Session 12 System Transactions

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

Session 8 Master Production Scheduling (MPS) – Managing the MPS lecture session 7 Example.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
Master Production Scheduling (MPS) – Basic Techniques pom
Using The MRP System. Critical Aspects of Using the MRP System 1. The MRP Planner1. The MRP Planner The persons directly involved with the MRP system.
6. Material Requirements Planning (MRP)
MRP and Related Concepts
Material Requirements Planning (MRP)
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Session 10 Material Requirements Planning pom
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Advanced Concepts in Material Requirements Planning Chapter 11.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Chapter 15 Resource Requirements Planning: MRP and CRP.
Master Production Scheduling
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Resource Planning Chapter 15.
Materials Requirements Planning
SCT Paramters 1© The Delos Partnership 2005 Supply Chain Techniques The parameters.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
Material Requirements Planning Chapter 2. MRP in MPC.
AutoSimply Process Flow. Legend System Process Manual Process System Document Manual Document Flow Connector to another slide Terminator Predefined Process.
Material Requirements Planning (MRP)
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
BUAD306 MRP/ERP.
Chapter 16 Materials Requirements Planning
MRP and ERP.
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Session 12 System Transactions The MRP Planner’s Job Transaction Example Key Transactions Concepts Procedural Inadequacies Example Complex Transactions Processing Company Examples Material Planning: Concluding Principles

The MRP Planner’s Job Primary Actions Release Orders Reschedule Open Order due dates Analyze and Update Planning Factors Reconcile Errors Problem Solving Use the system to solve critical material shortages Improve the system

Transaction Example Master production schedule The MPC system at the Duckworth Manufacturing Company is run each period to update the master production schedule (MPS) and MRP records. At the start of period 1, the MPS for end products A and B is: Master production schedule Period Number 1 2 3 4 5 6 Product A 10 - 25 Product B 20

Transaction Example: Problem 14 One unit of component C is required to manufacture one unit of either end product A or B. Purchasing lead time for component C is two periods. an order quantity of 40 units is users and no (zero) safety stock is maintained for this item. Inventory balance for component C is 5 units at the start of period l, and there's an open order (scheduled receipt) for 40 units due to be delivered at the beginning of period l. Complete the MRP record for component C as it would appear at the beginning of period 1.

Transaction Example (Continued: Component C) Period 1 2 3 4 5 6 Gross Requirements 15 20 25 10 Scheduled Receipts 40 Projected Available Balance 30 Planned Order Release Q = 40, LT = 2, SS = 0

Transaction Example Problem 14 (Continued) During period l , the following transactions occurred for component C: The open order for 40 units due to be received at the start of period l was received at the start of period 1 with a quantity of 30 ( 10 units of component C were scrapped on this order). An inventory cycle count during period l revealed that five units of component C were missing. Thus. an inventory adjustment of -5 was processed. Ten units of component C were actually disbursed (instead of the l5 units planned for disbursement to produce end products A and B). (The MPS quantity of 5 in period 1 for product B was canceled due to a customer order cancellation.) The MPS quantities for period 7 include 15 units for product A and 0 units for product B. Due to a change in customer order requirements, marketing has requested that the MPS quantity of 25 units for product A scheduled in period 3 be moved to period 2. An order for 40 units was released.

Transaction Example Problem 14 (Continued) Given this information, complete the MRP record for component C as it would appear at the beginning of period 2. What action(s) are required by the inventory planner at the start of period 2 as a result of transactions occurring during period 1?

Transaction Example (Continued) b. Component C Period 2 3 4 5 6 7 Gross Requirements 45 25 10 20 15 Scheduled Receipts 40 Projected Available Balance 20* -25 30 Planned Order Release Q = 40, LT = 2, SS = 0 *20 = 5 (Previous) + 30 (Receipt) - 5 (Adjustment) - 10 (Disbursement) The inventory planner should “expedite” the scheduled receipt from period 3 to be delivered in period 2.

Key Transactions Concepts Order Launching Allocation and Availability Checking Exception Codes Bottom-up Replanning

Procedural Inadequacies Example: Part A Consider the MRP record at right for Cactus Cups. 5 units of the scheduled receipt for 40 units due at the start of period 2 are scrapped during period 1. No scrap ticket is issued. Assume this lot isn’t counted before it’s put away in the stockroom at the start of period 2, but is recorded as a receipt of 40 units. What impact will these actions have on factory operations? Period 1 2 3 4 5 6 Gross requirements 25 30 15 10 Scheduled receipts 40 Projected Available Balance 35 20 Planned order releases Q = lot-for-lot; LT = 5; SS = 0

Procedural Inadequacies Example: Part B Without recording the scrap, the MRP record will appear as it does in the previous slide. If the scrap had been reported, it would be: The 5 unit shortage may not be discovered until period 4. At that time, it will be necessary to expedite the scheduled receipt of 15 from period 5 into period 4, and cover the deficiency in period 6. Period 1 2 3 4 5 6 Gross requirements 25 30 15 10 Scheduled receipts 35 Projected Available Balance -5 Planned order releases Q = LFL; LT = 5; SS = 0

MRP Record Relationships for Several Parts

Example MRP Record

Jet Spray MRP System Inquiry (part S3273) – Bucket-Less System

Jet Spray MRP System Exception Messages (part S3273)

Concluding Principles Effective use of an MRP system allows development of a forward-looking (planning) approach to managing material flows. The MRP system provides a coordinated set of linked product relationships, thereby permitting decentralized decision making on individual part numbers. A1l decisions made to solve problems must be done within the system, and transactions must be processed to reflect the resultant changes. Effective use of exception messages allows focusing attention on the "vital few," not on the "trivial many." System records must be accurate and reflect the factory's physical reality if they're to be useful. Procedural inadequacies in processing MRP transactions need to be identified and corrected to ensure material plans are accurate.