Gusev Konstantin, Kurchatov Institute / JINR 09.11.2005, Gerda meeting Some technical aspects of testing and adaptation of existing detectors.

Slides:



Advertisements
Similar presentations
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Advertisements

A/C Generator Systems.
Labyrinth seal into two halves
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Progress of TG-1 activities (refurbishment of Phase-I detectors) Stefan Schönert on behalf of TG 1 GERDA general meeting Tuebingen, Nov. 9-11, 2005.
GERDA: GERmanium Detector Array
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Platzhalter Bild Vacuum Transfer System for loading the Sartorius Prototype Mass Comparator CCL1007 Thomas Fehling, NCSLI-Conference, Washington D.C.,
A/C testing and service. Before testing and service, technician must be certified by ASE, MACS, or IMACA.
Temperature-Dependent Transient Capacitance in InGaAs/InP-based Diodes Kiril Simov and Tim Gfroerer Davidson College Mark Wanlass NREL Supported by the.
Solar Cell conductive grid and back contact
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
Gas Chromatography Carrier Gas Flow Control Injector Port Column Column Oven Detector Recorder The GC system consists of gas supplies for the mobile phase.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
Lee, Myeong Jae DMRC, Seoul national university
Temperature Dependence of the Crystal Properties of 18-fold Segmented HPGe Detector Allen Caldwell, Daniel Lenz, Jing Liu, Xiang Liu, Bela Majorovits,
Task Group 2 Iris Abt, Michael Altmann, Kevin Kroeninger, Bela Majorovits, Franz Stelzer, Xiang Liu 1.Detector Development 2.Suspension & Cabling 3.MC.
GERMANIUM GAMMA -RAY DETECTORS BY BAYAN YOUSEF JARADAT Phys.641 Nuclear Physics 1 First Semester 2010/2011 PROF. NIDAL ERSHAIDAT.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
th KPS meeting 1 Development of Radon Monitoring Detector for the KIMS Experiment Lee, Myoung Jae DMRC, Seoul national university.
1 A/C Pressure Test and Evacuation. 2 Leak Detection Leak detection must be done after every repair job. It must also be done anytime the appliance can.
Stefano Pirro, IDEA Meeting -Zaragoza November 7, Nd Project High Temperature Thermistors News about NdGaO 3 Scintillating Bolometers Conclusions.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
SILICON DETECTORS PART I Characteristics on semiconductors.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
I.C. ENGINES LECTURE NO: 08 (24 Mar, 2014). Combustion Formulas Combustion is a chemical reaction in which certain elements of the fuel combined with.
Heavy ion irradiation on silicon strip sensors for GLAST & Radiation hardening of silicon strip sensors S.Yoshida, K.Yamanaka, T.Ohsugi, H.Masuda T.Mizuno,
Measurement of Ge detector by New cooling system KEK May 30 th K.Shirotori.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Machine Tools And Devices For Special Technologies Ion beam machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Experiment TGV II Multi-detector HPGe telescopic spectrometer for the study of double beta processes of 106 Cd and 48 Ca For TGV collaboration: JINR Dubna,
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
Cracow Epiphany Conference on Physics in Underground Laboratories and its Connection with LHC Cracow, Poland The GERDA Experiment at Gran.
BACKGROUND REJECTION AND SENSITIVITY FOR NEW GENERATION Ge DETECTORS EXPERIMENTS. Héctor Gómez Maluenda University of Zaragoza (SPAIN)
M.Shirchenko, JINR KIAE detectors test & restoration 1. Restoration of the detectors 2. Characterization of KIAE detectors 3. Next steps and.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Gusev K., JINR , Gerda meeting Spectrometric performance of Kurchatov Institute detectors.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Recent progress in ultra-low noise, ultra-low background detectors V. Marian, M.O. Lampert, B. Pirard, P. Quirin CANBERRA France (Lingolsheim) Workshop.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Current status of R&D on MMC and TES and a full size crystal test setup Sang-jun Lee Seoul National University.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconf ACS – FREIA 28th March 2017
IT-4189 Supply and installation of a cryogenic distribution system
Cryogenic behavior of the cryogenic system
Ti/SS transitions A.Basti INFN-PISA*
NA62 LAV Anti1 REMOVAL & TESTS
Overview of GERDA simulation activities with MaGe
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
Course PEF3006 Process Control Fall 2017 Actuators By Finn Haugen
Block 4 and Cluster D - Safety
Plasma Cleaning Safety Presentation
MEG II実験 液体キセノン検出器の建設状況
Cryogenic behavior of the magnet
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Some technical aspects of testing and adaptation of existing detectors

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Preparation of adaptation consists of: I. Testing of existing enriched detectors; II. Repairing of detector performance in the actual cryostats, if it will be needed; III. Estimation of the risks of crystal repacking procedures and Careful check of all necessary operation with typical non- enriched detectors.

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Detector 1Detector 2Detector 3Detector 4Detector 5 Full mass, kG Depletion voltage, V Bias voltage, V (recommended) FWHM, keV at 1332 keV (specifications) FWHM, keV at full HdMo Set-up Test at February 2005 FWHM, keV at 1332 keV Test at May 2005 Bias voltage, V FWHM, keV at 1332 keV TESTING OF EXISTING DETECTORS

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting TESTING OF EXISTING DETECTORS For best realization we need: 1.Spectrometric channel with the best performance; 1.Precision pulse generator; 2.Model of PA first stage.

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting REPAIRING OF DETECTOR PERFORMANCE For heat and pump procedures we must have: 1.Turbo molecular pump with enough efficiency; 2.Nitrogen traps for elimination of any contaminations of detector; 3.Valve for connecting between pump and detector cryostat; 4.Absolutely clear or new vacuum elements (rings, fillers, etc.); 5.Heater, maybe electric fan (temperature not higher than 150°C).

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting POSSIBLE RISKS  Contamination of detector surface because of too early opening of cryostat.  Damage of implantation layer due to careless dismounting of diode from existing support or packing it into the new holder.  Damage of crystal because of too strong pressure in the new support.  Damage of crystal due to thermal shock.  Damage because of keeping and transportation of naked diodes in non- adequate conditions.  Deterioration of lithium layer after too long staying of detectors at room temperature.

Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Conclusions I. Testing of all existing detectors. II. Repairing of detector performance inside the actual cryostats. Required time for I and II is about one month at best. III. For elimination of estimated risks when we open cryostats: Special tools for accurate repacking must be ready; Leak proof box for crystals keeping must be ready too ; All adaptation procedures at non-enriched detectors must be realized.