A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Establish Verification Procedures (Task 11 / Principle 6)
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
ISO General Awareness Training
IS Audit Function Knowledge
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
Protection Against Occupational Exposure
Codex Guidelines for the Application of HACCP
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
External Operations Experience Update: NRC Information Notices: Qualification of Safety-Related Components and Antifreeze Agents in Fire Water Sprinklers.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
Definitions, Goals and Objectives
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
1 Comprehensive Pump Testing Challenges. 2 Purpose This presentation will discuss:  Hardships encountered while implementing comprehensive pump test.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
Hazards Identification and Risk Assessment
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
2007 CMBG Conference Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 19, 2006 Charleston, SC Latent Issues and Lessons Learned Discussion.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
1 CDBI Inspection Insights for 2008 Kelly Clayton Senior Reactor Inspector Engineering Branch 1 Region IV.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
ON CONDITION TASK Module 3 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
ISTOG INDUSTRY ISSUES Interactive Session Gregg Joss (Ginna Station Vice Chair ISTOG) Ron Lippy (True North Consulting ISTOG Facilitator)
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
United States Department of Agriculture Food Safety and Inspection Service Overview of Trim Sampling Compliance Guidelines and Discussion Daniel Engeljohn,
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
2006 CMBG Conference BREAKOUT 1: Component Design Basis Inspection Facilitators: Bill Kline/FENOC Sonya Myers/NMC June 11-14, 2006 Richmond, VA.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Configuration Management in NRC’s Reactor Inspection Program Tony Gody, Region II/DRS.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.

NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Prescriptive vs Performance-Based Regulatory Approaches
Conduct of the Review May 2005 Revision
(Additional materials)
Flooding Walkdown Guidance
NRC CM Pilot Inspections Methodology and Results
NRC Event Number – Event Date
Unit I Module 3 - RCM Terminology and Concepts
Temporary Alterations in Support of Maintenance and Temporary Modifications Beth Kernes Krause - Cooper Station February 24, 2019 Cleveland 2005.
TRTR Briefing September 2013
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Presentation transcript:

A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida

Introduction Component Design Bases Inspections (CDBIs) are conducted by the NRC to review risk significant components and ensure that these components are capable of performing their intended safety functions. Inservice Testing (IST) is performed to assess operational readiness and detect and act upon indications of degradation to ensure that components are capable of performing their intended safety functions. ▫Although the objectives are similar, they are not identical. CDBI reports and findings indicate that there is an increasing emphasis on testing and test margins to ensure that design bases are adequately demonstrated to the satisfaction of the inspector. ▫Increasingly, the capacity to meet design requirements has been linked to inservice test (IST) programs. ▫This expectation is heightened when a design basis test has not been developed. 2

IST 101 IST is intended to assess the operational readiness of components that may be required to place the plant in safe shutdown, maintain safe shutdown or mitigate the consequences of a design basis accident. ▫Assessment is accomplished by testing the component when known to be operating acceptably at a point that may be readily duplicated during subsequent tests. ▫Reference values are established at this test point and subsequent tests are then performed at this reference point with the intent of: 1.Assessing continued operational readiness. 2.Detecting and taking actions in response to degrading component conditions. 3

IST 101 IST acceptance limits are determined by imposing a specific band around the original reference values. The multipliers used to derive these bands vary dependent on both the component and the design of the component. Limiting values for many IST components may also be found in the UFSAR or Technical Specifications. These limits are usually expressed in terms of hydraulic performance for pumps and limiting stroke time values for power operated valves. ▫UFSAR or Technical Specification limits take precedence over ASME Code derived limits. 4

Regulatory In December of 1997, the NRC issued Information Notice (IN) to alert licensees to potential problems associated with safety-related pump surveillance testing IN cited Appendix B, Criterion XI, "Test Control” 10 CFR Part 50 and stated that licensees have concentrated on inservice testing (IST) requirements without ensuring that design requirements were met. IN also stated that there are two applicable primary requirements for safety-related pump testing: 1.To ensure that Criterion XI is met in that each safety- related pump achieves its minimum design-required performance. 2.To ensure that each safety-related pump meets the requirements of the ASME OM Code. 5

Regulatory Criterion XI of Appendix B to 10 CFR Part 50 requires that a test program be established with written test procedures that incorporate the requirements and acceptance limits contained in applicable design documents. Although licensees have established IST acceptance criteria that meet the requirements specified in the ASME Code, the criteria at some plants allowed safety- related pumps to degrade below the performance assumed in the accident analyses. 6

