Regional Workshop on National Water Information Systems (NWIS) and EMWIS Results of the feasibility study on the Water Information Systems in 10 Mediterranean.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Ministry of Public Sector Development Public Sector Development Program Better Government Delivering Better Result.
Sub-regional Training Workshop on
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Presentation by Ms. Siona Koti DAD Community of Practice, Yerevan, Armenia June 2011 DAD Solomon Islands: Channelling Donor Resources to the Country’s.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
NATIONAL CAPACITY BUILDING FORTHE DEVELOPMENT OF A NATIONAL IMPLEMENTATION STRATEGY FOR THE GLOBALLY HARMONISED SYSTEM OF CLASSIFICATION AND LABELLING.
Suzanne Davis Senior Research Officer – Jamaica Clearing-House Mechanism Natural History Division Institute of Jamaica.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Trapec S.A. 1 Bucharest Multi Sector – Public Private Partnership Municipality of Bucharest – February 2006 PPP Recommendation Report – Bucharest District.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
This project is funded by the European Union M EDSTAT II  Euro-Mediterranean Statistical Co-operation Introduction and objectives of the training session.
Towards Greater Accountability: Challenges and Policy Recommendations presented by: Harry Anthony Patrinos Lead Education Economist World Bank Round-table.
Project Overview, Objectives, Components and Targeted Outcomes
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
BOTSWANA NATIONAL CYBER SECURITY STRATEGY PROJECT
Participatory research to enhance climate change policy and institutions in the Caribbean: ARIA toolkit pilot 27 th meeting of the CANARI Partnership January.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
WMO Blue Peace - Water Security in the Middle East: Strategic Management of Hydrological and Meteorological Data and Information Product Generation Al-Hamndou.
Mainstreaming Gender Dimensions into Water Resources Development and Management in the Mediterranean Region GEWAMED PROJECT Presented by Barbara Tomassini.
The management of health and biomedical data in Tanzania: Need for a national scientific data policy Leonard E.G. Mboera Directorate of Information Technology,
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Ministry of State for Administrative Development Towards Meaningful ICT Indicators for Developing Countries Dr. Ahmed M. Darwish EGYPT Government and Education.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
Challenges in Data Collection and Dissemination of National Development Indicators, including MDGs The Experience of Cambodia by Lay Chhan National Institute.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
African Centre for Statistics United Nations Economic Commission for Africa Addressing Data Discrepancies in MDG Monitoring: The Role of UN Regional Commissions.
Mounir BENHAMMOU Director of Administrative and Financial Department Secretariat General of the Arab Maghreb Union EN/CSC2/2014/Pres/05.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Elisabetta Piselli Senior Counsel, LEGIA Procurement and Consultant Services.
Idaho Energy Plan Proposal (RFI) Energy Policy Institute (EPI)
Fred Berry (330) (330) Fax.
Preparatory Stakeholder Workshop - Laos 26 May 2010.
Beverly Harris Collaboration in Statistics: The Case of St. Kitts and Nevis NSDS Workshop Anguilla November 9 th
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
National Information Communication Technologies Strategy Vasif Khalafov “National strategy” working group - Web -
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
Regional Programme of Statistics in the Mediterranean Region MEDSTAT Phase II This project is funded by the European Union 1 Workshop on Data Compilation.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Team Leader, Technology Policy and Strategy, UNFCCC Mr Andrew Higham THE CANCUN AGREEMENTS, THE TECHNOLOGY MECHANISM AND TECHNOLOGY NEEDS ASSESSMENTS UNFCCC.
SERSCIDA WP2 and WP3 Marijana Glavica SEEDS kick-off meeting, 4th May 2015.
Statistical Cooperation with ENP-South Twelfth meeting of the Management Group on Statistical Cooperation March 2010 Luxembourg Agenda item 6.1.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Regional and Global Initiatives in Statistics Neda JAFAR Statistics Division, UN-ESCWA RWG of the Statistical Committee Cairo, 3 September 2007.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
D Programme Level Cooperation analysis and evaluation report (DLR) Outline & main findings.
MINISTRY OF WOMEN’S EMPOWERMENT AND CHILD PROTECTION
Capacity Building Project for Argentina’s Voluntary Peer Review
Cambodia National Work Plan
Regional Conference EU for Climate Action & Sustainable Energy in the Neighbourhood South Brussels, 20th March 2018 Implementing NDCs Andrea Rizzo.
دائرة الإحصاءات العامة
Principles of Financial Management and Disbursement
Alicia Stephen, OECS Secretariat
UNDMTP Presentation, Session V: Early Warning Symposium 24 May 2006
Mediterranean Action Plan/Barcelona Convention Current status and challenges for establishment of PRTR systems in Southern Mediterranean Countries Third.
National level Objective:
Presentation transcript:

