MEASUREMENT PLAN SOFTWARE MEASUREMENT & ANALYSIS Team Assignment 15

Slides:



Advertisements
Similar presentations
SharePoint Project Management. EPM Live provides Microsoft-Base Project Management solutions that allow individuals, teams, workgroups, and organizations.
Advertisements

MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
W5HH Principle As applied to Software Projects
Practical Uses of Software Measurement for Process Improvement January 10, V1.0 Larry Dribin, Ph.D
ICS Management Poor management is the downfall of many software projects Software project management is different from other engineering management.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
project management office(PMO)
Deriving Performance Metrics From Project Plans to Provide KPIs for Management Information Primavera SIG October 2013.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Planning. SDLC Planning Analysis Design Implementation.
, TargetProcesswww.targetprocess.com1 TargetProcess:Suite Agile Project Management System Powers iterative development Focuses on Project Planning,
Database Software Application
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Office of Project Management Metrics Report Presentation
Team assignment 13 TEAM 3 – K15T1 Hanh Luong – Leader – T Hao Tran – T Huy Nguyen – T Hieu Le – T Quang Nguyen – T
What is Business Analysis Planning & Monitoring?
The Microsoft Office 2007 Enterprise Project Management Solution:
Copyright Course Technology 1999
Ihr Logo Data Explorer - A data profiling tool. Your Logo Agenda  Introduction  Existing System  Limitations of Existing System  Proposed Solution.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Software Quality Assurance Activities
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
Team Assignment 15 Team 04 Class K15T2. Agenda 1. Introduction 2. Measurement process 3. GQM 4. Strength Weakness of metrics.
Week 2 Seminar: Project Scope Management
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
© Copyright 2011 John Wiley & Sons, Inc.
© 1998 Carnegie Mellon UniversityTutorial The Personal Software Process (PSP) The overview of the PSP that follows has been built from material made.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Georgia Institute of Technology CS 4320 Fall 2003.
Microsoft Access Database Software.
LOGO Team Assignment 1 Software Architectures. LOGO K15T2- Group21 Contents Introduce to Sale system 1 Architecture Drivers 2 Minimal Acceptable Delivery.
Company LOGO Team assignment 03 Team 04 K15T02. Members… 1.Hoàng Thị Kim Dâng 2.Thái Thanh Nhã 3.Trần Thị Mộng Hà 4.Trần Tiễn Hưng 5.Chu Thị Thu Hương.
Using REDCap (Research Electronic Data Capture) as a tool to perform research studies Abstract ID no. IRIA-1076.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
K15T2-Team 5- PoD Team Software Project Management.
Team X Review. The members of Team X propose to develop a therapeutic activity system using a Microsoft Surface unit and a Windows 7 desktop. By working.
@ Faculty of Information Technology, UNS, 2008 TRACKING PROGRESS Nguyễn Hoàng Anh
Project Management Training
Software Testing Process
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Session 6: Data Flow, Data Management, and Data Quality.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Information Technology Project Management, Seventh Edition.
Learning Management System. Introduction Software application or Web-based technology used to plan, implement, and assess a specific learning process.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
July 27, Brain Works Consulting, LLC 1.
Project Management The much neglected art of running a project to a successful completion 15/07/2016(C) Management Expert Academy1.
Project Planning: Scope and the Work Breakdown Structure
The Five Secrets of Project Scheduling A PMO Approach
4.4 Monitor and Control Project Work
IT Project Management Version IT Industry Apprenticeship System
TechStambha PMP Certification Training
Software Documentation
MTM Tools key to running
Program Control Services – Overview
Project Management Process Groups
Fertilizer Industry Safety Information Analysis and Sharing Program
Presentation transcript:

MEASUREMENT PLAN SOFTWARE MEASUREMENT & ANALYSIS Team Assignment 15 K15T2-Team 21

Content Introduction Management Goals and Sub-goals Metrics Purpose Scope References Overview Management Goals and Sub-goals Metrics Human Resources Information on team implement measurement Training plan Roles and responsibilities Environment Tool Software Measurement Databases

Introduction Purpose Today, software projects are notorious for running over schedule and budget, yet still having quality problems. Software measurement lets manager quantify schedule, work effort, product size, project status, and quality performance. If software project don’t measure current performance and use the data to improve future work estimates, those estimates will just be guesses. Because today’s current data becomes tomorrow’s historical data, it’s never too late to start recording key information about software project.

