Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014.

Slides:



Advertisements
Similar presentations
Chapter 26: The Magnetic Field
Advertisements

Fiber Optic Temperature Sensing in the Walker Basin: From Seedbeds to Seepage Scott W. Tyler University of Nevada, Reno Dept. of Geologic Sciences and.
Summary of the end part design process using BEND R. Bossert February 14, 2013.
Key factors determining the extent of tsunami inundation – Investigations using ANUGA Biljana Lukovic and William Power GNS Science, Lower Hutt, New Zealand.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Copyright © 2009 Pearson Education, Inc. Lecture 8 - Magnetism.
Yung Loo FCC: GIS & Tunnelling Update.
Infrastructure & Operation 27 th May 2015 Infrastructure & Operation 27 th May 2015 Update on optimisation of tunnel footprint and location Charlie Cook.
TOT-FCC: Tunnel Optimisation Tool for the Future Circular Collider Introduction and lessons learnt C. Cook, J. Osborne, P. Lebrun, Y. Robert, M. Jones,
Assignment 5. Locating plate boundaries on Trafalmador.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Interaction Region Studies for a Linear Collider at CERN - Detector ‘push-pull’ slab design - Cavern assessment Matt Sykes.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Contents Scope of Work and Work Stages
When charged particles move through magnetic fields, they experience a force, which deflects them Examples of such particles are electrons, protons, and.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
WeADAPT Principles of Adaptation Ben Smith and Tahia Devisscher SEI Oxford.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Using GIS to apply Paramelle’s method to the search for water in karst terrain Patricia Bobeck, M.A., P.G. CE 394K.C GIS in Water Resources November 17,
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Topographic & Geologic Maps Plus: Latitude and Longitude!
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
5 December 2011 Task 2 Cavern Study Ground model and 3D cavern layout Matt Sykes Eden Almog Alison Barmas Yung Loo Agnieszka Mazurkiewicz Franky Waldron.
Matt Sykes Andy Kervell Yung Loo Heidi Clough Craig Sturzaker ARUP: Update on GIS Model and tunnel options under lake.
New road out of Auckland choked with traffic Sun, 25 Jan 2009 News: National Otago Daily TimesNews: National The toll road to ease congestion north of.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
Chapter Menu Lesson 1: Reading Maps
RISK ASSESSMENT FCC draft, 2. September 2015.
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
FCC Civil Engineering Optimisation and Design Development
CLIC Civil Engineering Update
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Geodesy and the FCC Project
CLIC Civil Engineering & Infrastructure
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Acknowledgements to all FCC study teams
Assignment 2. Locating plate boundaries on Trafalmador.
5th FCC Infrastructure & Operation meeting
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
Tunnelling under lake Geneva
Civil Engineering for FCC-eh IR
CLIC Civil Engineering Update
Combatant Design and Fleet Mix Assessment and Optimisation using BAEFASIP Dstl/CP Chris Brett, Dstl, UK Dr Malcolm Courts, BAE Systems Maritime,
Assignment 4. Locating plate boundaries on Trafalmador.
Overview of Day One – 29 Feb 2016
Particles from Space AH Physics Q&W.
Layout: Introduction. About the Project. Study area.
Topographic Maps.
FCC Week 2019 Civil Engineering Summary
JLEIC Accelerator R&D Meeting
Presentation transcript:

Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014

2 Contents Preliminary findings: Investigation of FCC Hadron Injector (FHI) & geo/tunnelling impacts for 83km/100km ring siting Geology/CE Studies Progress Flow 100km - Circle and Racetrack – optimised alignment options within study area limits 83km - Circle and Racetrack – optimised alignment options within study area limits Alternatives and FHI constraints

Geology - Definition of key variables and investigation boundaries -Terrain, overburden -Broad Ground Conditions which have engineering impact (Moraine, Molasse, Cretaceous, Faults) -Hydrology (Lake, Rivers) Preliminary Machine Requirements -Tunnel Length -Tunnel Shape -Tunnel Depth -Tunnel Slope -Location of Experimental Halls/Access Shafts Updated aims and requirements e.g. laser straight, corrections for ellipsoid Updates on data constraints Key decision output choices GIS Useability / Accessability / Transfer of Knowledge BIM TOOL DECISION AID BRGM Cretaceous Seismics Bathymetry data Tool functionality CE constructability Tunnelling, Geotechnics, Programme Interfaces Requirements FHI requirements Experimental groups Iterations of constraints/requirements  assessment of a most feasible solution Performance Design Requirements / Design Basis (offline data manipulation) Excel GIS INITIAL PROJECT VARIABLES & ASSUMPTIONS ITERATIONS BIM tool export Model Updates Assessments & Studies FCC - Geology/CE Studies Progress Flow