Regional Workshop on National Water Information Systems (NWIS) and EMWIS Results of the feasibility study on the Water Information Systems in 10 Mediterranean Partner Countries Eng. Hala Zawati/easyinfo June 2006-Algeria

Presentation Topics Study background Study background Study background Study background Study Deliverables Study Deliverables Study Deliverables Study Deliverables Conclusions Conclusions Conclusions Recommendations Recommendations Recommendations

Overall objective To carry out feasibility studies of National Water Information Systems (NWIS) in 12 Mediterranean Countries involved in EMWIS. Objective Countries Duration Reasons NWIS definition Background

Countries included in the study Algeria Algeria Cyprus Cyprus Israel Israel Jordan Jordan Lebanon Lebanon Malta Malta Morocco Morocco Palestine Palestine Tunisia Tunisia Turkey Turkey Objective Countries Duration Reasons NWIS definition Background

Study duration  Starting date 1/4/2005  Ending date 30/1/2006 Objective Countries Duration Reasons NWIS definition Background

Reasons for conducting the study EMWIS started in 1999 with the main objective; “Facilitate access to the existing know-how in the water sector and develop the sharing of information along with preparation of common outputs and cooperation programs between the participating countries“. Success factor: is the information provided by participating countries. The input from countries is not as smooth, frequent or harmonized as required EMWIS believes it is caused by unavailability of efficient NWIS EMWIS initiated the first step (the feasibility study) for development of NWIS Motivate Countries and donor agencies to finance NWIS implementation Objective Countries Duration Reasons NWIS definition Background

A system that stores and processes information shared between the main national water stakeholders in a country. Usually a computerized system Considered as one of the main instruments of the national water policy. NWIS includes :   Institutional and legal information (agreements between stakeholders, ownership, copyright, legal data exchange, etc.)   Standardization and organizational information (formats, exchange and management procedures, etc.)   Could include quantitative information, maps, best practices, directories, water legislation information, and grey literature. Definition of NWIS Definition of NWIS Objective Countries Duration Reasons NWIS definition Background

Envisioned ideal NWIS Envisioned ideal NWIS

Presentation Topics Study background Study background Study background Study background Study Deliverables Study Deliverables Study Deliverables Study Deliverables Conclusions Conclusions Conclusions Recommendations Recommendations Recommendations

Study deliverables  10 country reports  Final Report

Presentation Topics Study background Study background Study background Study background Study Deliverables Study Deliverables Study Deliverables Study Deliverables Conclusions Conclusions Conclusions Recommendations Recommendations Recommendations

Conclusions Conclusions Conclusion 1: Most of the countries visited have not developed or thought of developing a national water information system, reasons are: Lack of awareness of NWIS benefits Lack of financial resources Lack of human resources Political situation. Lack of the institutional structure and technical infrastructure to collect, store and share data Absence of a political decision Unavailability of data

Conclusions Conclusions Conclusion 2: Algeria is the only country among the countries included in this study that is developing a NWIS but has not yet institutionalized the system

Conclusions Conclusions Conclusion 3: Relationships between stakeholders within the different countries range from "very close" to "nearly non-existent"

Conclusions Conclusions Conclusion 4: EMWIS NFPs were categorized based on the level of their capabilities to coordinate and supervise the NWIS in their countries into three levels:

EMWIS NFPs assessment to coordinate and implement NWIS EMWIS NFPs assessment to coordinate and implement NWIS

Conclusions Conclusions 6 Conclusion 6: The types of information that were most commonly found in all countries are; quantitative data, maps, and grey literature.

