IEEE Standards for BPL June 7, 2004. Main.net PLC, Inc. CuPLUSmca OH Coupler Considerations Main.net Construction Standards Main.net PLC, Inc. Spec 0/Sheet.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

IEEE Standards for BPL Forum June 7, 2004 Joseph A. Marsilii, Jr., PE Main.net-Power Line Communications Inc Sunrise Valley Drive, Suite 650 Reston,
ELECTRICAL RECEPTACLES
Unit 2- Electrical Components-continued EET 110 Electronics Survey I.
Chapter 29 Electrical Plans. Chapter 29 Electrical Plans.
Basic Electricity.
Basic Electric for heating What is Electricity?
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
 E4 Electrical Installation #1 Power Distribution.
Condensate Trap Heater KGAHT0201KIT 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman UTC Climate, Controls & Security Confidential and Proprietary Information.
Kit includes: New Sprocket New Upper Bracket New Stickers New Ground Wires Toaster Speed Conversion Kit.
Wiring Color Codes for McLean County 4-H Projects.
Technical Committee Orlando, Florida July 25, 2007.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Confidential Steelers Mechanical Design Review 1 PLC MODULE INSTALLATION INSTRUCTIONS IN CGR1240.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
Fixed Installation Tri-Band
Making A Motor Exploring the Magic of Electricity.
EET Survey of Electronics
Toshiba high pressure turbine casing for 600 MW power station, showing unusually long clamping bolts with very narrow flanges 1 Bolts in Tension pt 2 Andrei.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
SeaPerch Design Challenge and Construction Overview.
Reed Switch Motor By Troy Coleman & Colby Cravens.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
Creating a Layout sheet. Sketching  Key Terms & Definitions  Mechanical Drafting: Drawings are created using mechanical instruments. Layout Sheet: consists.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
Residential Construction Drawings
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
CAPSTONE DESIGN 정준영 전우준 김건식 김병찬 한일환 Bending Machine for Orthodontic Archwires Orthodontic Archwires.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Florian Buchsteiner (HEPHY Vienna)
ELECTRICAL RECEPTACLES
ELECTRICAL RECEPTACLES
SPD II 1 for LV Power (AC/DC)
Electricity Symbols.
Engine Compression Testing
Easy-Cliner Manual Cable Version Assembly Instruction
Easycliner (Motorized Version) Assembly Instruction
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
ORTHOGRAPHIC PROJECTION 1
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
Equipotential Grounding Procedures Protective Grounding Training
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
Rod Zivkovich Executive Director of Finance and Support Services
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Which of the following would best describe the situation inside the circle?
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Working Drawings Chapter 12.
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
9 Cranking System Advanced Automotive Electricity and Electronics
Presentation transcript:

IEEE Standards for BPL June 7, 2004

Main.net PLC, Inc. CuPLUSmca OH Coupler Considerations Main.net Construction Standards Main.net PLC, Inc. Spec 0/Sheet 3 Issue Date: 29-Feb-2004Rev.: 0 Revision Date: Drafter: Approved: J. Marsilii President NEUTRAL COUPLER MV COUPLER LINE/PHASE NEUTRAL 1.The MV Coupler and Neutral Couplers are installed with the arrows pointing in the same direction. 2.The MV Coupler is the last element installed during initial installation and following any maintenance. 3.Close the MV Coupler with care. The split cores must come together but there is no need to over torque the screw. 4.In a maintenance situation the MV Coupler must installed prior to performing any work on the units.

Main.net PLC, Inc. RpPLUSmca Typical Overhead Issue Date: 29-Feb-2004Rev.: 0 Revision Date: Drafter: Approved: J. Marsilii President Main.net Construction Standards Main.net PLC, Inc. Spec 3/Sheet 2/2 MV COUPLER (1) HOT LINE CLAMP (2) Detail A: Left Side View BOLT MOUNTING (3) Detail B: Right Side View BOLT MOUNTING (3) RpPLUSmca (6) 120 VOLT (5) NEUTRAL WIRE NEUTRAL NEUTRAL COUPLER (4) Coil & Tie Wrap Excess Wire

Main.net PLC, Inc. RpPLUSmca Typical URD Main.net Construction Standards Main.net PLC, Inc. Spec 5/Sheet 2/2 Issue Date: 29-Feb-2004Rev.: 0 Revision Date: Drafter: Approved: J. Marsilii President RpPLUSmca (2 ) 240 VOLT (3) URD COUPLER (1)