Victorian advanced metering infrastructure roll-out AMI budgets 2009-11 and charges 2010-11 AER draft determination Public forum Melbourne 21 August 2009.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Draft decision – initial views Rob McMillan December 2014.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
School Funding Formula (Agenda item 7). Overview Provide an overview of the formula headlines Final schools funding formula 2015/16 Base Formula.
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Determining and Setting Public Utility Rates Bill Wilks, Senior Project Manager November 19, 2014 AGFOA Fall Conference.
Presentation to the: Pennsylvania Public Utility Commission Demand-Side Response Working Group December 8, 2006 Gas Utility Decoupling in New Jersey A.
Smart Grid Forum - Update DCMF Meeting – 7 February 2013 Gareth Evans Head of Profession – Engineering Ofgem.
Freight and Logistics Council Presentation 26 March 15 Peter Parolo, Executive Director Ports and Maritime.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Board Staff Presentation Stakeholder Conference – August 5-8, 2008 INCREMENTAL CAPITAL MODULE July 28, 2008.
Draft decisions Access Arrangements for APT Allgas and Envestra (Qld) Warwick Anderson General Manager, Network Regulation 1 March 2011 Public.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
UK Parliamentary Committee Report on PFI (PPP) August 2011 All PFI projects have to complete a Value for Money (VfM) assessment of the PFI option compared.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
CORNERSTONES TO MANAGING INFORMATION TECHNOLOGY. WHY SERVICE LEVEL AGREEMENTS? Customer Perceptions---Fantasy? Customer Expectations---Reality Customer.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
Presentation on amendment of money bills National Treasury 6 August 2008.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
Victorian electricity distribution pricing review, 2016–20 Overview of revised proposals January
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
NSP II Project Directors Meeting JUNE 3, 2016 PRISCILLA MOORE & OSCAR IBARRA.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
1 Electricity Distribution Price Review Metering Workshop 14 July 2005.
Fair Go Rates System Dr Ron Ben-David Chairperson
Parliament and the National Budget Process
City of Sisters, OR 2017 Water & Sewer Rate Study
Gas default price-quality path reset 2017
Overview What we are trying to achieve in regulatory area
City of Lebanon, Missouri Electric Department
Fair Go Rates System Dr Ron Ben-David Chairperson
Liberty Interactive Corporation Q3-11 Earnings Call November 8, 2011
Minerals & Energy Parliamentary Portfolio Committee
OUTLINE Legislative context, NERSA vision and NERSA mission
Legislative Update: SB 2224 and SB 322 October 1, 2019.
Presentation transcript:

Victorian advanced metering infrastructure roll-out AMI budgets and charges AER draft determination Public forum Melbourne 21 August 2009

Presentation outline Introduction AMI budgets –Order in Council tests and AER processes –areas of initial concern to the AER and its draft determination AMI charges –Order in Council requirements –AER considerations and indicative prices resulting from draft determination for each DNSP Process from here Opportunity for comments/ discussion

Introduction 2006 Victorian government decision to roll-out AMI to all Victorian electricity customers ESC/AER’s role set out in an August 2007 Order in Council (OIC) and subsequent revisions OIC provides for a pass-through of expenditures, AER determines expenditure budgets Metering charges set in relation to building block calculation, includes budgeted and actual expenditures Metering charges regulated under separate process from general distribution charges

January 2009 – AER framework and approach paper February 2009 – DNSPs submitted budget applications June 2009 – DNSPs submitted charges applications July 2009 – AER issued draft determination on charges to inform further consultation AER final determination on budgets and charges due 31 October 2009 Introduction

AMI budgets

Order in Council tests OIC sets out tests for the expenditure: –scope test –prudent tests competitive tender test expenditure incurred test commercial standard test For costs to be rejected, AER must establish costs are outside scope or not prudent Costs associated with ‘above scope’ activities can be accepted if net benefits determined

Order in Council tests

AER approach to assessment Review of: –DNSPs’ proposals to AER and ESCV (2008) –RFP/RFT documents, procurement strategy documents, signed contracts –internal business case documents –DNSP presentations to AER staff –further information on specific areas requested by AER AER engaged Energeia to provide advice on technical aspects and application of OIC tests Comparison of costs across expenditure categories to focus review on material areas

Scope test OIC contains lists of activities for each DNSP that are inside and outside scope In-scope activities very broad AER established that SP AusNet’s direct load control costs are outside scope – all other activities were found to be in-scope

Prudent tests Contract costs - Competitive tender test –procurement strategy documents, RFTs, contracts –Framework and approach sets out elements considered by the AER –contract costs = 38% of all proposed costs –AER did not receive contract information relating to $16.3 million of SP AusNet’s proposed contract costs – assessed as non contract costs

Prudent tests Non-contract costs – Expenditure incurred test –implications for DNSPs of not incurring costs –CitiPower, Powercor and SP AusNet proposed costs for customer response trials – AER established unlikely to be incurred –United Energy Distribution’s (UED) self insurance and equity raising costs unlikely to be incurred Non-contract costs – Commercial standard test –categories of expenditure proposed –circumstances of DNSP, as compared to reasonable commercial business in the circumstances –AER unable to establish any proposed costs reflected substantial departure from the commercial standard that a reasonable business would exercise in the circumstances

