18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,

Slides:



Advertisements
Similar presentations
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
Advertisements

University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
21/22 September 2002IMACS update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 21/22 September 2002 Boston, MA.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
SDW2005, juin, Taormina The Corot Space instrument.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
“Milliarcsecond imaging in the UV- Optical domains: Preparing the way to space borne Fresnel Imagers”, Nice, Sept INSTALLING A FRESNEL IMAGER.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Telescope Integration and Tests Tuesday Afternoon.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
The Prime Focus Imaging Spectrograph Design and Capabilities
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IMACS Multi-Object Echelle B. Sutin, T. Hare & A. McWilliam & many others N *Not yet released *
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
Magellan Telescopes Observatory Report
COSMOS Status David Sprayberry, Sean Points & Jay Elias
INSTRUMENT CONTROLLER OVERVIEW
FourStar 4K x 4K JHK imager
Control System Summary of Changes Since PDR
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena, Ca

18/19 January 2003IMACS SAC meeting update2 IMACS project team: A. DresslerPr. Investigator B. BigelowInstrument Scientist B. Sutin, H. EppsOptical des./eng. B. Bigelow, T. Hare S. Gunnels, G. Luppino, R. Cleary Mechanical des. V. Kowal, R. Storts, J. CastilloMechanical fab. A. Bagish, D. Carr, J. AsaElectronics G. Burley, I. Thompson, J. EstradaDetector systems C. Birk, K. ClardySoftware eng.

18/19 January 2003IMACS SAC meeting update3

18/19 January 2003IMACS SAC meeting update4

18/19 January 2003IMACS SAC meeting update5

18/19 January 2003IMACS SAC meeting update6 Optics Status: Collimator: C01 (field lens) - C05done, installed Long Camera: L01-L06done, installed Short Camera: S01 - S09done, mounted Grisms: 200 l/mmdone, ready to mount 300 l/mmruling at RGL 600 l/mmruling at RGL

18/19 January 2003IMACS SAC meeting update7 Optics Status cont. Filters:2 sets of CTIO B,V,I,done, mounted 2 sets of CTIO Rdone, mounted CTIO U (LCAM)awaits ADC coating Sloan u’, g’, r’, i’, z’not ordered Imaging Mirrors:Al mirror mounted Ag mirror done Echellette Optics Gratingdone Prism (Zygo)IP

18/19 January 2003IMACS SAC meeting update8 Current grating selection:

18/19 January 2003IMACS SAC meeting update9 Mechanical Engineering Status: Guide camera stages (Hare)done, mounted Calibration lamp system (Hare)IP Mask server (Bigelow)done, mounted Field Lens (Hare)done, mounted Shutters (Hare)done, mounted Filter servers (Bond/Bigelow) done, mounted Disperser server (Hare)done, mounted - Grating cells (Bigelow)1 of 6 done - Grism cells (Bigelow)IP - Mirror cells (Bigelow)1 of 2 done

18/19 January 2003IMACS SAC meeting update10

18/19 January 2003IMACS SAC meeting update11

18/19 January 2003IMACS SAC meeting update12 Mechanical Engineering cont. Collimator mech. (Bigelow)done, mounted Long camera mech. (Bigelow)done, mounted Short camera mech. (Bigelow)done, assy IP Dewar (Luppino)done, mounted Instrument Structure (Gunnels)done Instrument Carriage (Gunnels)done Instrument Enclosures (Gunnels)done, minor mods IP Instrument Utility wrap (Gunnels)done Integral Field Unit (Durham)IP

18/19 January 2003IMACS SAC meeting update13

18/19 January 2003IMACS SAC meeting update14

18/19 January 2003IMACS SAC meeting update15 Electronic Engineering (Baggish): Schematics design (all motion stages)done (4) Motion control (MC) chassis, done (1) Power supply chassis, done (1) Shutter control chassisdone (2) Electronics racks for chassisdone (2) SA + FC power supply chassis*IP (2) Guider power supply chassis*IP Instr. wiring harnessesIP *new since last meeting

18/19 January 2003IMACS SAC meeting update16 Detector systems: Guide cameras: - 3 cameras in house, one loaned to LCO Science array: - First light with 7 chip array 12/10/02 - Multiple test runs, flexure testing IP - CCD copper cooling strap tuning IP - Test/integration of detector focus and flexure control IP - Electronic/software integration IP

18/19 January 2003IMACS SAC meeting update17 Software: Instrument Control (Birk) Individual module testing: ModuleGUI statusH/W tests Pr. Guiderdone80% SH guiderdone80% CF guiderdone90% Slit Mask Serverdone75% Disperser Server90%50% Long Camera Focusdone90% Filter Servers (2)done90% Flexure Controldone75% Detector Focus50%10% HP Sensor Systemdone60%

18/19 January 2003IMACS SAC meeting update18 Software: Instrument Control cont. Integrated instrument testing: - One GUI at this level, showing all critical aspects of each module (encoder positions, limit status, temperatures, etc). - This GUI is written and 90% tested, unfinished stages remain (Disperser Server, Grating tilts, detect. focus) User Level Software: - Two GUIs at this level: - Instr. control interface (select a grating, etc.) - 75% done - Graphical Instr. Status Display - 50% done

18/19 January 2003IMACS SAC meeting update19 Software: Science Array Control (Birk) Shutter control: - micro-controller for linear motors90% done CCD readout / camera control: - “ccdserver” for array readoutworking - “camgui” for user interfaceworking Quick-Look Tool: - functional with *real* data90% done

18/19 January 2003IMACS SAC meeting update20 Slit Masks: Laser mask cutting system: - high quality masks delivered to SBS for testing - some laser tuning issues remain - still debugging RS-274 (G-code) generation - syntax - storage of used masks? - order of large stock of mask blanks? - mask blanks approx. $100 each

18/19 January 2003IMACS SAC meeting update21

18/19 January 2003IMACS SAC meeting update22 Coming up: - Final assembly and testing of F/2 camera - Final integration of detector system - Fab of grism cells, mounting of grisms (3) - Fab of grating cells (5), and tilt mechanisms (3) - Power supply chassis (3), SA & FC controllers, guiders - Instrument cooling system plumbing - Thermal testing (Bally enclosure due 1/27/03) - Shipping preparations started

18/19 January 2003IMACS SAC meeting update23