MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.

Slides:



Advertisements
Similar presentations
Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Advertisements

Demand Response Commissioner Suedeen Kelly June 3, 2008.
The Midwest ISO from a Transmission Owner Perspective.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
The Two Settlement System and Virtual Bidding in Electricity Markets &
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Congestion Management Settlement Credits December, 2002.
TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Prepared by John D. Chandley For PJM and Midwest ISO States May 2008
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
EE 369 POWER SYSTEM ANALYSIS
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Day Ahead Market Working Group April 7, Agenda March 31 minutes DAM Feasibility Study - Questions? Coral Proposal - Discussion Generators and.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
Goal Parameters How Tools Results Increasing Revenues by Optimizing Generation Relative to PJM Forecasted Price Signals.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
EE/Econ 458 Market Overview: Time-Line and SCUC, RAC, SCED J. McCalley 1.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 A Conversation about MISO Paul Spicer November 8, 2007.
SPP.org1 1 MOPC Workshop Series on Future Markets: Session I August 24, 2010.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Hourly Offers Schedule Update Examples
Wind Management at MISO
North American Markets Status
MRES Resource Operations in SPP
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Basin Electric SPP Market Update
30 Minute Reserves EPFSTF January 4,
PacifiCorp-CAISO-NVE EIM Initiative Overview
Presentation transcript:

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007

MISO Footprint

US RTOs ERCOT ISO Grid Florida PJM PJM West New York ISO RTO New England Grid West WestConnect California ISO SPP MISO 138,870 MW capacity 111,275 miles transmission 16.5 million customers 111,503 MW load

MISO Control Center - Indianapolis

MISO Market – Types of Generation

Summer Load Curve

Winter Load Curve

Forward Prices

MISO Market & Bilateral Market Bilateral Market Energy Sale Between Two Counterparties ex : AEM -> TVA $45.00 Can Occur External or Internal to MISO Long Term, Day Ahead, & Hourly Markets MISO Energy Market Offer Generating Units into MISO Power Pool Bid Loads into MISO Day Ahead & Hourly (Real-Time) Markets

MISO Day 2 LMP Market Locational Marginal Pricing Market (April 1, 2005) Locational Marginal Pricing Market (April 1, 2005) All generators offer generation into the day ahead and the hourly (real-time) market All generators offer generation into the day ahead and the hourly (real-time) market Load is forecast on a day ahead basis Load is forecast on a day ahead basis Day Ahead market closes at 11 am EST day ahead Day Ahead market closes at 11 am EST day ahead Day Ahead market settles at 5 pm EST day ahead Day Ahead market settles at 5 pm EST day ahead Day Ahead RAC (Reliability Assessment Commitment) completed at 8 pm EST day ahead Day Ahead RAC (Reliability Assessment Commitment) completed at 8 pm EST day ahead Hourly unit capability declaration 30 min prior to hour Hourly unit capability declaration 30 min prior to hour MISO LMP Market runs a security constrained dispatch model which determines the lowest cost generation dispatch without exceeding any transmission limitations MISO LMP Market runs a security constrained dispatch model which determines the lowest cost generation dispatch without exceeding any transmission limitations MISO redispatches generation based on LMP dispatch model every 5 minutes MISO redispatches generation based on LMP dispatch model every 5 minutes

Unit 1Unit 2Unit 3Unit 4 MISO Market – Day Ahead Awards

LMP = Energy + Congestion + Losses

Congestion Load Gen 1000MW On Gen 200MW OFF 3000MW Gen 2000MW On (3000MW Capability) 2000MW Limit $40 Offer $200 Offer $40 Offer $ LMP $

Financial Transmission Rights (FTRs) DA Congestion Financial Transmission Rights (FTRs) from base load generation to load provide a hedge against congestion. FTRs are funded if congestion shows up in the DA market –On paper, Generators lose money, but FTRs recover the lost money FTRs assure that at the very least, load obligations are served with low cost units whenever possible –Other Generators may see increased DA LMPs No DA congestion means units will be paid more but the FTRs will have no daily value RT Congestion FTRs do not apply to RT congestion If congestion does not show up in DA, but instead shows up in RT, then the RT LMP will be less than the Generator Offer Generators are paid in full in the DA market and can make more money in RT by NOT generating.

MISO Market – 5 Minute LMP Dispatch

Unit Meets Day Ahead Commitment

Unit Trip – RT LMP Settlement

Unit Trip – RSG Charges

Total Cost of Unit Trip Profit (Unit Meets DA Commitment) = $684,200 Profit (Unit Trips) = $45,375 Average RSG Charge (Unit Trips) = $95,051 Low RSG Charge (Unit Trips) = $2,019 High RSG Charge (Unit Trips) = $316,805 Cost of Unit Trip Ave = ($684,200 - $45,375) + $95,051 = ($733,876) Low = ($684,200 - $45,375) + $2,019 = ($640,844) High = ($684,200 - $45,375) + $316,805 = ($955,630)

Typical Generator/Marketer/MISO Communications Marketer Balancing Authority (Control Area)

Unit Returns from Outage Late – RT LMP

Unit Returns from Outage Late – RSG

Unit Returns from Outage Early

Actual Ramp vs. MISO Dispatch

MISO Charges Uninstructed Deviation : Unit is deviating greater than 10% of MISO Basepoint for an integrated hour (25 MWs max cap, 5 MWs min cap) Regulating Unit is deviating greater than the sum of 10% of MISO Basepoint for an integrated hour plus the amount of Reg Up and Reg Down offered in the generation offer Revenue Sufficiency Guarantee Revenue to Generators due to: Make whole payments to DA, RAC, or Reliability committed units Costs to Generators, Loads, Virtuals & MISO interchange due to: Charged for every MW difference between actual and MISO Dispatch Variation of RT load from DA load bid Variation of RT imports from DA imports Variation of RT unit output from DA unit schedule All exports from MISO All RT imports into MISO All DA Virtual Offers and Bids Average RSG Rates: $7.72 / MWh; 2006 – $4.04 / MWh

2006 RSG Rates by Quarter

Improvement Opportunities Regulation Units Available to Regulate for ACE Units Available to Regulate to Track 5 Min LMP Increased Ramp Rate Speed Larger Ramp Ranges Regulate to Top of Unit Capability Outage Scheduling More Exact Return to Service Times Optimal Economic Derate Windows Capability Declarations More Accurate Day Ahead Capability Estimates Plant and Marketer Communications MISO Ancillary Service Market

Questions?