Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.

Slides:



Advertisements
Similar presentations
11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
SQXF Instrumentation wires and connectors. Instrumentation & Quench heaters wires March 2014 J.C. Perez2 Instrumentation wires: AXON reference HH2619.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Susana Izquierdo Bermudez. With many contributions from Juho Rysti, Gerard Willering and all the people involved in the manufacturing and test of the magnet.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.
Cosine-theta configurations for S.C. Dipole Massimo Sorbi on behalf of: INFN LASA & Genova Team Giovanni Bellomo, Pasquale Fabbricarore, Stefania Farinon,
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
TQS Overview and recent progress
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HO correctors update Massimo Sorbi and Marco Statera
Quench estimations of the CBM magnet
ESAC Review February 2013 CEA Saclay
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
ERMC/RMM activities May 2017
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
To be presented at Nb3Al R&D Review,
Protection Database Tool
the MDP High Field Dipole Demonstrator
Quench Protection Measurements & Analysis
Analytical Cost Model (16 T dipole)
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
QXF schedule and milestones
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Quench calculations of the CBM magnet
Presentation transcript:

Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014

Agenda Coil electrical checks Winding test updates Nb 3 Sn-Nb-Ti splice: procedure and fixture Single vs. double NbTi leads Wire for instrumentation 29/01/2014 P. Ferracin2

29/01/2014 P. Ferracin3

Product description 1.1 Technical specification of the capacitive discharge generator Other requeriments: HV Lemo connector or two separate terminals for power output connection. BNC analog output of voltage. Non – inductive resistive divider for output voltage measurement. Capacitor bank discharge with time constant between 30 s and 60 s. Re-arm pulser. Emergency button which cuts mains and short circuits capacitors. Switch off command to discharge the capacitor bank in less than 1 s. Graphical plot of output current vs time or output voltage vs time. USB port for data storage. Output voltage7000 VmaxOutput capacitance2 μFMinimum load inductance0,5 mHPeak current of the discharge100 AmaxDinamic range100 V to 7000 V Setting resolution±10 VDeviation between setpointand output value±1% at Vmax increasing linearly up to ±10% at Vmin 29/01/2014 P. Ferracin4

Splicing and tinning tooling 23/01/2014 J.C. Perez5 The same tooling will be used for tinning and splicing using MOB 39 as flux and solder 96/4 Tin/Silver

Splicing tool assembly sequence for tinning and cutting operations 23/01/2014 J.C. Perez6 Cutting Tinning Tool assembly Clamping Courtesy of Nicolas Peray

Splicing configuration 23/01/2014 J.C. Perez7

Flux and soldering alloy used at CERN Main issue: presence of an oxide layer after reaction. How to remove this oxide layer? – Activated fluxes: Improve solderability ×But the residue left can lead to corrosion ×Essentially banned at CERN – In SMC and RMC the splicing region is cleaned with a soft stainless steel brush MOB 39 offers the best results of the non-activated fluxes tried at CERN. Preferred soldering alloy: Sn 96.5% Ag 3.5%, T m = 221 o C Sn96.5Ag3.5 + MOB 39 is used for: – Pretinning the NbTi and Nb3Sn cables – The actual Nb 3 Sn/NbTi splice 29/01/2014 P. Ferracin8

Instrumentation & Quench heaters wires 23/01/2014 J.C. Perez9 Instrumentation wires: AXON reference HH2619 LH Conductor diameter mm (0.15 mm 2 ) Conductor composition: Copper silver plated External wire diameter: 0.95 mm Wire insulation: polyimide tape wrapped (glued with a thin layer of fluoopolymer) Nominal voltage : 1000V AC Axon voltage test: (2*U N )+1000V= 3 kV Approx. price: 2220 €/km Quench heaters wires: AXON reference H 1619 L Conductor diameter 1.5 mm (1.34 mm 2 ) Conductor composition: Copper silver plated External wire diameter: 1.8 mm Wire insulation: polyimide tape wrapped (glued with a thin layer of fluoropolymer) Nominal voltage : 600V AC Axon voltage test: (2*U N )+1000V= 2.2 kV Approx. price: 4500 €/km

Updated status and possible plan 1.28/10-01/11, fabricate short plastic poles (BEND poles), 1 set 2.28/10-01/11, Wind/cure outer layer short Cu coil 3.28/10-01/11, Update BEND inner/outer layer spacers after short winding test /11, Update ROXIE/CAD inner/outer layer spacers /11, Fabrication inner/outer layer BEND/ROXIE plastic spacers (v3) for FNAL /12, Insulation of CERN Cu cable /12, Fabrication inner/outer layer ROXIE plastic spacers (v3) for CERN 8.06/01-17/01, Fabrication inner/outer layer ROXIE/BEND plastic spacers (v3) for LARP /01, LARP to wind 1st short coils (ROXIE LE/BEND RE) with plastic parts /01, CERN to wind 1 short coils (ROXIE) with plastic parts /02, Update ROXIE (v4) /02, LARP to wind 1sd short coils (ROXIE RE/BEND LE) with plastic parts /02, Update BEND (v4) and decision /12, Delivery 6 poles to FNAL /01, Delivery of 2 sets metal spacers (arrival 07/02/14) for CERN and FNAL /02, Launch procurement 1 set of metal spacers for FNAL /02, Launch procurement 5 sets of metal spacers for FNAL/CERN (market survey completed) /02, Launch the price inquiry for 3 sets of CERN poles /02, arrival of 2 sets of Cu wedges 29/01/2014 P. Ferracin10

CERN W&C tooling status All delivered and cleaned Next week assembly 29/01/2014 P. Ferracin11

CERN tooling status R&I tooling – Parts ordered Step files requested Nb-Ti lead related parts on hold – Expected in late March (1 reaction set) – end of April (the rest) CERN wedges – Expected by mid-March Work in progress to meet tolerances requirements 29/01/2014 P. Ferracin12

Susana Izquierdo Bermudez Field in Nb3Sn-Ti splice region 13 Magnetic Yoke & Pad =975 mm Non magnetic Pad =350 mm Non magnetic Pad = 225 mm

Susana Izquierdo Bermudez Field at the ends decay very quickly The fringe field of the magnet is negligible compared with the self-field of the interconnection 14 Field in Nb3Sn-Ti splice region Problems can be decoupled  Field in the interconnection can be computed analytically and/or with a very simple model I (kA)B p (T) (ANSYS*) B p (T) (ROXIE**) “Recycling” a very simple model I did for the LHC main interconnections * Does not consider iron and the rest of the leads ** Does not account for current flow in between cables Design Parameter for Nb-Ti lead: B p = 2T Current distribution

Nb-Ti leads parameters (from Luc) Strand: mm LHC strand, 1.6 Cu/SC ratio Cable: 34 strands, width of mm and a mid-thickness of 1.92 mm. Field – In the nominal conditions (17.5 kA) we expect a field in the splice area of ~1.5 T – In the short sample condition (21.2 kA) we can say that the field in the splice area the field is ~2 T Critical current – Luc estimated approximately what would be the critical current of the cable 17 kA at 10 T and 1.9 K as high as 60 kA at 2 T and 1.9 K (to be confirmed) 44 kA at 2 T and 4.2 K 39 kA at 3 T and 4.2 K 19/12/2013 P. Ferracin15

Comparison End Spacer Heat treatment

beforeafter

beforeafter

beforeafter

beforeafter

beforeafter