June 2006 Middle Fork Project Project Maintenance June 20, 2006.

Slides:



Advertisements
Similar presentations
Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
Advertisements

What are Ecosystem Services? Goods and life supporting services provided by natural ecosystem. Goods timber fisheries pharmaceuticals Services pollination.
Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
May Middle Fork Project Project Operations Overview May 2006 PCWA MAY 16, 2006 HANDOUT #4.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
HUNTINGTON CREEK RECOVERY PROJECT. On June 26, 2012 a lightning strike started the Seeley Fire in Emery County. The fire burned 48,050 acres, of which.
Nineteen Years later…. Lessons learnt from Kantale Breach D W R Weerakoon Former Director General of Irrigation.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Yards Creek Rotor Poles
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
The Mission Reach Ecosystem Restoration Project: Floodplain Management Within a Multi-Objective Project Paradigm Steven Schauer San Antonio River Authority.
NJDEP Maintenance Guidance for Stormwater Management
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
June 26, PCWA - Middle Fork Project Project Operations
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
RFB MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.
Hydro electric (Hydel) Power Plant
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Terrestrial Resources Working Group June 3, 2008.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Insert image in the space below, resize image to fill space as much as possible. Natural & man-made fish passage barriers.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting May 29, 2008.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
Middle Fork Project Potential Project Betterments October 1, 2007.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Head works.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.
Maintenance of Structures Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Part 5 - Good Housekeeping
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
1. A generating station which utilized the potential energy of water at a high level for the generation of the electrical energy is known as a hydro-electric.
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
A roof is an essential component of any building. It is the roof that protects the building from extreme climates such as rain, snowfall and wind. It.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
CEDAR SPRINGS DAM IMPROVEMENTS
SUE «Tochikobloikhakashi»
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Middle Fork Project Project Description and Operations Maps
The Journey of Hydropower in Snohomish County
Jason Throneberry Aquatic Ecologist.
Project focus areas FY20+ Potential contract opportunities
Presentation transcript:

June 2006 Middle Fork Project Project Maintenance June 20, 2006

1 June 2006 MFP Maintenance Summary Three General Categories:  Unplanned Outage for Repair and Maintenance;  Planned Major Outages; and  Routine Maintenance.

2 June 2006 MFP - Maintenance Unplanned Outage for Repair and Maintenance Hell Hole - Middle Fork Tunnel Collapse Hell Hole - Middle Fork Tunnel Collapse Middle Fork Powerhouse Transformer Failures Middle Fork Powerhouse Transformer Failures Repair Damage from High Flows Repair Damage from High Flows

3 June 2006 MFP - Maintenance Planned Major Outages Generator Rewinds Generator Rewinds Pelton-Wheel Replacement Pelton-Wheel Replacement Runner Replacement Runner Replacement Hell Hole - Middle Fork Tunnel Surge Shaft Repair Hell Hole - Middle Fork Tunnel Surge Shaft Repair

4 June 2006 MFP - Maintenance Annual or Periodic Maintenance Tunnel Inspection Tunnel Inspection  Ralston - Oxbow  Hell Hole Dam Outlet Conduit Facility Testing and Maintenance Facility Testing and Maintenance  Powerhouse Inspection / Testing  Gate / Valve Testing

5 June 2006 MFP - Maintenance Debris Removal at Reservoirs & Diversions Removal of Debris at Hell Hole, Interbay and Ralston Spillways Removal of Debris at Hell Hole, Interbay and Ralston Spillways Trashracks cleared at Diversions, Tunnel Inlets in Middle Fork Interbay and Ralston Afterbay Trashracks cleared at Diversions, Tunnel Inlets in Middle Fork Interbay and Ralston Afterbay Log Booms at all Reservoirs and Duncan Creek Diversion Log Booms at all Reservoirs and Duncan Creek Diversion

6 June 2006 MFP - Maintenance Sediment Management Removal with Mechanical Equipment Removal with Mechanical Equipment Hydraulic Sluicing (prior to 1976) Hydraulic Sluicing (prior to 1976) Slope Fencing Slope Fencing Slope Protection with Gunite Slope Protection with Gunite Sediment Management Pilot Project * Sediment Management Pilot Project *

7 June 2006 MFP - Maintenance General Facility Maintenance Vegetation - Hand Trimming and Herbicides Vegetation - Hand Trimming and Herbicides Pest Management - Rodenticide Pest Management - Rodenticide Gravel Replacement Gravel Replacement Painting Painting Pole Replacement - Power and Communication Lines Pole Replacement - Power and Communication Lines

8 June 2006 MFP - Maintenance Project Road and Trail Maintenance Annual - Vegetation Trimming Annual - Vegetation Trimming As-needed As-needed  Grading and Restore Road Surface  Repair and Restore Drainage Structures  Maintain Signs and Gates  Snow Removal

9 June 2006 MFP - Maintenance Project Recreation Facility Maintenance Performed by the USDA-FS under agreement with PCWA Vegetation Trimming Vegetation Trimming Facility Painting/Repair Facility Painting/Repair Fungicide Application Fungicide Application