Introduction Scope Measurements Plan will be conducted for the project implementation Viking Project. In the process of performance measurement, those responsible need to make the data collection environment easily, without causing resistance to certain objects to collect. Data after collection should be stored as a basis for comparison and analysis during project development. So, all these data will be stored in the historical data of the company ABC. And besides that, the application of measurement on the Viking project is also a precondition for the experiment to proceed to apply to all future projects of the company ABC.

Introduction Documents references Description Viking_Project_Charter.pdf Will give the reader an overview of the Viking project. Includes: Project Description, Project Scope, Project stakeholders. Viking_Project_Plan_1.0.pdf Will give the reader an overview of strategy development and management Viking project. Through it, readers will also see the problem of measurement is an essential component will be implemented during project development. Viking_URD_V1.0.pdf The objective of the document is to capture the understanding of customer requirements for the Viking product.

Introduction Overview As a planning document given to the measurement process for the Viking project. So it needs to be updated and adjusted as the plan, and personnel work described in this document does not meet the objectives. When a change occurs, the person responsible for measuring the need to assign personnel to conduct Measurements Plan update quickly.

Management Goals and Sub-goals To start measuring, the personnel responsible for the roads will select a small and balanced set of metrics that will help your organization track progress toward its goals. Therefore, in the Viking project will be applied methods Goal-Question-Metric (GQM). This is an excellent technique for selecting appropriate metrics to meet your needs. With GQM, you begin by selecting a few project or organizational goals.

Management Goals and Sub-goals State the goals to be as quantitative and measurable include things like: Reduce maintenance costs by 50% within one year Improve schedule estimation accuracy to within 10% of actual Reduce system testing time by three weeks on the next project Reduce the time to close a defect by 40% within three months Reduce product schedule by 10% Improve productivity by 10%

Management Goals and Sub-goals State the goals to be as quantitative and measurable include things like: Reduce project costs by 10% Improve product quality by 10% Reduce project risk by 10% Reduce product change by 10% Improve customer satisfaction by 10% Increase team morale by 10% Reduce defects found by system test by 10% Increase project schedule predictability by 10%

Metrics In this section of document, enumerate the metrics that are to be synthesized at regular intervals on the project to support the goals.

Human Resources The group will include measurement of 6 persons. Information on team implement measurement The group will include measurement of 6 persons. Lead measurement: An Ha Team members: Tho Nguyen, Duc Nguyen, Hoang Tran Document writer: Quyen Thoi , Tuan Lai

Training plan Information on team implement measurement To apply an independent process with an independent group to conduct performance measurement project. Should teams require training measure some knowledge and skills when collecting and analyzing data.

Training plan Roles and responsibilities Lead measurement: responsible for distribution of tasks, instructions, plans and track progress of the work group's measure. Directly reporting to senior personnel and project managers. Team members: make the process of developing environmental measurement, data collection, analysis reporting and offer comments with the recommendation made ​​during the measurement. Reporting directly to the chief measure. Document writer: responsible for development of the document line (table of measurement plans, statistical reports, documents reporting standards, design the report template .....).

Environment To meet the objectives set out, and also to meet the data collection was conducted more convenient. Expected measurement group will proceed to develop a dashboard using free online tools and Microsoft's MS Office.

Environment Tool To make dashboard (paper or real) for ABC Systems group has Google’s online tools such as Google Docs, Google Driver, Google Sites and MS Word, MS Excel. Connect to Data - connect to data, join tables, extract data, and manage queries. Building Data Views - drag and drop fields to create views of your data, then refine the view. Advanced Analysis - create custom fields, use the built in statistical tools, add maps, and more. Publishing and Sharing - format and annotate the view, then export or publish it to share with others.

Environment Software design document Microsoft project 2010 Microsoft office 2010 (word, excel)

Environment Measurement Databases All measurement results should be stored in the database of the Viking project and the company ABC. So, all the materials collected based online tools Online to Offline to be converted to storage performance. The document will be delivered during the performance measurement: # Title of document 1 Viking Project Measurement Plan 2 Viking Earned Value 3 Viking Project Team Morale Survey Data 4 Viking Customer Satisfaction Survey Data 5 Team productivity

Thank YOU SOFTWARE MEASUREMENT & ANALYSIS Team Assignment 15 K15T2-Team 21