AER initial areas of concern- AMI budget applications

2-element meters Proposed by SP AusNet and Powercor above OIC minimum specifications AER’s Framework and approach – out of scope activities need to be justified on net benefit grounds time of use pricing – only available when AMI communications operational (est. 2012) tariff reassignments – high transitional costs short-term net benefit demonstrated – however may not be necessary in second budget period once AMI communications are fully operational

WiMAX SP AusNet communications solution, very large bandwidth Potential to support unregulated services, which are outside scope further information showed lower ongoing opex costs than alternative mesh radio solution Energeia considered WiMAX a reasonable choice, given AMI requirements and SP AusNet’s circumstances Using only bandwidth required to meet AMI functionality AER unable to establish that SP AusNet is using WiMAX to provide communications services beyond AMI, therefore inside scope

Direct load control SP AusNet proposed a utility managed load control relay in all meters outside scope – AER requested net benefit assessment in accordance with Framework and Approach SP AusNet stated concern that minimum functionality specifications are not detailed enough to ensure its load control plans technology provided for in the minimum functionality specifications is cheaper than SP AusNet’s proposal, and provides more customer choice no net benefit was established for the proposal AER established proposed costs are outside scope

Other areas under scope test Number of other items of proposed AMI technology above AMI minimum specifications most recommended by independent technical experts AER and Energeia considered these are reasonably required to enable the DNSPs to meet required AMI functionalities

Related party margins CitiPower, Powercor, Jemena and United Energy engaged related parties to manage AMI roll-outs not competitively tendered (non-contract costs) no efficient cost review permitted in OIC AER unable to establish costs were not prudent under OIC tests draft decision indicated AER will examine related party margins as part of next reset, results may inform second budget period determination

Self insurance, equity raising costs Self insurance –United Energy proposed $0.4m over –vendor insurance requirements built into AMI contracts –self insurance also provided in ESCV’s EDPR Equity raising costs –United Energy proposed $7.1m over –effective double recovery of capital raising costs for 43% of proposed capex –substantial departure from recent AER benchmark rates –AER considered United Energy likely to fund capital using less expensive capital raising methods AER established costs unlikely to be incurred

Customer response trials CitiPower, Powercor and SP AusNet proposed a total of $4 million for customer response trials DPI advised that the trials are unlikely to go ahead in 2009 nor 2010 AER rejected costs under the expenditure incurred test

AER draft decision - budgets DNSP Total proposed budget ($m) AER draft decision ($m) Difference CitiPower % Jemena % Powercor % SP AusNet % United Energy %

AMI charges

OIC requirements OIC sets out calculation of building block revenue requirements and how these are translated into metering charges The DNSPs’ AMI charges for 2010 and 2011 recover –AMI opex and capex budgets for ; and –IMRO and AMI related costs incurred from 1 January to 2006 to 31 December 2008 Charges will be updated annually when budgeted costs are substituted with actual expenditures

Building block revenue requirement Building blocks include: Return on capital (some WACC parameters based on AER WACC review) Depreciation Operation & Maintenance costs Corporate tax allowance Costs incurred over : –IMRO costs –AMI net revenue or costs from –DUoS tax liability –Efficiency carryover –Costs relating to AMI trials, IT systems integration, project management, exchange and interest rate hedging expenditure

Charges adjustments Annual “true up” of charges to reflect actual costs incurred and revenue received Actual costs to be reported in regulatory accounts Future charges also reflect budget revisions –Actual expenditure can vary by 120% of initial budget; will drive future charges OIC permits DNSP’s to propose charges that result in under- recovery of revenues in early years, to minimise price shock –AER flagged this in F&A –Where DNSP proposed 2010 charges over recovered draft determination revenues, the AER reduced 2010 charges to ensure NPV neutrality with draft determination revenue requirement –Where DNSP proposed 2011 charges over recovered draft determination revenues, the AER reduced 2011 charges to ensure NPV neutrality with draft determination revenue requirement

AER initial areas of concern- charges applications

Regulatory accounts Issues with all DNSPs charges applications Reported actual costs ( ) that departed from audited regulatory accounts, which the AER did not accept under the requirements of the revised Order AER did not accept allocations of costs by the DNSPs which affected the size of benefits under the efficiency carryover mechanism in their favour

WACC – Debt Risk Premium DNSPs jointly proposed measurement of debt risk premium from Tabcorp bond –Issued four months after OIC required averaging period –Maturity of 5 years, OIC requires 10 years –variable rate bond, OIC requires fixed coupon Commonwealth Government bonds DNSPs proposed adjustments to reflect inconsistencies with OIC requirements DNSP proposal considered to be inconsistent with OIC AER re-examined Bloomberg data, finding it appropriate DNSPs’ proposed AMI WACC of per cent vs draft determination AMI WACC at 8.96 per cent

CitiPower issues AER did not accept regulatory accounts data for AER reduced CitiPower revenues by $4.4m for CitiPower chose to under recover revenue in 2010 – requires compensating increase in 2011 charges –Consistent with revised OIC approach –AER did not smooth 2011 price, as not permitted to compel a DNSP to under recover in any one year AER therefore reduced proposed 2011 charges (-12.3%) – to align with draft determination revenues in NPV terms

CitiPower metering charges proposed vs draft decision Annual metering charge ($/NMI) proposedDecisionproposedDecision Single phase phase direct connected phase current Transformer connected

CitiPower metering charges indicative price change from 1 January Meter type Single phase non-off peak236%8% Single phase off-peak166%8% 3 phase direct connected76%8% 3 phase CT connected64%8% Note: Under AMI, peak and off-peak now become single phase.

