Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.

Slides:



Advertisements
Similar presentations
Improving a magnetic shield: what works and what does not 26 March 2013 Kiril Marinov 1.
Advertisements

Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
ELI-NP The Way Ahead-Workshop March 10-11, 2011 Vacuum System for Beam Transport Catalin M. Ticos National Institute for Lasers, Plasma and Radiation Physics.
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FAIR MT/Cryogenics, Seong Yeub Shim Beam-Tube Eddy Loss S. Y. Shim.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Focusing Lens for the SSR1 Section of PXIE Preliminary analysis of main options 3/13/2012I. Terechkine1.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Cold Magnetic Shield Update
Beam line Experiment area SC magnet Pion production target
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
Mechanical Integration for the AD at LNL. Overview New reaction chamber and beam-line Telescopic Beam Line Beam Dump Summary.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Magnetic Field Engineering Update CM36 IIT Craig Macwaters 17/6/13 1.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Some Design Considerations and R &D of CEPCB Dipole Magnet
Final doublet: future activity plan
INDUSTRIAL HYGIENE External EHS Expert Panel Workshop
Status of the CLIC DR wiggler design and production at BINP
BA6 – crab cavity activities in EYETS
The design schemes of the low field dipole magnets
HFM Test Station Main Cryostat
General remarks about the HESR and PANDA vacuum system
SiD Muon Yoke Structure - Deformation Studies -
Magnetic gap calculation
Project planning and status (February 2018)
Upgrade phase 1: Energy deposition in the triplet
Wednesday Summary of Working Group I
200 kV gun CST microwave studio simulations Shield modifications
200 kV gun CST microwave studio simulations Shield modifications
SNS PPU Cryomodule Instrumentation
as a prototype for Super c-tau factory
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1

Design considerations Compared to the PSU (last week) the shielding requirements of the pump are more stringent. Access is needed to the valve handle, there is a pipe connecting the pump to its chamber and for cabling (?) Implement the pump shield I am about to show would require additional engineering effort needed, e.g. to design support from the floor, safety, etc.

Concept B in max <<<B 0 Air circulation, valve access Air circulation, cabling Top To vacuum chamber 15 mm thick AISI 1010 steel mm thick steel Φ110 Φ60 600

Installation The two halves can be held together by steel bands. The gap can be controlled by a thin gauge during assembly, should not be much bigger than 0.1 mm. Not to scale

Valve access Shield Valve handle

Shielding performance I B External field 40 mT, along Z. The field in the shielded region is well below the target value (5 mT) with 10 mm thick steel and without any “chimneys”

Shielding performance II External field 40 mT, along Z. The field in the shielded region is well below the target value (5 mT) with 10 mm thick steel and without any “chimneys”. B

Shielding performance III (worst case scenario) External field 40 mT, along Z. The peak field in the shielded region is 9 mT with 15 mm thick steel and with the “chimneys”. B

Permeability distribution Saturation in the problematic (colored) regions: μ decreases to Could be fixed by adding additional 5mm of steel there. We know that this works, but I have not done it yet. B

Summary The pump shielding solution is (almost) complete. The shield thickness is, however, 1.5 cm and may need to be increased to 2 cm. Will investigate and report next week. I will look at the effect of the gap between the two halves of the shield but do not expect anything dramatic. As with the PSU this shielding solutions requires additional engineering effort: support from the floor, safety, joining the two halves. The pump generates a fairly small amount of heat and cooling should not be a problem. Documentation is available. Building a prototype and testing it will eliminate uncertainties and reduce the risk. The sooner – the better.