1120x1120 (4) 180 t x987x987 (4) Forging (2layers) $320k4 weeks 70tPlatesNext week NAS Trading Co.50 t ×1170×2340 (28)Plates10 weeks 5 Very likely no stock available. Need to produce. Production ~ 1 week. Waiting > 7 weeks.

Summary for Both Arms Case-1CompanyCostDelivery MaterialShima Kogyo$270k8 – 10 weeks MachiningYagishita Giken$23.5k x 2?4 weeks minmum ShippingMaruwn$4.65k4 – 5 weeks Total$300+k15 – 18 weeks 6 Case-2CompanyCostDelivery MaterialNippon Yakin$252k weeks MachiningTIME$45k weeks ShippingMaruwn$4.65k4 – 5 weeks Total$300k15 + weeks Yagishita has only 2 machine centers, while TIME has 5.

SUS t mm? Plates are in stock. Confirmed for one arm amount by Inoue Material. They can get plates within 2 weeks.

Budget Transfer Issue

Scenario 1 UIUC RIKEN BNL REPIC Bid REPIC Company A Material ~$300k $50k $250k$100k Company B Machining ~$50k Can BNL/UIUC issue a purchase order to REPIC w/o bidding? Absorber Project

Scenario 2 UIUC RIKEN BNL Bid Company A Material ~$300k $50k $250k$100k Company B Machining ~$50k Project C Project B RIKEN Administration Absorber Project

Scenario 3 UIUC RIKEN BNL Bid Company A Material ~$300k $50k $250k$100k Company B Machining ~$50k Absorber Project

Construction in US

Scenario 1 UIUC RIKEN BNL Bid REPIC $50k$250k $100k Company B Bid Bid in JapanNorth arm South arm