Regulatory IN summary: ▫IST is intended to monitor degradation of components; however, does not require that pumps be tested at design-basis conditions. ▫ASME tests may be used to verify compliance with the ASME Code and the pump design requirements contained in plant design-basis documentation such as the FSAR. ▫If the minimum design performance as specified in the plant design documentation is more stringent than the ASME Code acceptance criteria, then the test acceptance criteria must be adjusted to the more conservative requirements. ▫Original plant design-basis calculations, or revisions to these calculations must be properly integrated into surveillance test procedure acceptance criteria. 7

NRC Inspection Guidance The NRC Inspection Manual, Attachment contains prescriptive guidance for the conduct of a Component Design Bases Inspection. This manual defines design margin as the margin in the design calculations related to the performance of the component. ▫For example, the analytical margin for a pump includes flow and head required for the pump to perform its function compared to the calculated capacity of the equipment. The Inspection Manual also requires that the inspector determine whether the design basis is met by the installed and tested configuration. ▫How this requirement is met is somewhat subjective. Without clear guidance, CDBI related conflicts are likely as evidenced by industry OE. 8

IN , IST Specific In March of 2008, the NRC issued IN , Findings Identified During Component Design Bases Inspections - Testing.  Failure to account for EDG under frequency in pump test acceptance criteria.  Failure to appropriately account for instrument uncertainties.  Failure to ensure adequate test equipment.  Failure to account for valve pressure locking effects.  Failure to verify the minimum containment cooling coil fouling factor assumed in analyses.  Failure to consider the effects of service water strainer plugging on flow rate. 9

The Dilemma The ASME OM Code does not discuss design basis capability, but does refer to operational readiness. Typically, the IST program is used in conjunction with other programs to confirm operability. Without question, the design basis must be protected; however, the details related to what constitutes an adequate design basis test program, what elements must be considered or where this program should reside are confusing to many. IST limits should be established in a manner that envelopes design limits. ▫For example, IST limits must consider instrument accuracy when establishing limiting values. 10

The Dilemma This example is just one of many that illustrates the conflict that may exist and the basis for the differing expectations between the regulating authority and the IST Engineer. Examples of questions provided on the following slides indicate an increasing need for ISTOG to become involved and provide assistance to IST Engineers. To do this, guidance may be needed or clarifications to existing requirements developed to provide a uniform set of rules. ▫Currently, guidance is being provided in the form of Operating Experience. It is important to maintain perspective - Design Basis testing need not be established in IST Procedures. 11

Industry OE- Example #1 Concern Instrument uncertainty is not accounted for in development of IST acceptance criteria. Concern Instrument uncertainty is not accounted for in development of IST acceptance criteria. Considerations 1.Instrument accuracy is addressed by ASME; however, uncertainty is not. 2.What is the overall impact when additional penalties associated with instrument drift, M&TE equipment, temperature changes, orifice plate tolerance, etc. are factored into the total error for a parameter using the square root of the sum of the individual errors squared (SRSS) methodology? 3.Minimize the effects by performing post test calibration checks of test instruments. Considerations 1.Instrument accuracy is addressed by ASME; however, uncertainty is not. 2.What is the overall impact when additional penalties associated with instrument drift, M&TE equipment, temperature changes, orifice plate tolerance, etc. are factored into the total error for a parameter using the square root of the sum of the individual errors squared (SRSS) methodology? 3.Minimize the effects by performing post test calibration checks of test instruments. 12

Industry OE- Example #2 Concern Instrument uncertainty is unaccounted for in shaft speed for variable speed pumps. Examples: 1.Steam driven turbine pumps. 2.Variable speed motor driven pumps. Concern Instrument uncertainty is unaccounted for in shaft speed for variable speed pumps. Examples: 1.Steam driven turbine pumps. 2.Variable speed motor driven pumps. Considerations 1.Account for instrument accuracy for variable speed pumps. Considerations 1.Account for instrument accuracy for variable speed pumps. 13

