1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Winter Workshop, San Diego Mar 16, 2006Angelika Drees Short- and Long-term Future of RHIC Introduction Luminosity, Luminosity Limitations Runs so far and.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Thomas Roser NSAC subcommittee April 4, 2005 Facility Strategy RHIC performance overview Luminosity and polarization evolution (towards “enhanced luminosity”)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC present status, and plans Wolfram Fischer 12 May 2011 Opportunities for Drell-Yan Physics at RHIC, BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Machine - Experiments January 12, 2005 Machine status.
Machine-Experiments January 19, 2005 Machine status.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
Heavy Ions in RHIC – How to get to higher Luminosities? Angelika Drees APS DNP Fall meeting Oct. 30, 2003 I.Accelerator Basics II.Luminosity Limitations.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
1 Beam Induced Pressure Rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz. P. He, H.C. Hseuh, H. Huang, U. Iriso-Ariz, L. Smart, S.Y. Zhang 13 th ICFA.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 Electron clouds and vacuum pressure rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz, H. Huang, H.C. Hseuh, U. Iriso, S. Peggs, G. Rumolo, D. Trbojevic,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner Hall 3 December 2003

Wolfram Fischer 2 Enhanced luminosity Enhanced Luminosity Goals (before e-cooling) –For Au-Au, average per store (4  design) L = 8  cm -2 s -1 at 100GeV/u –For p  -p  average per store, 2 IRs (16  design) L = 6  cm -2 s -1 at 100GeV L = 1.5  cm -2 s -1 at 250GeV with 70% polarization

Wolfram Fischer 3 Contents 1.Assumptions for projections 2.Limitations and improvements Injectors Luminosity and background Time at store 3.Run year projections 5.Summary

Wolfram Fischer 4 RHIC Collider Projections [annual updates based on experience gained in the previous run]

Wolfram Fischer 5 Assumptions for projections 2 weeks for cool-down, 1 week for warm-up For each mode (Au-Au, p  -p , d-Au, etc.) –2 weeks of set-up [only machine operation] –3 weeks of ramp-up [machine operation with experimental set-up during owl shift] –Continuous luminosity development in production [over 14 weeks during the day] Minimum and maximum projections –Minimum repeats demonstrated performance –Maximum requires completion of improvement projects –Maxima ambitious, likely outcome between min and max For 5-year luminosity projections –5+14 weeks of operation in each mode –Only 2 collisions in p-p operation  Large penalty for frequent mode switches

Wolfram Fischer 6 Collider performance comparisons 14 wks M. Lamont 14 wks Common features - long runs (>14 wks/yr) - non-linear increase after shut-downs - many years for substantial increases RHIC is of comparable complexity!

Wolfram Fischer 7 Limitations (1) – injectors Bunch intensity and polarization –Achieved: Au 0.7  10 9 /bunch 10  m0.3eV·s Booster low level rf upgrade Additional bunch merge  1.3  10 9 /bunch –Achieved: p 0.8  /bunch 10  m0.3eV·s 40% pol. –Achieved: p 2.0  /bunch 20  m0.5eV·s 20% pol. ? AGS warm helical snake in Run-4  40% pol. in RHIC AGS cold helical snake in Run-5  70% pol. in RHIC Later –New solenoid for polarized source –2 nd AGS cold helical snake? EBIS (Electron Beam Ion Source) –Earliest 2008, see presentation by J. Alessi

Wolfram Fischer 8 Limitations (2) – luminosity and background Vacuum problems with high intensities  Test of NEG coated beam pipes (low SEY, pumping)  Solenoids Losses during ramp  Better orbit, tune, coupling, chromaticity control  PLL tune meter, tune feedback Experimental background  Secondary collimators (½ this year, ½ next)  Shielding (PHENIX, BRAHMS this year) Instabilities  Improved chromaticity control, coherence monitor  Transverse damper Intra-beam scattering (Au-Au)  Stochastic cooling development  e-cooling for RHIC II

Wolfram Fischer 9 Limitations (3) – time in store Reduction of quench occurrences  Reduce abort kicker pre-fires  Avoid excessive beam losses Improve operational efficiency  Faster down ramps (gain about 2 days/run)  More automation at beginning of store (steering, collimation, gap cleaning)  Better software tools for ramp tuning  Faster injection set-up Reduce system downtime  Eliminate ice ball maintenance at current leads  Improve corrector power supply reliability  Improve AtR reliability …

Wolfram Fischer 10 Run-4 goals President’s budget allows for 27 weeks of cryogenic operation (need 3 weeks for cool-down and warm-up) Run-4 modes: weeks Au-Au at 100GeV/u beam energy, target luminosity of 300(  b) -1 delivered 2.5 weeks p  development (partial warm AGS snake, gas jet, working point)

Wolfram Fischer 11 Run-4 goals experimental target [after 5 weeks of start-up and ramp-up]

Wolfram Fischer 12 Current status RHIC Run-4 5-week start-up/ramp-up period started on Monday 12/1/03 Reached 0.8·10 9 /bunch in Blue on Monday Blue: Injected 111 bunches with 0.5·10 9 /bunch (pressure rise in bi8 and bo2, up to Torr) Yellow: Injected 111 bunches with 0.1·10 9 /bunch (no pressure rise observed) First ramps this morning –6 bunches each –50% Blue transmission –40% Yellow transmission Today at noon

Wolfram Fischer 13 Projected 5-year Au-Au luminosity evolution Assume - 14 weeks production in every year - linear luminosity increase during run - 4 experiments - completion of improvements achieved projected maximum

Wolfram Fischer 14 Projected 5-year p-p luminosity evolution Assume - 14 weeks production in every year - linear luminosity increase during run - only 2 experiments - completion of improvements achieved projected maximum

Wolfram Fischer 15 Major RHIC improvements Injectors Luminosity and background Time in store New things to be filled in as we understand the machine better

Wolfram Fischer 16 Summary Enhanced Luminosity Goals (before e-cooling) –For Au-Au, average per store (4  design) L = 8  cm -2 s -1 at 100GeV/u –For p  -p  average per store, 2 IRs (16  design) L = 6  cm -2 s -1 at 100GeV L = 1.5  cm -2 s -1 at 250GeV with 70% polarization Required –Sufficient running time in each mode [many weeks/year] –Resources to carry out improvement projects