4 100km Circle: Study Boundary Limits - North To minimise connection distance of injection tunnel between LHC and FCC, beneficial to locate ring further east but constrained by Chablais Potential alignment optimisation with tilt, but unlike with LHC slope (solely to reduce Jura impact). FCC - A beneficial tilt in one direction would be a negative tilt in another: - i.e. three main mtns, Jura, Saleve, Pre Alps Chablais (+Le Vuache) - Any tilt is also constrained by The Rhone FHI ImpactsGeo/Tunnelling Impacts Positives Possibility of good near parallel injection tunnel length into LHC P3, P4, P5. Negatives 10km spacing of detector caverns/shafts not possible due to alignment spacing between Pre Alpes du Chablais crossing (1km deep shaft) and lake Lake bed deeper Top of molasse deeper NE of ring moves out of Valee de L’Arve corridor into Chablais

5 100km Circle: Study Boundary Limits - North - General Scenario of Crossing near P3-P5 Riverbed Molasse Rockhead 370 mASL * AzimuthSlope mASL at Lake Av. mASLRationale mASL near crossover P3-5, mASL P3-5/FCC distance Scenario 1a00150 top of molasse under lake150 Scenario 1b00280 Bottom of riverbed280 Scenario top of molasse under lake, bottom of the Rhone Scenario top of molasse under lake, bottom of the Rhone, tunnel depth low under Jura

6 Scenario 1

7 Scenario 2

8 Scenario 3

9 100km Racetrack: Study Boundary Limits - North Same issues as 100km Circle. In addition: - Northern Limit is constrained by southern extent of racetrack crossing into Grand Saleve (no benefit of crossing further north into Saleve) - At NW extent of investigation area, Jura outcrops back towards Lake. Need to move ring further east into Pre Alpes du Chablais to avoid this. - Western edge continuously skirts Jura – high interface risk. Likewise, pushing ring further east enters Chablais. However potential advantageous straight parallel alignment into P3,P4

10 100km Circle: Study Boundary Limits - South Savings in tilt but constrained by the Rhone and Les Usses FHI ImpactsGeo/Tunnelling Positives Ring will pass under LHC, with potential good connection for injection tunnel (FCC passes near perpendicular to Point 1(and P7)). Lake bed shallower Top of molasse shallower Completely avoids Jura* Avoids Pre-Alpes du Chablais + Negatives *(enters Le Vuache) + (lies in the foothills not Valee de L’Arve corridor between Saleve and Pre Alpes) Starts to skirt Bornes-Aravais mtns to SE (current uncertainty in geological data) Molasse tapers out as situated towards extreme southern tip of basin – Ground becomes more heterogeneous and faulted, more uncertainty and risk for tunnelling and shaft sinking.

11 100km Circle: Study Boundary Limits - South - General Scenario of Crossing near P1 Riverbed Molasse Rockhead 370 mASL AzimuthSlope mASL at Lake Av. mASLRationale mASL near crossover P1, mASL P1/FCC distance Scenario 1a00210 top of molasse under lake m Scenario 1b00320 Bottom of riverbed m Scenario top of molasse under lake, bottom of the Rhone, les usses Tilted into southern mountains (Vuache, Bornes, Saleve) m

12 Scenario 1

13 Scenario 2

14 100km Racetrack: Study Boundary Limits - South A B A B Limited capacity for movement. Bound strictly by Jura, Vuache, Bornes Poor connection at Point 1, esp. option B

15 83km Circular - General Scenario of Crossing at P1 Riverbed Molasse Rockhead 370 mASL AzimuthSlope mASL at Lake Av. mASLRationale mASL near crossover P1, mASL P1/FCC distance Scenario 1a00270 top of molasse under lake m Scenario 1b00330 Non-inclined, Bottom of riverbed, bottom of the Rhone m Scenario Sloping high point in Borne/Saleve. Limited by Les Usses. Goes through de l’Arve (connectivity of flow not as influential as under lake) m

16 83km Circular - General Scenario of Crossing at P1 Circular – Current default plan position near optimum Well positioned directly beneath and inline with P1 Positioned well at shallower southern end of lake Well positioned east away from Jura

17

18

19 83km Racetrack - General Scenario of Crossing at P1 Riverbed Molasse Rockhead 370 mASL AzimuthSlope mASL at Lake Av. mASLRationale mASL near crossover P1, mASL P1/FCC distance Scenario 1a (83km-R2) | Top of molasse under lake m Scenario 1b (83km-R2) | Bottom of riverbed, bottom of the Rhone m

20 Scenario 1

21 Scenario 2

22 FCC-LHC Hadron Injection Constraints (1) - “Required injection straight length is a function of the vertical height difference between LHC and FCC at P1 and the magnet technology” - “For 20 – 200 m height difference and reasonable magnet technologies get about 0.5 to 1.5 km injection straight length per beam” To achieve these tolerances: Possible with 100km option but higher engineering risk More feasible to achieve shallow (50-100m) height differences and shorter injection straight lengths with 83km option. Both racetrack and circular options can be preferentially tilted and orientated to achieve much more satisfactory crossover relationships. Need to consider non-molasse boring options Can be better constrained through understanding dipole designs/injection approach limits

23 FCC-LHC Hadron Injection Constraints (2) - First Version of the Geology Tool should be imported onto CERN database this week - Working meeting with CE and Hadron experts to be arranged for coming weeks to study options in more detail. Who should be invited ?