ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS.

Slides:



Advertisements
Similar presentations
27 September, 2004 GEO Special Session on Governance Analysis of Comments on Governance of GEOSS International Cooperation Subgroup Co-Chairs Patricio.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Table of contents 1 Manual of Operational Procedures (MOP) 2
Presentation and discussion April 15, 2013
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Miles Shepherd Chairman ISO Technical Committee 258.
Introduction to Project Management Avneet Mathur
ESA UNCLASSIFIED – For Official Use Deterministic Communication with SpaceWire Martin Suess CCSDS Spring Meeting /03/2015.
ISO/IEC Software Testing
11 Data Interface Standard for Accounting Software Project Progress Report China National Audit Office June, 2015.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
ZHRC/HTI Financial Management Training
Conducting the IT Audit
Release & Deployment ITIL Version 3
EU Public Health Programme Strand 1: Improve information system Establish Working Parties: 1.Lifestyle and other health determinants 2.Morbidity.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Introduction to Software Quality Assurance (SQA)
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
IPA Komponenta IV – Razvoj ljudskih potencijala – Program Europske Unije za Hrvatsku Ured projekta: Radnička 37b, 1000 Zagreb, Ured projekta: Radnička.
SacProNet An Overview of Project Management Techniques.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
Project Life Cycle.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Georgia Institute of Technology CS 4320 Fall 2003.
Internationalisation of Finnish Public Research Organisations Dr. Antti Pelkonen Senior Scientist, VTT Technical Research Centre of Finland
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
Evidence-Based Agricultural and Rural Policy Making: Methodological and Empirical Challenges of Policy Evaluation 122nd EAAE seminar Ancona (Italy), February.
ESA UNCLASSIFIED – For Official Use SOIS Evaluation by the Primes F. Torelli (ESA) Software Reference Architecture - Focus on the Execution Platform ADCSS.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Develop Project Charter
ESA UNCLASSIFIED – For Official Use Recap of SOIS Evaluation by the Primes F. Torelli (ESA) CCSDS Spring Meeting, 23/03/2015.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
Expert Group 4 (EG4) on Certification of the Equipment related to the Directive 2004/52/CE Francisco R. Soriano LISITT- Univ. of Valencia.
Systems Development Life Cycle
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE EMISSION DATA REPORTING UNDER LRTAP Task Force on Emission Inventories and Projections: Oct. 2004,
Darmstadt, October 9th 2007ECSS/CCSDS Coordination meeting 1 ECSS/CCSDS cooperation.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
1 EGTEI – Expert Group on Techno-economic Issues Revision of the Annexes and Guidance Documents of the Gothenburg Protocol Presented by Jean – Guy BARTAIRE.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
© 2007 Her Majesty the Queen in Right of Canada (Canadian Food Inspection Agency), all rights reserved. Use without permission is prohibited. Summary of.
1 Multimedia Development Team. 2 To discuss phases of MM production team members Multimedia I.
D/IMT-T ESA’s Technology R&D Programmes IST ‘98 Vienna December 1998 N.E. Jensen Head of Technology & Systems Studies Dept. ESA/ESTEC, Noordwijk, The Netherlands.
Information Technology Project Management, Seventh Edition.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
ISO/IEC Software Testing The New International Software Testing Standard By Tafline Murnane and Stuart Reid ISO/IEC JTC1/SC7 WG26 Software Testing.
ISO/IEC Software Testing
Deterministic Communication with SpaceWire
Software Configuration Management
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
Project Integration Management
TechStambha PMP Certification Training
Roadmap to Enhanced Technical Regulations of WMO
MAES Working Group Meeting Brussels
ECSS presentation to CCSDS
INPE, São José dos Campos (SP), Brazil
Planetary Protection at ESA
Presentation transcript:

ECSS / CCSDS meeting 09 October Darmstadt Slide 1 ECSS presentation to CCSDS

Slide 2 09 October 2007 ECSS / CCSDS meeting Content The European Collaboration for Space standardization ECSS Objectives/ Facts Users’s Feedback From development to application & maintenance phase New ECSS Organization ECSS types of documents ECSS Tree of standards ECSS E-50 (Communications) & E-70 (Ground System and operations) standards

Slide 3 09 October 2007 ECSS / CCSDS meeting The European Collaboration for Space standardization ECSS is an intiative established to develop a single set of consistent space standards for use by the entire European Space Community. ECSS standards have evolved from the previous 30 years’experience in the management and implementation of European Space Projects. ECSS has developed through a partership between the European Space Agency. National Space Agencies and European Industry

Slide 4 09 October 2007 ECSS / CCSDS meeting ECCS Members Present members of ECSS are ESA (European Space Agency), the National Space Agencies of Canada, France, Germany, Italy, Norway, the Netherlands, the United Kingdom and European space industry represented by Eurospace. some organization have an Observer role on ECSS e.g. EUMETSAT, CEN

Slide 5 09 October 2007 ECSS / CCSDS meeting How it works Is written in consensus by Industry and Agency Experts Define the requirements rather than the means Makes maximum use of existing and commonly used international standards Illustrates best practice techniques Has flexibility through tailoring About 150 standards published

