1 The Corps of Engineers Water Supply Program Presented by: Steve Cone Institute for Water Resources Economic Analysis for Water Resources Alexandria,

Slides:



Advertisements
Similar presentations
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
Advertisements

David Purkey, SEI Rob Lempert, RAND
Economic Guidance Summary The Basis for Benefit-Cost Analysis in the Corps.
1 FIRST QUARTER 2009 INVESTOR CONFERENCE CALL. 2 Today ’ s Hosts Steve Romano Chairman & Chief Executive Officer Jim Baumgardner President & Chief Operating.
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
FDR1 - 1 Flood Risk management History/Mission/Policies.
Responses to the New Normal Creative Partnerships for Innovative Water Solutions Colorado Water Workshop – July 17, 2013.
Geothermal - Utah Program - General Program - General Areas of Geothermal Potential – Prospectively Valuable and Known Geothermal Resource Areas (KGRA)
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
1. Definitions Acre-foot: Equals about 326,000 gallons—enough to serve a family of four, for a single year. Doctrine of Prior Appropriations: The use.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Engineer Circular Requests to Alter USACE Projects
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
One Corps Serving The Army and the Nation Water Supply FY 05 Program Development Ron Conner.
1 Database and Water Supply Study Presented by: Ted Hillyer Institute for Water Resources Wilmington, NC November 4-6, 2003 Water Supply Workshop Falls.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Statewide Water Needs and future estimated costs September 20, 2011.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
NED COSTS And Other Bewilderments Of COE Planning And Other Bewilderments Of COE Planning.
Basic Economic Concepts. OBJECTIVE: The student will become familiar with the following items: Economic Fundamentals –Scarcity –Choices –Basis of Benefits.
America’s Water Upmanu Lall water.columbia.edu.
1. 2 Water Supply Sources Surface water Groundwater Reuse Water Supply Facilities Storage Wells Desalinization Plants Intakes& Pumps Treatment Transmission.
NRCS Watershed Rehabilitation
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
Savannah Harbor Expansion Project
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Peak Oil Opportunities and Challenge at the end of Cheap Petroleum Richard Heinberg Scripps College September 18, 2006 The Challenge of Peak Oil Richard.
Normative Criteria for Decision Making Applying the Concepts
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
Life Cycle Cost Model Update Preliminary Report Joint Legislative Audit & Review Committee January 4, 2007 Stephanie Hoffman and Keenan Konopaski.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
CREDIT TO POWER MARKETING AGENCIES Jan Hotubbee, CESWT-PE-P To insert your company logo on this slide From the Insert Menu Select “Picture” Locate your.
ACT & ACF Draft Programmatic Environmental Impact Statements SAD Water Supply Conference Wilmington, NC David Luckie (CESAM-PD)
IRRIGATION AKA ECONOMIC DEVELOPMENT.  Double the value of agriculture by  Add 500,000 acres of irrigation.  Assist local producer in efforts.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Overview of Conservation Options in the Colorado River Basin Water Supply & Demand Study WEAN-CRB Webinar January 9, 2013.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
North Dakota Water Funding 2013 Legislative Session May 13, 2013 NDACo Legislative Wrap-up Jean Schafer – North Dakota Water Coalition.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
1 DELEGATIONS & PROCESSING  Delegations  Processing  Common Issues – Problems  Unique Situations / Future Attractions Steve Cone (CECW-PC) SAD Water.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
2016 Columbia River Basin Long-Term Water Supply and Demand Forecast Dan Haller, PE
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
BUILDING STRONG ® PLANNING SMART ® US Army Corps of Engineers BUILDING STRONG ® Partnering Opportunities for Water Supply and Distribution Planning Beverley.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
US Army Corps of Engineers BUILDING STRONG ® 1 Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 15.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
Presentation to the Portfolio Committee on Energy
Allocation of Ogallala Groundwater Supplies
Florida and Reclaimed Water
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
California Water Commission
Presentation transcript:

