SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.

Slides:



Advertisements
Similar presentations
HIRES Technical concept and design E. Oliva, HIRES meeting, Brera (Milan, Italy)1.
Advertisements

1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
Echelle Spectroscopy Dr Ray Stathakis, AAO. What is it? n Echelle spectroscopy is used to observe single objects at high spectral detail. n The spectrum.
Adding a LASER Frequency Comb to NIRSPEC Peter Plavchan, NExScI Keck Science Meeting 2009.
Calibration for LHAASO_WFCTA Yong Zhang, LL Ma on behalf of the LHAASO collaboration 32 nd International Cosmic Ray Conference, Beijing 2011.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
UVES The Ultraviolet & Visible Echelle Spectrograph John Pritchard ESO p2pp3 Workshop: UVES Overview | | John Pritchard.
K-Space Associates, Inc. kSA BandiT: Band-edge Thermometry.
FMOS Observations and Data 14 January 2004 FMOS Science Workshop.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
Astronomical Spectroscopy
A Preliminary Cycle 1 Calibration Plan for the JWST Science Instruments James Muzerolle.
Naoyuki Tamura (University of Durham) Expected Performance of FMOS ~ Estimation with Spectrum Simulator ~ Introduction of simulators  Examples of calculations.
2.4m Telescope Group Yunnan Observatory of CAS Status of LiJET Project & The Coude Echelle Spectrograph for the Lijang 1.8m Telescope China-Japan Collaboration.
Memorandam of the discussion on FMOS observations and data kicked off by Ian Lewis Masayuki Akiyama 14 January 2004 FMOS Science Workshop.
AAO Fibre Instrument Data Simulator 10 October 2011 ROE Workshop 2011 Michael Goodwin Tony Farrell Gayandhi De Silva Scott Smedley Australian Astronomical.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Blue: Histogram of normalised deviation from “true” value; Red: Gaussian fit to histogram Presented at ESA Hyperspectral Workshop 2010, March 16-19, Frascati,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
SSWG Meeting #15: May 2006, Cape Town SSWG #15: 7 & 8 May SSWG Agenda: Sunday 7 th May 1.Welcome. Minutes of Previous meeting. Matter arising (David)09:00.
14 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
18 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
Integral Field Spectroscopy. David Lee, Anglo-Australian Observatory.
Dec 8, Line Widths/ Resolution (1) ThAr UNe Sky Solid: fiber 150 Open: fibers 10/290 Each point is median of results from lots of frames (few per.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
INSTRUMENTATION/ OID / L. Pasquini/ 1 ____________________________________________________________ FLAMES COORDINATION AND INTERFACES. FIELD CORRECTOR.
Solutions for Quality Control of multi-detector instruments SPIE Marseille, 25 June 2008 Solutions for Quality Control of multi-detector instruments and.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
SAMS Project David Buckley, Hitesh Gajjar & John Menzies May 2014.
Stabilization of Focus at ATF2 David Urner University of Oxford.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
Subaru/FMOS Commissioning: Brief history & current status Naoyuki Tamura Instrument scientist Subaru Telescope, NAOJ Expected performance Observation “A.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Data products of GuoShouJing telescope(LAMOST) pipeline and current problems LUO LAMOST Workshop.
30 Nov 2005User Committee1 Instruments: NAC. 30 Nov 2005User Committee2 Instruments: NAC.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Can we find Earth-mass habitable planets orbiting our nearest star, α Centauri? John Hearnshaw, Dept. of Physics and Astronomy University of Canterbury.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
IMACS Multi-Object Echelle B. Sutin, T. Hare & A. McWilliam & many others N *Not yet released *
Astronomical Observational Techniques and Instrumentation
Status DETECTORS: -Baseline for 2mm: -Baseline for 2mm: NICA 5a (144 pixels, IRAM, 30nm sputtering); average sensitivity: 6mK/Hz 0.5 (1Hz) corresponding.
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
SALT Board Meeting #19: May 2006 Board Meeting #19: 8-9 May Astronomy Operations Now 3 SOs: Fred, Sandisa, Lucian (Francois resigned), with Charl.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
Astronomical Observation part II. Spectometry Jubee Sohn
A.Zanichelli, B.Garilli, M.Scodeggio, D.Rizzo
GLAST Large Area Telescope:
RF interlocks for higher intensities (LMC 15 June)
INSTRUMENT CONTROLLER OVERVIEW
Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph
Launch and On-orbit Checkout
Presentation transcript:

SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014

HRS Timeline 40 foot shipping container to SALT on 3 September foot shipping container to SALT on 3 September 2013 Unpacked & re-assembled instrument over next 3 weeks Unpacked & re-assembled instrument over next 3 weeks Fibres routed to payload & connected to FIF on 27/28 September Fibres routed to payload & connected to FIF on 27/28 September First Light on 28 September First Light on 28 September Commissioning & Science Verification through April Commissioning & Science Verification through April Final software arrived in April Final software arrived in April Began fully-charged HRS science observations in May Began fully-charged HRS science observations in May

