Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities.

Slides:



Advertisements
Similar presentations
Winnipegs Water Infrastructure How water gets from the Shoal Lake Aqueduct to our taps.
Advertisements

Dealing with High Water Age in a Water Distribution System Dan Barr, PE Ohio AWWA Southeast District Fall Meeting Thursday, November 21, 2013.
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
City of Black Hawk Water HammerSeptember 2002 Arber Water Hammer Travis Meyer, P.E. Richard P. Arber Associates.
STEAM TRAPS.
CAFS On-Line Orientation
Booster System Basics: Constant Speed Systems
GENERAL IDEAS IN AIR POLLUTION CONTROL
© Water Systems Optimization, Inc TAUD Utility Technology Conference Frequently Asked Questions in Leak detection, Distribution System Testing.
Diesel Generator Reliability: Lessons Learned from Storms
Supply Chain Operations: Making and Delivering
Presentation on City of Westminster Water System Pressures May 1, 2013.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
CE HYDRAULICS ENGINEERING
C L A S #4 Driver Operator Refresher Training.
Task Force-7 Engine 14 Engine 13 Batt. 2
Coliform Event Recommendations and Best Management Practices Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
-P&ID- Piping & Instrument Diagram
Hydronic Mechanical Controls
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Learning Objective 1 Explain the ways water supply system components are used by firefighters.
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Improving Service to Customers by Decommissioning an Elevated Water Storage Tank Jon C. Ford P.E. – Seattle Public Utilities AWWA-PNWS Conference April.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Discrete Event Simulation in Automotive Final Process System Vishvas Patel John Ma Throughput Analysis & Simulations General Motors 1999 Centerpoint Parkway.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
ISO OPERATIONAL CONTROL
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
Recycled Water Distribution System Challenges Lee Cesario, P. E. Denver Water
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
Risk management and disaster preparedness
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Fault Tree Analysis Part 4: Digraph-Based Fault Tree Synthesis Procedure (NFFL and Lapp-Powers Algorithm)
Firefighter III Module B Water Supply (4-19) (4-19)
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Commissioning HVAC Systems: Lessons learned throughout
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Water supply definitions Water supply definitions Four Basic components of a water supply system Four Basic components of a water supply system Methods.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Fault Tree Analysis for Fatality Prevention Dr. Steven A. Lapp President - Design Sciences, Inc.
Water Shuttle Operations
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Relay Pumping Operations Sugar Land Fire Department Driver/Operator-Pumper Academy Spring 2003.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 4G Ordinance No. 662-C; Revise the City of Southlake’s Drought Contingency.
Water System Infrastructure
Workshop developed by RCAP/AWWA and funded by the USEPA
CE 3372 Water Systems design
Dual Pumping Definition: An operation where a strong hydrant is used to supply two Engines by connecting the Engines intake-to-intake. The second Engine.
CTC 450 Review Water Processes.
Developing Information Systems
Sprint Planning April 2018.
Technician’s Guide and Workbook for Zoning Section 1: Introduction
Treatment – Plant Design
Charge 2. Equipment Protection 3. Definition and Documentation
Piping and Instrumentation for Process Industries
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Presentation transcript:

Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities

Why Include Operators and Maintenance Staff? Incorporating their knowledge makes a project more successful. Better integration of project with existing system Better integration of project with existing system Reduces the amount of work re-done by O&M staff once project is closed Reduces the amount of work re-done by O&M staff once project is closed Potential reduction in CIP & O&M costs Potential reduction in CIP & O&M costs

What Kind of O&M Staff? System Knowledge System Knowledge Detail-Oriented Detail-Oriented Ones who notice subtle changes or discrepancies in data Ones who notice subtle changes or discrepancies in data Inquisitive Inquisitive Ones who ask why Ones who ask why Analytical & Persistent Analytical & Persistent Ones who figure out why Ones who figure out why Bill Nye

What Should They Know About?

Infrastructure Trouble Spots That’s pretty soggy ground for a flex coupling… That’s pretty soggy ground for a flex coupling… We need another isolation valve; that one’s awfully close to the excavation zone. We need another isolation valve; that one’s awfully close to the excavation zone. That 80-year-old valve hung up last week at 30% open... That 80-year-old valve hung up last week at 30% open...

Infrastructure Trouble Spots It’s 80 psi down there and most of those gate valves leak – we should replace them when we reline….. It’s 80 psi down there and most of those gate valves leak – we should replace them when we reline…..

O&M Practices & History Why this way? Why this way? Staffing levels Staffing levels How long it takes How long it takes Constraints Constraints Why it’s done How it’s done

Instrumentation & Control Needs Identify desired level of I&C and automation Identify what’s appropriate for the operator’s level of accountability Ed Harris as Gene Kranz in Apollo 13

System Water Quality Knows normal and seasonal variations Knows normal and seasonal variations Good, bad or normal?