Industry OE- Example #3 Concern Check valve acceptance criteria lack adequate basis and does not ensure design requirements are met. Examples: 1.Differential pressure does not ensure that idle pumps are not rotating. 2.Differential pressure does not consider additional stress on the pump shaft when a start signal is received. Concern Check valve acceptance criteria lack adequate basis and does not ensure design requirements are met. Examples: 1.Differential pressure does not ensure that idle pumps are not rotating. 2.Differential pressure does not consider additional stress on the pump shaft when a start signal is received. Considerations 1.Assess check valve reverse flow acceptance criteria and tighten limiting values, if possible. 2.Supplement the closure test by including an additional requirement to verify idle pumps are not rotating.  For example: The check valve acceptance criteria is met when measured differential pressure is > 80 psid AND the idle pump is observed and is not rotating. 3.Develop calculations to bound the limiting values. Considerations 1.Assess check valve reverse flow acceptance criteria and tighten limiting values, if possible. 2.Supplement the closure test by including an additional requirement to verify idle pumps are not rotating.  For example: The check valve acceptance criteria is met when measured differential pressure is > 80 psid AND the idle pump is observed and is not rotating. 3.Develop calculations to bound the limiting values. 14

Industry OE- Example #4 Concern The effects of limit switch settings used in determining the open and closed positions of valves is not factored into IST acceptance limits. Concern The effects of limit switch settings used in determining the open and closed positions of valves is not factored into IST acceptance limits. Considerations 1.Reduce the limiting value to account for limit switch error.  MSIVs closure may provide one of the more limiting challenges. 2.Is this concern only relevant when addressing closure? 3.Does this concern vary dependent on the valve design? 4.Can ISTOG develop a product to address this concern? 5.Input from AOV, MOV Engineers would be helpful. Considerations 1.Reduce the limiting value to account for limit switch error.  MSIVs closure may provide one of the more limiting challenges. 2.Is this concern only relevant when addressing closure? 3.Does this concern vary dependent on the valve design? 4.Can ISTOG develop a product to address this concern? 5.Input from AOV, MOV Engineers would be helpful. 15

Industry OE- Example #5 Concern The effects of EDG frequency droop on pump and valve performance. Most Technical Specifications permit frequency variations as low as 58.8 hz. Examples: 1.Motor stall for MOVs. 2.Lower EDG frequency translates to slower pump speed. Pump speed is directly proportional to flow rate and pump head squared. Concern The effects of EDG frequency droop on pump and valve performance. Most Technical Specifications permit frequency variations as low as 58.8 hz. Examples: 1.Motor stall for MOVs. 2.Lower EDG frequency translates to slower pump speed. Pump speed is directly proportional to flow rate and pump head squared. Considerations 1.Incorporate the impact of the lowest allowable EDG frequency into pump and power operated valve calculations. 2.Minimize the impact by revising Technical Specifications to impose a tighter band.  Some plants have incorporated a new limit of + 0.5hz. ▫The upper limit restriction is in response to recent findings associated with EDG over frequency concerns. Considerations 1.Incorporate the impact of the lowest allowable EDG frequency into pump and power operated valve calculations. 2.Minimize the impact by revising Technical Specifications to impose a tighter band.  Some plants have incorporated a new limit of + 0.5hz. ▫The upper limit restriction is in response to recent findings associated with EDG over frequency concerns. 16

Industry OE- Example #6 Concern The station did not have a process in place to evaluate or prevent unacceptable preconditioning of IST components. 1.The NRC utilizes Inspection Procedure, Part 9900 to evaluate a stations ability to prevent unacceptable preconditioning. 2.The Inspection Procedure is more detailed than public information provided in the form of two previous Information Notices. ▫INs and addressed preconditioning, but did not address the subject in detail and in present terms. Concern The station did not have a process in place to evaluate or prevent unacceptable preconditioning of IST components. 1.The NRC utilizes Inspection Procedure, Part 9900 to evaluate a stations ability to prevent unacceptable preconditioning. 2.The Inspection Procedure is more detailed than public information provided in the form of two previous Information Notices. ▫INs and addressed preconditioning, but did not address the subject in detail and in present terms. Considerations 1.A procedure can easily be developed to mirror the NRC Inspection Procedures.  ISTOG has already developed a Position Paper. 2.There is a valid concern related to the differing views offered by the original INs and the subsequent inspection procedure. 3.Also, many are unsure of the requirement to adhere or commit to an NRC Inspection Procedure, particularly one that differs from previous guidance and was not formally introduced. 4.This is a work management concern that has inappropriately burdened IST. 5.PM models for valves that are tested at cold shutdown can be revised to obtain an as-found stroke prior to maintenance. Considerations 1.A procedure can easily be developed to mirror the NRC Inspection Procedures.  ISTOG has already developed a Position Paper. 2.There is a valid concern related to the differing views offered by the original INs and the subsequent inspection procedure. 3.Also, many are unsure of the requirement to adhere or commit to an NRC Inspection Procedure, particularly one that differs from previous guidance and was not formally introduced. 4.This is a work management concern that has inappropriately burdened IST. 5.PM models for valves that are tested at cold shutdown can be revised to obtain an as-found stroke prior to maintenance. 17