Slide 6 09 October 2007 ECSS / CCSDS meeting ECSS Objectives / Facts ECSS Objectives / Facts Established to: – increase the effectiveness of all space programmes in Europe through the application of a single set of Standards and Requirements recognised by all potential European Customers and equally accepted by Industry. – Support the space manufacturing industry in Europe Primary strength is to facilitate standardization of contract requirements in customer/provider relations throughout all levels of space activities Recognised and appreciated by all European space entities, non- European space entities and various European and International Organizations for Standards. Several Space Agencies have expressed their interest for using ECSS Documents (Ukraine, Russia, Japan, China, Australia and Brazil). Catch-up production of standards during past two years (mainly in the engineering branch) has led to an almost coherent and complete set of ECSS standards Call-up of ECSS as applicable standard in contracts has become a recognised practice in European space business

Slide 7 09 October 2007 ECSS / CCSDS meeting Users’s Feedback Users’s feedbacks:  Confirmation of approaching the maintenance phase (less development needed).  Identification of points to be improved : – Standards need to be more focused for direct application to business i.e. – Avoid mixing requirements, recommendations & informative material – requirements uniquely identified and verifiable – Resolve incoherencies and inconsistencies in and across documents. ECSS to go from development phase to application and maintenance phase

Slide 8 09 October 2007 ECSS / CCSDS meeting ECSS Steering Board set-up dual task force end 2005 to propose way forward into new phase of ECSS – Scope TF1: ECSS organizational aspects – Scope TF2: Contents of ECSS standards Results and SB deliberations (June 2006):  New ECSS Organization:  More user oriented  For transitional & maintenance phases  With simplified processes and decisional levels  With increase ECSS members ownership of product  ECSS Types and Content:  3 Categories of ECSS documens (Standards, Handbook, Technical Memorandum)  Enforcement application of drafting rules  Benchmarking phase to complete and review the set of standards From development to application & maintenance phase

Slide 9 09 October 2007 ECSS / CCSDS meeting New ECSS Organization Steering Board (SB) Working Group Executive Secretariat (ES) Technical Authority (TA) Network of experts Working Group Working Group Working Group Steering Board (SB): Delegates from member organisations. Responsible for policy and strategy issues and for overall supervision. Does not approve individual Standards. Technical Authority (TA): Delegates from members organizations. Set up and implement Work-plan. Authorize Public Review and approval of documents. Executive Secretariat (ES): Performed by ESA/ESTEC. Provide support to SB & TA. Support WGs in drafting documents in accordance with ECSS rules / procedures. Custodians of ECSS docs. Collect and analyze of Change Requests, New Work Items Proposals, feedback … Overall Monitoring of schedule and budget

Slide October 2007 ECSS / CCSDS meeting ECSS types of documents ECSS set of documents reorganized according to 3 types of documents Standard – Normative document written specifically for direct use in invitation to tender and business agreements for implementing space related activities. Its content strictly limited to the statement of verifiable customer requirements, supported by the minimum descriptive text necessary for understanding their context. Handbook – Non-normative document providing background information, e.g. orientation, guidelines, technical data, advice or recommendations, which contains information about how to implement space related activities. – Two types of handbook are considered: 1) Guidelines and good practices 2) Collecion of data – Note: Handbook contains data recognized as valid for use by the ECSS community. Technical Memorandum – Non-normative document providing useful information to the space community on a specific subject, prepared to record and present non-normative data, which are not relevant for a Standard or for a handbook, or not yet mature to be published as handbook or standard.

Slide October 2007 ECSS / CCSDS meeting ECSS Tree of standards

Slide October 2007 ECSS / CCSDS meeting TITLEPUBLISHEDIN PREPPUB. DATE Commsgeneral req.E-50A (Parts 1&2) E-50B 4Q07 Telem. Sync. & channel codingNOE-50-01A 4Q07 Ranging& doppler tracking E-50-02ANO24 Nov 2005 Telemetry transfer frame protocolNOE-50-03A 4Q07 TelecommandNOE-50-04A 4Q07 RF & ModulationE-50-05AE-50-05B 1Q08 SpaceWire: links, nodes, routers & networksE-50-12ANO24 Jan 2003 MIL1553B protocol extensionNOE-50-13A 2Q08 Spacecraft discrete interfacesNOE-50-14A 4Q07 E-50 standards (Communications)

Slide October 2007 ECSS / CCSDS meeting TITLEPUBLISHEDIN PREPPUB. DATE Ground systems & OperationsE-70A (Parts 1&2) E-70B1Q08 On-Board Control ProceduresNOE-70-01A4Q08 Space segment Operability E-70-11ANO5 Aug 2005 Monitoring & control data definition NOE-70-31A4Q07 Procedure definition language (including PLUTO) E-70-32ANO24 Apr 2006 Telemetry and telecommand packet utilization (PUS) E-70-41A NO30 Jan 2003 E-70 standards (Ground Systems and Operations)

Slide October 2007 ECSS / CCSDS meeting New ECSS E-50 activities under consideration: E-50-10: On-board data handling (NEW) E-50-11: RMAP SpaceWire protocol (NEW) E-50-15: CAN Bus protocol (NEW) New ECSS E-70 activity under consideration: E-70-41B (PUS updating, phase 1) E-70 Level 2 Consolidation with European Technology Harmonization Mapping of E into XTCE HB Possible ECSS E-50 & E-70 New activities