System Water Quality Can identify probable impacts of events or changes in operation Can identify probable impacts of events or changes in operation Four impacts that can result from high velocities are...

Their Perspective

How Will It Work? Will the design allow the project to function as required? Will the design allow the project to function as required? How will the project change the way my system operates? Is that acceptable? How will the project change the way my system operates? Is that acceptable?

To bring it on line To bring it on line To operate it To operate it To maintain it To maintain it What Will It Take to Make It Work?

What Happens With Pieces Out For O&M? What Happens With Pieces Out For O&M? An automated pump station starts when pressure drops below 90 psi. The gauge needs to be replaced. It is isolated, causing the input to the PLC to drop out. Does the PLC 1)interpret the missing point as a valid reading <90 psi & start a pump? 2)flag the data as invalid and hold last valid status? 3)have a manual over-ride or bypass mode?

Worst-Case Scenario What could go wrong? What could go wrong? How hard would it be to rectify? How hard would it be to rectify? How long will it take? How long will it take? Is it even a big deal? Is it even a big deal?

What Can O&M Staff Do For You?

Pre-Design Functional Requirements Analysis Functional Requirements Analysis For the project For the project For system during construction For system during construction For start-up & commissioning For start-up & commissioning For O&M For O&M

Pre-Design Draft shutdown & start-up plans Draft shutdown & start-up plans Draft a pressure zone or system operating plan for the construction period Draft a pressure zone or system operating plan for the construction period Identify bypass needs & constraints imposed by the loss of the facility Identify bypass needs & constraints imposed by the loss of the facility Identify major system maintenance that should be done prior to NTP Identify major system maintenance that should be done prior to NTP

Zone Base Map Boundaries Storage Supply Major Feeders Shut Down Valves Primary Backup

Zone Map for Backup Inlet Shutdown Zone Map for Backup Inlet Shutdown South end isolated, needs new relief point South end isolated, needs new relief point South end PS has reduced service area, throttling capability on discharge needed South end PS has reduced service area, throttling capability on discharge needed

De-Watering Identify blowoff points Calculate volumes If the whole thing sits for a month, can I disinfect & flush the required volume? Requires either a short-term shutdown or a new isolation valve before the reservoir is demolished.

Why Do This During Pre-Design? The answers to these questions will identify whether there are elements that need to be incorporated into the design. The answers to these questions will identify whether there are elements that need to be incorporated into the design. Is a new isolation valve required? Is a new isolation valve required? Are air valves, blow-offs and sample points where they are needed? Are air valves, blow-offs and sample points where they are needed? Is a specific construction sequence required? Is a specific construction sequence required?

Challenges of Replacement Projects Capacity reduction may require bypass Capacity reduction may require bypass Connecting new to old may be difficult Connecting new to old may be difficult Old valves leak or break easily Old valves leak or break easily Disturbing old pipe or bedding may cause leaks Disturbing old pipe or bedding may cause leaks Long, large dead ends for extended periods Long, large dead ends for extended periods Flushing, disinfection, no sample points Flushing, disinfection, no sample points

Sequencing Multiple Shutdowns Maintaining service & fire flows Maintaining service & fire flows How many blocks to the nearest hydrant? How many blocks to the nearest hydrant? How many streets in a row on temporary? How many streets in a row on temporary? Diurnal & seasonal demand Diurnal & seasonal demand What happens to your shutdown if you have to back up another valve? What happens to your shutdown if you have to back up another valve?

Pre-Design Draft O&M review checklists Draft O&M review checklists Do this early and give them to the designers so they know what you’ll be looking for. Do this early and give them to the designers so they know what you’ll be looking for.

Design Review Include O&M staff at all stages of review. Include O&M staff at all stages of review. As design becomes more refined, their review becomes more specific & focused on how they will operate & maintain project. As design becomes more refined, their review becomes more specific & focused on how they will operate & maintain project. If items are deleted, include O&M staff in the decision-making process. If items are deleted, include O&M staff in the decision-making process. Reduction in CIP $ frequently means increase in O&M. Make sure your staff can handle what you’re committing them to. Reduction in CIP $ frequently means increase in O&M. Make sure your staff can handle what you’re committing them to.

Start-up & Commissioning Acceptance Testing (Not the manufacturer’s & contractor’s equipment testing & commissioning) Acceptance Testing (Not the manufacturer’s & contractor’s equipment testing & commissioning) Does the project work with your whole system like it’s supposed to? Does the project work with your whole system like it’s supposed to? Documentation Documentation Test results/findings Test results/findings Operating procedures Operating procedures

Post-Implementation Go back & talk to the O&M staff Go back & talk to the O&M staff What’s working well? What’s working well? What’s been changed? Why? What’s been changed? Why? What would they do differently next time? What would they do differently next time?

Questions?