Doc.: IEEE 802.11-08/1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: 2008-11-13 Author:

Slides:



Advertisements
Similar presentations
Doc.: IEEE P /661r0 Submission July 2009 Donald Eastlake 3rd, Sterllar SwitchesSlide 1 July 2009 Mesh Meeting Agenda Date: Authors:
Advertisements

Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE xxx-00 Submission July 2006 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE /2142r1 Submission July 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, July Date: Authors:
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE P /187r1 Submission January 2009 Donald Eastlake 3rd, MotorolaSlide 1 TGs Los Angeles Closing Report Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0235r0 Submission February 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, February Notice: This document has been prepared.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /207r0 Submission March 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE P /470r0 Submission May 2009 Donald Eastlake 3rd, Sterllar SwitchesSlide 1 May 2009 Mesh Meeting Agenda Date: Authors: NameAddressAffiliationPhone .
Doc.: IEEE /1386r0 Submission September 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, September Notice: This document has been prepared.
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
Doc.: IEEE /0380r1 Submission March 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 Mesh Networking Task Group Process Donald E. Eastlake.
Doc.: IEEE /800r1 Submission July 2004 Donald Eastlake 3rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd
Doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
Doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, July Date: Author: July 2009 July 2009
Mesh Networking Task Group Process
TGs Atlanta Closing Report
TGs Process Date: Authors: January 2005 January 2005
TGs Process Date: Authors: November 2005 November 2005
TGs Process Date: Authors: July 2005 July 2005
TGs Montreal Closing Report
TGs London Closing Report
TGs Process Date: Authors: September 2005 September 2005
TGs Process, July Date: Author: July 2009 July 2009
TGs Process Date: Authors: March 2005 March 2005
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGaf San Antonio Closing Report
TGs Process, March Date: Authors: March 2006 January 2006
TGs Process, September Date: Author: September 2008
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, November Date: Authors: November 2007
TGs Process, November Date: Author: November 2009
TGs Process, July Date: Authors: July 2006 July 2006
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: March 2007 March 2007
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, February Date: Authors: February 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, September Date: Author: September 2009
TGs Process, September Date: Authors: September 2007
September 2009 Closing Report
January 2008 Mesh Meeting Agenda
TGs Process, January Date: Authors: January 2007
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2006
TGs Process, November Date: Authors: November 2006
TGs Process, March Date: Author: March 2009 March 2009
TGs Process, January Date: Authors: January 2007
TGs Process, May Date: Authors: May 2007 March 2007
TGs Denver Closing Report
TGs Process Date: Authors: March 2005 March 2005
TGs Process, May Date: Authors: May 2007 May 2007
TGs Process Date: Authors: May 2005 May 2005
TGs Taipei Closing Report
Mesh Networking Task Group Process
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 2 Abstract Slides for discussion of the IEEE TGs process in getting through Working Group Letter Ballot and Beyond.

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 3 Mesh Networking Task Group Process TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald E. Eastlake 3 rd, Motorola

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 4 Process of Getting to Letter Ballot and Beyond Adoption of PAR and 5 Criteria Technical Presentations and Discussions, Specify Any Additional Requirements, Comparison Criteria, or Other Documents Call For and Presentation of Proposals Select from Submitted Complete Proposals to Produce a Draft Refine Draft 1 st Letter Ballot – November 2006 – Fails Resolve Comments 2 nd Letter Ballot – March 2008 – Fails Resolve Comments 3 rd Letter Ballot – January 2009 (?) Recirculation Sponsor Ballot – November 2009 (?) Recirculation Final WG/EC Approval IEEE SB REVCOM Approval Completed Steps | Future Steps

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 5 Process for Refining Draft Letter Ballot #93 on Draft D1.0 authorized at November 2006 meeting. –Approval rate 48%. 5,713 comments, about ½ Editorial and ½ Technical. Letter Ballot #126 on Draft D2.0 authorized at the March 2008 meeting. –Approval rate 61%. 1,964 comments, about 1/3 Editorial and 2/3 Technical. 75% approval required to pass.

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 6 Advantages/Disadvantages of Passing/Failing Letter Ballot AdvantagesDisadvantages Passing Letter Ballot You enter re-circulation so subsequent votes are 15 days and voters can only add comment each time on parts of the Draft that have changed or been affected by changes. The voting pool is fixed and no new people joining can vote. You must resolve every comment by a ¾ vote. You can only change the draft through the resolution of comments. Failing Letter Ballot You are free to make whatever changes in the Draft the task group wants. Your next Letter Ballot must be at least 30 days and will include everyone in the Working Group at that time and they can comment on any part of the Draft.