Industry OE- Example #7 Concern Surveillance testing drained water from piping for a safety related system with no provisions to ensure the system was refilled. Air was found in the system after the inspectors questioned the condition. Concern Surveillance testing drained water from piping for a safety related system with no provisions to ensure the system was refilled. Air was found in the system after the inspectors questioned the condition. Considerations 1.NRC GL , Managing Gas accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems 2.Review procedures that drain systems or portions of systems.  Most vulnerable when performing check valve closure tests. Considerations 1.NRC GL , Managing Gas accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems 2.Review procedures that drain systems or portions of systems.  Most vulnerable when performing check valve closure tests. 18

Industry OE- Example #8 Concern The licensee inappropriately took credit for post- maintenance valve testing as inservice testing. This was not a valid inservice test because it was not representative of baseline valve performance. Concern The licensee inappropriately took credit for post- maintenance valve testing as inservice testing. This was not a valid inservice test because it was not representative of baseline valve performance. Considerations 1.Once again, this is a Preconditioning topic. Considerations 1.Once again, this is a Preconditioning topic. 19

Industry OE- Example #9 Concern The licensee failed to demonstrate how instrument uncertainties were correctly translated into technical specification values or acceptance criteria of surveillance tests. HPCI and RCIC pump performance test acceptance criteria did not bound the applicable design values. Licensee verified pump operability based on actual performance test results. Concern The licensee failed to demonstrate how instrument uncertainties were correctly translated into technical specification values or acceptance criteria of surveillance tests. HPCI and RCIC pump performance test acceptance criteria did not bound the applicable design values. Licensee verified pump operability based on actual performance test results. Considerations 1.Include instrument error or provide adequate test margin.  Be extremely careful with low margin components. Considerations 1.Include instrument error or provide adequate test margin.  Be extremely careful with low margin components. 20

Industry OE- Example #10 Concern The licensee failed to ensure that the turbine driven emergency feedwater (EFW) pump steam admission valve inservice tests had stroke time acceptance criteria that incorporated design basis requirements. The licensee restored the valve to its design basis stroke time range. Concern The licensee failed to ensure that the turbine driven emergency feedwater (EFW) pump steam admission valve inservice tests had stroke time acceptance criteria that incorporated design basis requirements. The licensee restored the valve to its design basis stroke time range. Considerations 1.Include instrument error or provide adequate test margin. 2.A firm understanding of design basis requirements is necessary. ▫For older plants, making this determination may be challenging. Considerations 1.Include instrument error or provide adequate test margin. 2.A firm understanding of design basis requirements is necessary. ▫For older plants, making this determination may be challenging. 21

Industry OE- Example #11 Concern The licensee had not verified the adequacy of design for the turbine driven AFW pump. Specifically, the pump hydraulic analysis was non- conservative, but was used to verify adequacy of surveillance test acceptance criteria for pump minimum discharge pressure. Concern The licensee had not verified the adequacy of design for the turbine driven AFW pump. Specifically, the pump hydraulic analysis was non- conservative, but was used to verify adequacy of surveillance test acceptance criteria for pump minimum discharge pressure. Considerations 1.Include instrument error or provide adequate test margin. 2.Post test calibration checks of M&TE. 3.Ensure that variance around the reference band is included in these determinations. ▫It may be necessary to restrict the allowable variance.  This will also result in more consistent test results. Considerations 1.Include instrument error or provide adequate test margin. 2.Post test calibration checks of M&TE. 3.Ensure that variance around the reference band is included in these determinations. ▫It may be necessary to restrict the allowable variance.  This will also result in more consistent test results. 22

SUMMARY Systems and components are designed and operated, as described in the current licensing basis and incorporate design margins, to ensure that some loss of quality does not lead to immediate failure. Current licensing basis includes commitments to specific codes and standards, design criteria, and some regulations that also dictate margins. Conservatism is typically incorporated into test criteria to ensure that a partial loss of quality does not immediately impact component operability. 23

SUMMARY The problem for the IST Engineer and station personnel is that 10 CFR Part 50, Appendix B, Criterion XI requirements applicable to Test Control is subjective. A better understanding is required for station personnel to meet governing expectations. ▫For this to occur, the expectations must be clear and concise. ▫The Station may then determine the appropriate manner to meet these expectations. 24