TA Testing Plans Walter E. Miller OSC/ARC SSSC 29 September 2009.

Slides:



Advertisements
Similar presentations
Development of Computational Model of Sport Utility Vehicle Srdan Simunovic, Gustavo Aramayo and Thomas Zacharia Computer Science and Mathematics Division.
Advertisements

LightSail.
“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
Camera Functions Shooting Mode ISO White Balance Meter Image Quality Drive Mode.
SOFIA SSSC Program Status Robert Meyer Program Manager February 18, 2010.
Gate Automation 03 June VIS/VRS System Overview Equip the ingate and outgate lanes with camera ’ s The VIS system records container damage as.
High Altitude Equatorial Clouds as Seen with the OSIRIS InfraRed Imager A.E. Bourassa, D.A. Degenstein, N.D. Lloyd and E.J. Llewellyn Institute of Space.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
1 Universities Space Research Association SOFIA Program Options SSSC 18 February 2010 Mina Cappuccio SOFIA Science Project Manager NASA Ames Research Center.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
SOFIA First Light: Observations with FORCAST Terry Herter + FORCAST team + Project Team (Ames, Dryden, USRA) TLH: 11-Jan-11.
The Anatomy of a Digital Camera A digital camera contains hundreds of parts It is important to understand the most essential parts of the camera as you.
SOFIA Program Overview CSTA Eddie Zavala Deputy Program Manager October 21, 2011 SS1 Orion Image.
SOFIA — The Observatory open cavity (door not shown) TELESCOPE pressure bulkhead scientific instrument (1 of 7) Scientist work stations, telescope and.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
SITR April 2009; Page 1 MPIfR KOSMA MPS DLR-Berlin S. Heyminck, MPIfR GREAT GREAT: German REceiver for Astronomy at Terahertz frequencies PI-Instrument.
MCCS Status Update SOFIA SITR Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.
October 2006 NASA Dryden Status Aerospace Control & Guidance Sub-committee Williamsburg, VA October 2006 John Bosworth (661)
1 R. D. Gehrz 66th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2011 The Stratospheric Observatory for Infrared Astronomy.
LoCaF: Detecting Real-World States with Lousy Wireless Cameras Benjamin Meyer, Richard Mietz, Kay Römer 1.
FORCAST Line Operation #1 Pasquale Temi NASA-Ames.
Deutsches SOFIA Institut Universität Stuttgart Second Gyro System for the SOFIA Telescope J.F. Wagner Deutsches SOFIA Institut, Universität Stuttgart,
SOFIA Stratospheric Observatory for Infrared Astronomy Telescope Assembly (TA) 1 TA Activation Flight #2 “Quick Look” Data Review TA Activation Flight.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
1 Stratospheric Observatory For Infrared Astronomy (SOFIA) Telescope Assembly Controlled Response Utilizing NASTRAN and MATLAB/Simulink for Pointing Analysis.
Update to End to End LSST Science Simulation Garrett Jernigan and John Peterson December, 2004 Status of the Science End-to-End Simulator: 1. Sky Models.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
1/11/2011AAS SOFIA splinter (Seattle, WA) 1. 1/11/2011AAS SOFIA splinter (Seattle, WA) 2 SOFIA Stratospheric Observatory for Infrared Astronomy 2.7-meter.
1 R. D. Gehrz 64th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2009 The Stratospheric Observatory for Infrared Astronomy.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
The Secure, Automated Home Project Team: Alec Kulbacki Project Advisor: W. Thomas Miller.
1. These basics are common to ALL cameras: F-Stop Shutter Speed Film Speed 2.
The Active Optics System S. Thomas and the AO team.
» We have Nikons, so we will be looking at the Nikon mode dial » Most cameras use similar icons.
Henry Heetderks Space Sciences Laboratory, UCB
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
Phase calibration pictures 3/9/10. Dark count image Required for: 1. determining image intensity in the absence of light. 2. also required for phase artifact.
Motion Correction Riku Klén
Evaluation of Automated Camera Enforcement on Red Light Running Violations by Time into the Red Phase Nicole Oneyear and Shauna Hallmark.
Aperture & Shutter Speed Digital Photography. Aperture Also called the f-stop Refers to the adjustable opening in an optical instrument, such as a camera.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
1 Universities Space Research Association Martin Ruzek SSSC February 18, 2010 FIFI LS EOOP Extended Observing Opportunity Program Operating FIFI LS in.
Auto Modes “P,” “A,” & “S”  Program- Automatic, no flash  Aperture Priority- You choose the Aperture (size of shutter opening) and the camera chooses.
HiMax: Characterization of the CogniMem Device EE x96 Final Presentation Project Advisor: Neil Scott Faculty Advisor: Tep Dobry Members: Raymundo Flores.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Administrative Technologies Oct 2015 Rick Penny 1.
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
SOFIA--The Next Generation Airborne Observatory
SOFIA — The Observatory
Drive-Laser Commissioning Status and Plans
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Mr. Clark’s Camera Settings
SOFIA Pointing and Optimization Team (SPOT): Recent Results and Plans
Development of the User Interface for AIR-SPEC
Aperture.
Fig. 1 above portrays an overall closed-loop architecture of autonomous relative navigation of a client satellite with an integrated sensor System composed.
Henry Heetderks Space Sciences Laboratory, UCB
SOFIA Telescope Manufacturing - Lessons Learned
Launch and On-orbit Checkout
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Software for Neutron Imaging Analysis
February 2007 Note: Source:.
2015 January February March April May June July August September
Presentation transcript:

