Processing Major Repair Application from DSS School REO’s Perspective 1.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

COMPANY MAINTENANCE MANUAL
ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Managing the Health and Safety of Contractors
Technical Advice from Architectural Services Department
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Historic Buildings Grant-Aid Scheme Details Built Heritage Directorate NIEA.
Insert department name via ‘View/Header and Footer…’ Centre Operation EMR Warranty April 2012 Warranty from Reefer Unit / Genset repairs.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
ADS 211: Biosafety Procedures for Genetic Engineering Research Draft USAID Guidance.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
1 Sharing Session for Small NGOs on the Lotteries Fund Prepared by Lotteries Fund Projects Section April 2010.
Development plan and quality plan for your Project
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
ZHRC/HTI Financial Management Training
Periodical Purchasing Julie V. Rivera. Brownsville ISD Procurement Guidelines Following established policies and administrative guidelines, the following.
1 Education Bureau Jan 2013 Trading Operations in Schools Fundamental Principles and Relevant Guidelines.
I/3 Budget FY 2008 Department Request Training Nickie Whitaker Department of Management August 14, 2006.
BRC Food Safety Quality Management System Training Guide
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Financial Resource Management Recommended Best Practices Training for Volunteers and Support Groups.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Budget Integration to Governmental Accounting Reports.
Granting Process Slide Show ANU COLLEGE OF ARTS & SOCIAL SCIENCES.
1. TimeContent 2:15 – 2:30Registration 2:30 – 3:00Revised arrangement for MR / ER for aided schools by TSE Lap Wa Anchor, EDB 3:00 – 4:00Procedure on.
1 1. Applying for non-recurrent grants to carry out MR / ER 2. Delivery of approved major /emergency repairs projects 3. Misc - tree management, change.
Session -2 Role of Treasury in Budgetary Control of the State Regional Training Institute, Ranchi Structured Training Courseware on Treasury Inspection.
11 Implementation Details of the Improvement Measures to Strengthen the Financial Management of DSS Schools 24 September 2012.
Specification & Quantities Estimating
Diocesan Maintenance Scheme The Beginners Guide Ian Tomkin.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Information for External Examiners involved in Academic Collaborative Provision - 12 Nov 2014.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Grant Application Guidelines Club Voice Day INEC Killarney
VI. Developing a VSMP Program General Stormwater Training Workshop.
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
1 Briefing Session on Application for Fee Revision for the 2013/14 School Year by DSS Schools Submission of budget and financial information MA Section.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Grant Application Guidelines Munster GAA Physical Development Grants 2012.
1 Briefing Session on Application for Fee Revision for the 2012/13 School Year by DSS Schools Submission of budget and financial information MA Section.
Reservation & Carryover Gross Rent Floor Election Commitment 10% Certification PLACED IN SERVICE (PIS)
Applications for Non-recurrent subsidy to carry out Major Repairs / Slope Repairs Briefing Session for Schools under the Direct Subsidy Scheme
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
KENYA NATIONAL BUREAU OF STATISTICS
Office of Procurement Services.  Vendor Application Website: 
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
NJDOE Testing for Lead in School Drinking Water
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
New project request process training
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
RIBA Plan of Work 2013.
Temporary Works Co-ordination
Congratulations, your application has been successful… …what next?
Project Development and Managing your Build Agenda
Unsafe Condition/ Near Miss – Electrical Safety (1)
Engineering Project Tendering.
Management Verifications & Sampling Methods
North of Tyne Community Led Local Development
Management Verifications & Sampling Methods
Use of External Consultants
TEXAS DSHS HIV Care services group
Roles and Responsibilities
RIBA Plan of Work 2013.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Processing Major Repair Application from DSS School REO’s Perspective 1

Underlying Principles Provision for minor repairs costing $2M or below is included in the existing DSS subsidy. To ensure students and staff’s safety, schools should take prompt action to carry out minor repairs. 2

Don ’ ts in MR Application Not to include the non-school portion / F&E items in the application such as boarding annex, curtains of special rooms, etc. Not to include repair / alteration items for above standard facilities built by the school using own fund such as auditorium Not to include the duplicated items of the previously approved projects 3

Don ’ ts in MR Application Not to apply for above-standard repair / alteration items such as CCTV system, air-conditioning system/units in assembly hall, etc. Not to include routine maintenance work to existing slopes such as clearing of slope’s surface, channel and tree management. 4

Checklist for Application Up-dated drawings for each application item attached Cost breakdown of the estimated costs of the proposed work with full justification and description Warranty of re-roofing to the premises is required if works involve re-roofing to the premises 5

Checklist for Application Prior approval / approval in principle from relevant departments is required for works involving structural alterations Inspection, load and insulation test report is required for works involving complete rewiring works 6

Justifications / Information to be provided by schools External-redecoration (including painting work to external wall, replacement work of external wall tiles) – to provide the year of last approval and the conditions involving safety, material of wall paint to be used, etc. Replacement of air-conditioners – to provide supporting documents that the air-conditioners have been provided by EDB, e.g. under noise abatement programme. The school’s representative attending the site inspection conducted by ASD & EDB should be familiar with the details of application items and be able to answer the queries raised in the site inspection. 7

School’s Actions after Approval for MR Application Prepare tender documents for appointing architectural / QS consultants Submit the tenderer list and draft tender documents to EDB with copy to ASD for comments / advice 8

School’s Actions after Approval for MR Application Incorporate the comments from ASD on the tenderer list / draft tender documents and issue tenders to those tenderers who have expressed interest Propose appointment of architectural / QS consultants with recommended fees to EDB for approval 9

School / AP’s Actions on Appointment of Contractor Prepare tender documents Submit the tenderer list and draft tender documents to EDB with copy to ASD for comments / advice Incorporate the comments from ASD in the tender Propose the contractor with recommended fees to school / EDB / ASD for comments / approval 10

School’s Roles after Approval Closely monitor the work progress of AP / contractor to ensure prompt completion of approved works Inform EDB of the cashflow requirement for the approved MR work in subsequent financial years Provide justifications for the unspent cashflow of the financial year(s) where necessary 11

Reimbursement of Claims Subsidy approved will be reimbursed upon school’s submission of claims with receipts / presentation of school’s certificate / AP’s certificate 12