Doc.: IEEE 802.11-10/0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.

Slides:



Advertisements
Similar presentations
Doc.: /04 Submission August 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Advertisements

Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
802.16m Closing Report November 11, 2010 Dallas, Tx Session # IEEE m-10/0035.
Doc.: /05 Submission September 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Doc.: IEEE /0800r8 Submission November 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval.
Doc.: IEEE /0715r0 Submission July 2009 Stephen McCann (RIM) Slide 1 P802.11u Report to EC on Approval to go to Sponsor Ballot Date: Authors:
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE 11-12/0179r3 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC in support of approval to proceed to RevCom Date:
Doc.: IEEE 11-12/0179r1 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC on in support of approval to proceed to RevCom Date:
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
Closing Report Date: Authors: May 2010 March 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 Closing Report
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
Presentation transcript:

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11u to RevCom. Document approvals –11-10/0872r2, WG July 16, 2010: Passed in the Working Group –11-10/0872r3, WG Nov 12, 2010: Passed in the Working Group /0872r4 updated following 5 th re-circulation sponsor ballot

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 3 P802.11u 5 th Re-circulation Ballot It should be noted that during the P802.11u 4th re- circulation sponsor ballot, 0 comments were received. However, whilst doing industry interoperability testing, it was discovered that there were errors in numbers administered by the IEEE Assigned Numbers Authority (ANA). It was decided that the best way to fix these errors was to amend the draft prior to publication and initiate a 5th re-circulation sponsor ballot.

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 4 IEEE 802 Sponsor Ballot Results – P802.11u DraftOpenedClosedDays Ballot Type PoolApproveDisapproveAbstainReturn D Initial [90%]12 [10%]13 [10%]132 [86%] D st Recirc [92%]10 [8%]13 [10%]140 [90%] D nd Recirc [94%]7 [6%]14 [10%]142 [92%] D rd Recirc [96%]5 [4%]14 [10%]143 [93%] D th Recirc [98%]2 [2%]14 [10%]143 [93%] D th Recirc [99%]1 [1%]14 [10%]143 [93%]

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 5 Mandatory Coordination Coordination EntityDraftDateStatus IEEE-SA Editorial (MEC)D7.0July 09Meets all editorial requirements. Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Not required Registration Authority Committee (RAC) Not required

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 6 Comments by Ballot – P802.11u DraftBallotNot RequiredSatisfied Known Unsatisfied Assumed Unsatisfied Total D8.0Initial D9.0Recirc D10.0Recirc D11.0Recirc D12.0Recirc D13.0Recirc Total

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 7 CommenterD8.0D9.0D10.0D11.0D12.0Total Stephen Palm (Broadcom)* Total Unsatisfied Comments by Commenter * Assumed unsatisfied, no response to repeated s to commenter

doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 8 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. –Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

doc.: IEEE /0872r4 Submission November 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 9 TGu Timeline Revcom (Continuous Process)2011-Jan