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 7 3 Cycles of Comments and Resolution Call for Informal Comments Comment Resolution WG Letter Ballot / Recirculation Sponsor Ballot / Recirculation Comment Resolution

doc.: IEEE /1326r1 Submission Summary of Comment Resolution November 2008 Donald Eastlake 3rd, MotorolaSlide 8 LB #126 Closed Thru Jacksonville Closed Thru Denver Closed Thru Waikoloa Total %47424%78340%150677% Editorial65633%29745%45069%56494% Technical130867%17714%33325%94269%

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 9 Schedule Projected at Waikoloa, Hawaii, (September) Meeting July 2008 (Denver, Colorado) –Comment Resolution September 2008 (Waikoloa, Hawaii) –Comment Resolution November 2008 (Dallas, Texas) –Comment Resolution, Third Letter Ballot Authorized January 2009 (Los Angeles, California) –Comment Resolution March 2009 (Vancouver, British Columbia) –Third Letter Ballot Re-circulation May 2009 (Montreal, Qubec) –Comment Resolution July 2009 (San Francisco, California) –Comment Resolution, LB Recirculation September 2009 (Waikoloa, Hawaii) –Comment Resolution, LB Recirculation

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 10 January– Los Angeles Meeting Schedule We will probably have 20 hours (10 regular 2 hour sessions): –1 hr Opening Session: Administrivia, Minutes, Agenda, Process –18 hr Comment Resolution and Draft Improvement –1 hr Closing Session: Process, Teleconferences /Ad Hocs

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 11 Schedule Projected at Dallas, Texas, (November) Meeting September 2008 (Waikoloa, Hawaii) –Comment Resolution November 2008 (Dallas, Texas) –Comment Resolution January 2009 (Los Angeles, California) –Comment Resolution, Third Letter Ballot Authorized March 2009 (Vancouver, British Columbia) –Comment Resolution May 2009 (Montreal, Qubec) –Comment Resolution, Letter Ballot Re-circulation July 2009 (San Francisco, California) –Comment Resolution September 2009 (Waikoloa, Hawaii) –Comment Resolution, LB Recirculation November 2009 (Atlanta Georgia) –Comment Resolution, LB Recirculation

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 12 TGs Activity Between Meetings TGs Activities Between Meetings Requiring Notice: –One or more face to face ad hoc meetings, requires 30 days notice (P&P clause 3.6.2). –One or multiple Teleconferences, requires 10 days notice, not more often than weekly (P&P clause 3.6.3).

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 13 TGs Activity Between Meetings Previously scheduled: –Completed: Teleconference Wednesday 10am for up to 1 ½ hours on 17 September, 1 October, 15 October, 29 October –Cancelled: TGs ad hoc, Irving, Texas, 5-7 November

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 14 Future Inter Meeting Activities Teleconferences –Teleconferences could be scheduled after the Dallas meeting, through the March 2009 Montreal 802 Plenary Meeting. –For example: 2008: Dec 3, : Jan 7, Feb 4, 18, Mar 4

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 15 Future Inter Meeting Activities Ad Hoc possibilities –We could meet somewhere before Los Angeles. –If we want an ad hoc within 30 days after the Los Angeles meeting, it needs to be authorized at this meeting. –However, travel budgets seem to be limited…

doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 16 References Earlier TGs Process Submissions –September 2008, 11-08/1049r2, Waikoloa, Hawaii –July 2008, 11-08/831r2, Denver, Colorado –May 2008, 11-08/570r2, Jacksonville, Florida –March 2008, 11-08/320r1, Orlando, Florida –January 2008, 11-08/82r1, Taipei, Taiwan –November 2007, 11-07/2812, Atlanta, Georgia –September 2007, 11-07/2398r1, Waikoloa, Hawaii September 2007, 11-07/2408r0, Līhue, Kauai, Hawaii (ad hoc) –July 2007, 11-07/2142r1, San Francisco, California –May 2007, 11-07/677r3, Montreal, Quebec Draft P802.11s D /493r27, LB#126 Comments Resolution Spreadsheet