Conclusions Conclusions Conclusion 7:, common problems are: All countries are facing problems in exchanging water information, common problems are:

Conclusions Conclusions Conclusion 8: Two distinct phases in NWIS development were defined; the Pre-NWIS development phase and the NWIS development phase. NWIS pre-development phase: Survey of all water data sources.Survey of all water data sources. Monitoring of Water resources.Monitoring of Water resources. Development of Standard Operating Procedures for monitoring and data collection.Development of Standard Operating Procedures for monitoring and data collection. Usage of computers and availability of network infrastructure.Usage of computers and availability of network infrastructure. Having qualified IT staff.Having qualified IT staff. Institutionalization of monitoring by having a specialized data collection and monitoring department.Institutionalization of monitoring by having a specialized data collection and monitoring department. Internet connection availability.Internet connection availability. Web sites available for some or all stakeholders.Web sites available for some or all stakeholders. NWIS development phase : Conduct awareness campaign.Conduct awareness campaign. Obtain political decision to implement NWISObtain political decision to implement NWIS Establish a coordination committeeEstablish a coordination committee Overall NWIS Concept.Overall NWIS Concept. Select host/ coordinator.Select host/ coordinator. IT staff Capacity Building.IT staff Capacity Building. Data Classification/sharing policy.Data Classification/sharing policy. Data Collection Roles & Responsibilities.Data Collection Roles & Responsibilities. Secure Funds.Secure Funds. Feasibility Study & Design.Feasibility Study & Design. Detailed Technical Design Study.Detailed Technical Design Study. Write the TOR.Write the TOR. Develop NWIS.Develop NWIS. Validation and testingValidation and testing Institutionalization & implementation.Institutionalization & implementation. Phase 1Phase 2 Ready for phase 2

Conclusions Conclusions Conclusion 9: Countries readiness for NWIS was assessed and accordingly countries were divided according to their readiness to implement NWIS into four groups Group1: Most advanced NWIS-Ready Group2: Medium High NWIS-Ready Group3: Medium Low NWIS-Ready Group4: Still-to-be Developed NWIS

Conclusions Conclusions Conclusion 10: Launching of awareness raising campaigns in the countries under investigation is of crucial importance in order to convince their high-level decision makers of the benefits of NWIS

Conclusions Conclusions Conclusion 11: Main reasons (obstacles) behind the sometimes unreliability and intermittent provision of information to EMWIS by the countries visited can be attributed to one or more of the following: Most req. info. by EMWIS are either not readily available or need time to transfer them into digital format. Unsatisfactory relationships between stakeholders Overloaded staff Lack of WIS within countries Confidentiality of data and the political situation

Conclusions Conclusions Conclusion 12: Wherever regulations for data exchange and information provisions existed, the flow of data and response of stakeholders were much smoother and timely.

Conclusions Conclusions Conclusion 13: All the countries need assistance regarding the development of NWIS but with varying degrees.

Action opportunities for EMWIS and Donor agencies Conclusion 14: Action opportunities for EMWIS and Donor agencies

Presentation Topics Study background Study background Study background Study background Study Deliverables Study Deliverables Study Deliverables Study Deliverables Conclusions Conclusions Conclusions Recommendations Recommendations Recommendations

Recommendations to EMWIS More involvement of Stakeholders in EMWIS activities Info required by EMWIS should be classified into two categories During NWIS implementation in countries, EMWIS can subcontracts a third party to help countries prepare information for countries EMWIS site. Group meeting in Algeria around mid Subsidize Internet connections where required NWIS development can follow 3 scenarios: 1. Develop NWIS individually per country. 2. Develop one NWIS system for all countries 3. If Algeria is willing to share their source code, use it for all countries

Recommended immediate actions to EMWIS Follow up with Algeria to launch NWIS Start awareness raising campaigns Help Morocco transfer their WIS to NWIS. Help enhance Palestine and Lebanon’s readiness to NWIS level

Road Map for EMWIS to Aid in NWIS Development should take into account : -Minimizing and eliminating obstacles and problems -Capitalizing and making use of in-country on going opportunities -Carefully identifying and containing the threats to the development of NWIS -Recognizing and rectifying the weak points (gaps) Recommendations for NWIS development /enhancement

Road Map for EMWIS to Aid in NWIS Development

Cont. Road Map for EMWIS to Aid in NWIS Development

Cost estimate for developing NWIS in each country Cost estimate for developing NWIS in each country

Results of the feasibility study on the Water Information Systems in 10 Mediterranean Partner Countries