Jemena issues Jemena provided letters to corroborate data but these were inconsistent with regulatory accounts, therefore not accepted 2008 costs data not consistent with regulatory accounts Jemena cost allocation for efficiency carryover not substantiated, large revenue impact- $22m reduction Jemena proposed under recovery of $6.6m in 2010 and 2011 –Consistent with revised OIC approach AER reduced Jemena’s proposed revenue requirements by $27.9m over 2009–11 AER therefore reduced 2010 proposed charges (-49.6%) and 2011 charges (-4.5%) –to align with draft determination revenues in NPV terms

Jemena metering charges proposed vs draft decision Annual metering charge ($/ NMI) proposedDecisionProposeddecision Single phase single element Single phase single element, with contactor phase direct connected phase current Transformer connected

Jemena metering charges indicative price change from 1 January Meter type Single phase single element151%93% Single phase single element with contactor8% 93% 3 phase direct connected-6% 93% 3 phase CT connected278% 93% Single phase single element and single phase single element with contactor replace single phase non off peak and single phase off peak.

Powercor issues AER did not accept Powercor 2006, 2007 data, as not consistent with regulatory accounts Powercor requested changes to 2006 regulatory accounts via letters – not accepted by AER Powercor under recovered revenues by $18.5m in This delivered higher charges for 2011 –Consistent with revised OIC approach AER reduced Powercor’s revenues by $8.5m over the 2009–11 The AER therefore reduced proposed 2011 charges (-10.9%) –to align with draft determination revenues in NPV terms

Powercor metering charges proposed vs draft decision Annual metering charge ($/NMI) proposeddecisionproposeddecision Single phase phase direct connected phase current Transformer connected

Powercor metering charges indicative price change from 1 January Meter type Single phase non-off peak177%15% Single phase off-peak100%15% 3 phase direct connected40%15% 3 phase CT connected31%15% Note: Under AMI, peak and off-peak now become single phase.

SP AusNet issues Minor issues with provisions Adjustment to efficiency carryover amount for customer service costs SP AusNet chose to under recover revenues by $7.1m in Results in higher 2011 charges –Consistent with revised OIC approach AER reduced SP AusNet’s revenues by $11.1m over the 2009–11 AER reduced proposed charges in 2010 (-1.4%) and 2011 (-14.5%) to align with draft determination revenues in NPV terms

SP AusNet metering charges proposed vs draft decision Annual metering charge ($/NMI) proposeddecisionproposeddecision Single phase, single element with contactor Single phase, 2 element with contactor Multi-phase, 1 contactor (1 load control) Multi-phase, 2 contactors (2 load controls) Multi-phase Current Transformer connected

SP AusNet metering charges indicative price change from 1 January Meter type Single phase single element 1 contactor (1 load control) 110%24% Single phase, 2 element 2 contactors (2 load controls) 101%24% Multi phase, 1 contactor (1 load control)0%24% Multi phase, 2 contactor (2 load controls)0%24% Multi phase CT connected40%24% Note: single phase 1 element and 2 element replace single phase non off peak and single phase off peak.

United Energy issues Minor adjustment to efficiency carryover amount – for customer service costs UED proposed revenue neutrality for both 2010 and 2011 charges –Consistent with revised OIC approach AER reduced UED revenues by $12.7m over the 2009– 11 AER therefore reduced 2010 charges to align with draft determination revenues in NPV terms AER reduced proposed charges in 2010 (-18.8%) and 2011 (-3.2%) to align with draft determination revenues in NPV terms

United Energy metering charges proposed vs draft decision Annual metering charge ($/ NMI) proposeddecisionproposeddecision Single phase single element Single phase single element, with contactor phase direct connected phase current Transformer connected

United Energy metering charges indicative price change 1 January Meter type Single phase single element222%28% Single phase single element with contactor 180%28% 3 phase direct connected120%28% 3 phase CT connected86%28% Note: single phase single element, and single phase single element with contactor replace single phase non off peak and single phase off peak.

Price impacts summary Across all DNSPs, 2010 charges represent an average increase of $53 on 2009 metering charges [1], with a further $25 increase in 2011 [1] [1] Based on single phase single element non off-peak meter, read quarterly in 2009, approved by the ESCV[1]

Process from here DNSPs must submit amended Submitted budgets for AER approval by 28 August (AER will publish) Stakeholders’ submissions due 11 September AER final determination on budgets and charges due 31 October 2009 New metering charges apply from 1 January 2010

Questions, comments?