OMS 101 How to survive implementing a new Outage Management System Dave Blew Public Service Electric & Gas Newark, NJ.

Slides:



Advertisements
Similar presentations
MILSOFT UTILITY SOLUTIONS
Advertisements

Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Multispeak, OMS, & Customer Service – What’s the link?
A Path breaking Technology for Network Maintenance and Optimization
Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.
1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support
Electrical Installation-Module 3
PSE&G Condition-Based Maintenance
Platinum Sponsors Titanium Sponsors.  FortisAlberta is Power Distribution company, responsible for 520,000 residential, farm and business customers.
Integrating Automated Metering Infrastructure (AMI) with GIS to Predict Electrical Outages Allen Cousins – Senior GIS Analyst.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Office of Electricity Delivery & Energy Reliability The Impact of Smart Grid Projects Funded by the Recovery Act of 2009 Joe Paladino US Department of.
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
AMR/MMR And Tamper Detection Alan Chapman SCRPA/SURPA/IURPA Conference Atlanta, GA June 18 – 21, 2002.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Network Design and Implementation
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Ed Gray, PE Public Service Electric and Gas
Fully Implemented GIS/WMS/Outage System May 2004.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Distribution Management System Implementation at Florida Power & Light
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
Solar Metering and Performance Monitoring Exposition June 4, 2007.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Why Make NJ Energy Strong? Sandy, Hurricane Irene and the October 2011 snow storm represent extreme weather patterns that may become commonplace. For.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Managing A Migration Project Neil Phinney EMS Users Group June 7, 1999.
AEP’s “gridSMART” Project Ohio Roll Out Strategy PUCO Staff Workshop December 13, 2007.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
PowerOn Implementation AEP Texas DDC SWEDE AEP Texas DDC Thirty-one Dispatchers Serve: Thirty-one Dispatchers Serve: – 850,000 Customers – 97,000.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
Utility Engineers, PC.  Generation  Transmission  Distribution.
The Power Of Greater Nashville T&D Planning at Nashville Electric Service Paul H. Allen, Nashville Electric Service APPA E&O Technical Conference.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Outage Management System
1 Proposed Performance Tracker for PSC Working Group 1 of 3 CategoryMetricResults Project Costs Cost to Deploy: Capital vs total Capital deployment cost.
Utility Needs and Smart Grid for Major Storm Events
Florida Public Service Commission
Advanced Distribution System Management and Enterprise Engineering & Operations Wayne Carr -- Milsoft.
TxMAG presentation
Electricity.
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Presentation transcript:

OMS 101 How to survive implementing a new Outage Management System Dave Blew Public Service Electric & Gas Newark, NJ

PSE&G 1.9 million electric customers 1.9 million electric customers System peak 9,500 MW System peak 9,500 MW 4 operating divisions along corridor from New York to Philadelphia 4 operating divisions along corridor from New York to Philadelphia 1,400 square miles 1,400 square miles 75% of population 75% of population 2,317 distribution circuits (4/13kV) 2,317 distribution circuits (4/13kV) 540 sub-transmission circuits (26/69kV) 540 sub-transmission circuits (26/69kV)

OMS Products Installed Major components from M3i Major components from M3i Call Management (Pragma Up) Call Management (Pragma Up) Connected Circuit Model (Pragma Line) Connected Circuit Model (Pragma Line) Switching (Pragma Switch) Switching (Pragma Switch) Dispatching (Pragma CAD) Dispatching (Pragma CAD) Reporting (Pragma Proof) Reporting (Pragma Proof) Remote Use (Pragma Web) Remote Use (Pragma Web)

Contractors M3i – OMS application (Montreal, Quebec) M3i – OMS application (Montreal, Quebec) ESRI – GIS vendor (Redlands, CA) ESRI – GIS vendor (Redlands, CA) Minor & Minor - application developer Minor & Minor - application developer ASI - data conversion ASI - data conversion CAI – CIS interface CAI – CIS interface DAQ – SCADA interface DAQ – SCADA interface COE – Change management contractor COE – Change management contractor Performance Edge – training materials Performance Edge – training materials Walkabout – Mobile Data Terminals (MDTs) Walkabout – Mobile Data Terminals (MDTs) Verizon – CDPD RF service to MDTs Verizon – CDPD RF service to MDTs

Benefits Improved operations and dispatching Improved operations and dispatching Less paperwork - direct feed from CIS Less paperwork - direct feed from CIS Better information back to customer Better information back to customer More details on each outage event More details on each outage event Improved storm management Improved storm management Graphical data display Graphical data display

Critical Issues Project scope Project scope Resource drain Resource drain Connected Model completion Connected Model completion Transition period Transition period Expectations of senior management Expectations of senior management Training (do not short change) Training (do not short change) Implementing at the same time as NJ BPU releases formal reliability standards Implementing at the same time as NJ BPU releases formal reliability standards

Recommendations Get the connected model right Get the connected model right Set expectations of executives early on Set expectations of executives early on Plan for transition period Plan for transition period Do not under estimate stake holder management all throughout project Do not under estimate stake holder management all throughout project

Questions