Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003.

Slides:



Advertisements
Similar presentations
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
Advertisements

PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
ISIM Integration & Test Mike Drury JWST-PRES
The MICE Target Lara Howlett University of Sheffield.
G2P Target installation and Beyond. Schedule Pivot before.
AMULET Advanced Metrology Using LasEr Tracers John Dale.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Freiburg, May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP Instrument.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
Field Robot Project to Develop a Fully Autonomous Vehicle for a Field Environment.
21 May 2013 Jim Leitch, PI Geostationary Trace Gas and Aerosol Sensor Optimization (GeoTASO) ESTO IIP 21 May 2013 Jim Leitch,
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
LCGT Cryogenics Status Report KEK T.Suzuki.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
Training in Vacuum Technology for JUAS 2013 Students
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
Proprietary BalloonWinds Update Author: Ivan Dors – UNH Presented By: Michael Dehring -- MAC 28 June 2006.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Agenda (1)  Review of Status –SCISAT I ProgramVictor Wehrle  Current Knowledge and Further Needs –FTS/Imager InstrumentChris Boone –MAESTROInstrumentTom.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Scisat Test Readiness Review MAESTRO Evaluation and Verification Tests University of Toronto 29 January 2003.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Status of n_TOF Facility
COB Integration and Test Nov. 15, 2010 Roy Esplin Mike Watson Monte Frandsen.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
1 HMPID Project Assembly & Tests of CsI QE monitors: VUV-scanner and ASSET Milestone: December 2002.
Testing of Highly Accurate Blackbodies Harri Latvakoski Mike Watson Shane Topham Mike Wojcik SDL/
(vertical cryostat, Gersemi)
SXC integration and test
Meteorological Service of Canada
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Jesper Schou Instrument Scientist
Integration, Test, and Verification
Launch and On-orbit Checkout
Installation of Photon Beam Transport to FEH
CONTOUR NGIMS Electronics Test History
Integration and Test Organization Chart
Presentation transcript:

Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

GSE Components TVAC system (includes LN2 shroud and LHe target) Collimator system (includes 3 sources to simulate sunlight to test Scisat in TVAC) Laser Assembly QI - Spectralon Assembly Solar Simulator EGSE

TVAC system

TVAC system status Good pumpdown performance during MAESTRO baseline tests Temperature and Pressure monitoring systems work fine LN2 shroud tested successfully He target tested successfully Baseplate handling system tested successfully New thermal bath to be implemented ? Gate valve is currntly under repair BaF 2 and ZnSe windows have never been tested with the tank

Collimator System (Not shown: Attenuator Wheel, 3000K blackbody, QI lamp)

Collimator System Alignment Mechanism

Collimator System Status Alignment system complete, works fine Xe & QI configurations tested with MAESTRO during baseline tests (Oct 2002) NO 2 handling process in place and tested Succesful gas absorption measurements taken during baseline tests. Ozone cell remains untested with collimator system Cell temperature and pressure monitoring to be implemented FTS gas cell not tested 3000K black body not tested Nitrogen purge tent not finished Hybrid attenuators for FTS testing not built yet Polarizers not tested with MAESTRO

Integrated Laser Platform

Integrated laser platform status 4 beam expanded lasers (325nm, 532nm, 670nm and 830nm) are combined using a holographic grating Laser platform has been assembled & partially tested during MAESTRO baseline tests Laser assembly needs to be re-aligned and tested with MAESTRO

QI - Spectralon calibration jig This unit has been used many times by MSC for absolute radiance calibration A new current control algorithm is part of the EGSE & has been used successfully

Solar simulator Was used for MOPITT characterization, the plan is to use it for FTS imager field tests All parts seem to be present, but it hasn't been used in several years

EGSE Network

EGSE Status EGSE was successfully used for MAESTRO baseline testing (MAESTRO controller, OGSE controller and TVAC Interface PC's) PC Anywhere has been installed on all PC's Some scripts need to be revised UDP interface with FTS EGSE has not yet been tested Sending scripts to MAESTRO and FTS simultaneously has not been tested