TA Testing Plans Walter E. Miller OSC/ARC SSSC 29 September 2009

TA Testing Plans-Overview Line Operations-September 2009 TA Activation Flight #2 (Closed Door) Open Door Envelope Expansion Flights (TA 23 degrees) TA-Aperture Misalignment Expansion Flight (Open Door) FORCAST Line Operations TA Characterization #1/First Light Flight (Aperture 23 degrees) Open Door Envelope Expansion Flights (TA Caged) TA Characterization #2 and #3 Early Science SSSC 29 September 2009

Line Operations-September 2009 Fast Diagnostic Camera Installed and Tested (Juergen Wolf) FPI Reinstallation Darkfield Correction (KT) UPS Status Correction (KT) Communication Bug Fix (KT) Flight Media Release (Dryden software CM process) Controller Adjustments Tracker Tests Flexible Body Compensation (FBC) Operator Training SSSC 29 September 2009

Polaris with/without Background Subtraction

TA Activation Flight #2 TA Operation Behind Closed Door-October 2009 Test Uncaging, Local Stabilization and Inertial Stabilization Test Coarse Drive-Fine Drive “Coupled Mode” TA Activation Flight #1 in December 2007 had VIS and Gyro Problems No Aero-Acoustic Disturbances No Optical Tracking Evaluation Other Activations: Gate Valve, NT Fans, FFU TA Control via TAOC Laptop (No MCCS) SSSC 29 September 2009

TA-Aperture Misalignment Expansion Last Flight of 23 Degree Open Door Expansion Series Daytime Flight Late January 2010 Aperture Fixed at 23 Degrees and URD Fully Open Main Goal: Aero-Acoustic Evaluation with Misalignment Secondary Goal: Start of TA Characterization with Open Door Operation with VIS Uncaged Operation in Local Stabilization Primary Mirror Covered TA Control via TAOC Laptop SSSC 29 September 2009

FORCAST Line Operations Hangar and Line Operations with FORCAST TA Control via MCCS (Engineering Build #4) Evaluation of TA-MCCS Functional ICD Evaluation of Workstation GUIs Evaluation of SOFIA Command Language Evaluation of TA Control from PI Computer Evaluation of Closed Loop Aperture Control (Slaved to TA Elevation) Fourteen Nights in February 2010 Upon Completion, Reversion to TA Standalone Setup (TAOC) Operator Training for TA Characterization and First Light Flight SSSC 29 September 2009

TA Characterization and First Light First FORCAST Flight Aperture Fixed at 23 Degrees and URD Fully Open First Night-time Flight with Optical Tracking Detailed Flight Plan with Multiple Legs Evaluation of Pointing Jitter (High Speed FORCAST Imaging) TA Control via TAOC Laptop Attempt at First Light Infrared Image SSSC 29 September 2009

TA Characterization #2 and #3 Two Additional TA Night-time Evaluations (June 2010) After Completion of Open Door Aircraft Expansion Flight Series After Completion of FORCAST Line Operations #2 Final Tests Prior to Early Science Flights TA Control via MCCS (Short Science #1 Build) SSSC 29 September 2009