Fibre Instrument Feed & Guider Both designed & built by SAAO/SALT Both designed & built by SAAO/SALT Working well & we hope to eventually replace the RSS guider with a copy of the FIF one Working well & we hope to eventually replace the RSS guider with a copy of the FIF one

Spectral Resolution Resolving power (R) varies over the échellogram, due to anamorphic magnification from the grating Resolving power (R) varies over the échellogram, due to anamorphic magnification from the grating Table gives specified R at central blaze wavelength for each order & the median R values measured from arc spectra for the blue & red channels Table gives specified R at central blaze wavelength for each order & the median R values measured from arc spectra for the blue & red channels All the modes comfortably beat the specification All the modes comfortably beat the specification MODESPECIFICATIONACHIEVED Low Resolution Medium Resolution High Resolution High Stability P-fibre High Stability O-fibre

Instrument Throughput Measured prior to installing the fibres Measured prior to installing the fibres From the fibre input ends to the CCDs From the fibre input ends to the CCDs Used a 50 micron F/4.2 to simulate input beam from the telescope + a calibrated photodiode for a detector Used a 50 micron F/4.2 to simulate input beam from the telescope + a calibrated photodiode for a detector 4 narrowband LEDs: 460 & 505 nm in the blue & 625 nm in the red 4 narrowband LEDs: 460 & 505 nm in the blue & 625 nm in the red Also checked fibre cable transmission losses at 460 nm using HS fibres, as expected from fibre specs Also checked fibre cable transmission losses at 460 nm using HS fibres, as expected from fibre specs

Instrument Throughput HRS fibres & comparable fibre-fed échelles HRS fibres & comparable fibre-fed échelles

Total Throughput (HRS+SALT) A V=8 K2V RV standard star was observed on a photometric night with 1.5” seeing A V=8 K2V RV standard star was observed on a photometric night with 1.5” seeing The blue channel performance is in good agreement with the SALT HRS Exposure Time Calculator predictions The blue channel performance is in good agreement with the SALT HRS Exposure Time Calculator predictions

Total Throughput (HRS+SALT) The SALT HRS Exposure Time Calculator yields estimates that are ~10% too high in the red channel The SALT HRS Exposure Time Calculator yields estimates that are ~10% too high in the red channel This requires investigation & the ETC will be updated as needed This requires investigation & the ETC will be updated as needed

HRS Temperature Control Red = inner room, blue = HRS electronics room, yellow = large spectrometer room Red = inner room, blue = HRS electronics room, yellow = large spectrometer room Bumps due to daily vacuum tank pumping Bumps due to daily vacuum tank pumping Maintaining a constant temperature in the HRS inner room is critical for RV stability, peak-to-peak amplitude now <0.5C Maintaining a constant temperature in the HRS inner room is critical for RV stability, peak-to-peak amplitude now <0.5C

Arc Line Stability Normalised flux of internal arc lines over 3.5 days, the line stability requirement is 10% (rms) over 12 hours: Normalised flux of internal arc lines over 3.5 days, the line stability requirement is 10% (rms) over 12 hours:

Arc Line Stability Line width measurements over 3.5 days, the stability requirement is 1% (rms) over 12 hours: Line width measurements over 3.5 days, the stability requirement is 1% (rms) over 12 hours:

High Stability Frames Sky Flat + Iodine Cell Simultaneous ThAr Internal HS Arc

Assorted HRS Frames Blue MR ThAr+Ar Arc Red LR ThAr+Ar Arc Red HR QTH Flat V=16.5 CSPN

HRS SV Results & Feedback “We think that the spectra obtained at SALT HRS are good quality and correspond to what we expected. We will be happy to continue to use this spectrograph.” – Vladimir University of Central Lancashire “We think that the spectra obtained at SALT HRS are good quality and correspond to what we expected. We will be happy to continue to use this spectrograph.” – Vladimir University of Central Lancashire

HRS SV Results & Feedback “HRS iodine agrees beautifully with the other FTS scans! See attached.” – David SAAO

HRS MMI – Astronomer GUI SALT Astronomers are now running the instrument SALT Astronomers are now running the instrument

Technical Challenges Overcome Installed & commissioned a whole new instrument!! Installed & commissioned a whole new instrument!! Shipping injuries: Shipping injuries: – Blue CCD misaligned – Blue CCD misaligned – Broken HS mode fibre – Broken HS mode fibre Since being at SALT: Since being at SALT: – Mode selector failure – Mode selector failure – Dewar warm-ups – Dewar warm-ups Temp control issues Temp control issues All of this has been Hugely educational for the local HRS instrument team! All of this has been Hugely educational for the local HRS instrument team!

Remaining Tasks Replace cryo-cooler filter/dryers to stop dewar warm-ups Replace cryo-cooler filter/dryers to stop dewar warm-ups Improve insulation & verify temp stability Improve insulation & verify temp stability Improve dewar hold times with ion pumps Improve dewar hold times with ion pumps Final software ATP Final software ATP Upgrade SALT Cal Sys Upgrade SALT Cal Sys Calibrate iodine cells Calibrate iodine cells Finish documentation Finish documentation Deliver Quick-Look Deliver Quick-Look Issue final version of commissioning report Issue final version of commissioning report

The Last Word...