1 The Corps of Engineers Water Supply Program Presented by: Steve Cone Institute for Water Resources Economic Analysis for Water Resources Alexandria, VA March 2009 Authorities, Policies and Procedures Scope of Corps WS Economic Analysis Future Directions

2 Learning Objectives The Corps’ primary water supply authorities and policies The magnitude of the Corps’ M&I water supply program Economic Analysis of WS Reallocations of Storage

3 Water Supply in a Multipurpose Project Water Supply Sediment Flood Control Storage Conservation Storage Elev. 200 Elev. 150 Elev. 80

4 WATER SUPPLY Primary Authorities Section 6 of the Flood Control Act of 1944 (surplus water) Section 8 of the Flood Control Act of 1944 (irrigation water) The Water Supply Act of 1958 (storage space). Project Specific Authorities

5 WATER SUPPLY Primary Authorities Sec. 6, 1944 FCA: (Surplus Water) Sec Army can enter into agreements for surplus water with states, municipalities, private entities and individuals. Surplus is defined as:  water not required for the original purpose because the need never developed or the need was reduced by changes in demand. OR  water which would be more beneficially used as M&I than for the authorized purpose and which when withdrawn would not significantly affect authorized purposes over some specific time period. Prices and terms are as the Secretary deems reasonable. We use the same pricing system that is used for reallocations. Amounts of water are normally small. Contracts for 5-years with option for renewals with updated costs. Agreements for M&I but not for crop irrigation.

6 WATER SUPPLY Primary Authorities Agricultural Water Western States with DOI water facilities –Sec. 8, 1944 FCA for Western States –Include irrigation in Corps lakes in 17 contiguous Western States upon recommendation of Sec DOI and in conformity with Reclamation Law. –DOI constructs, operates and maintains irrigation works and enters into agreements for use of storage. Eastern States –Section 103(c)(3) of WRDA ’86; Cost shared at 35% of costs + 100% OMRR&R In Western States – if no BUREC facilities

7 WATER SUPPLY Primary Authorities Title III, 1958 R&HA, “The 1958 Water Supply Act”: (Water Supply Storage) Act states that water supply is primarily a state and local responsibility. Include M&I water supply storage in new reservoir projects. Reallocate storage in existing projects to M&I water supply. Modification of projects to add M&I that would seriously affect other authorized purposes require congressional authorization (POLICY: 50,000 AF or 15% of total storage) All costs to be repaid by the non-Federal sponsor. Time of repayment varies depending on when authorized.

8 WATER SUPPLY Repayment of Costs under 58 Act, as amended Old Projects (pre-WRDA 86) - Contracts signed prior to 1986 – 50 years with 1958 interest rate formula - Contracts signed after 1986 – 30 years with 1986 interest rate formula New Projects (post WRDA 86) - Law permits 30 years - policy requires to be paid during period of construction Reallocations - New construction costs – paid during period of construction - Storage costs – 30 years with 1986 interest rate formula All “Plumbing” Facilities are Non-Federal (conveyance, treatment, distribution facilities, etc.) No single purpose water supply reservoirs - at least 20% of benefits from FRD, Nav., Env. - Single purpose modifications to existing projects, O.K.

9 WATER SUPPLY Guidance ER PGN, dated April 2000 Paragraph 3-8 Appendix E, Section VIII EP Policy Digest, dated July 1999 Chapter 18 cp/library/CWPocketReference_14Nov05.pdf IWR Report 96-PS-4 Water Supply Handbook Chapters 2, 4 and 5

10 WATER SUPPLY Reallocation Policy Under 1958 Act Applies to Existing Pre-86 Act Projects Sponsors obtain Permanent Right to Storage Cost based on higher of updated cost of storage, revenues foregone, or benefits foregone WRDA 86 interest rate formula over a repayment period of 30 years Any new construction costs paid upfront

11 WATER SUPPLY Secondary Authorities PL , 1937 – receipt of contributed funds PL , 1963 – permits locals to have permanent rights to storage as long as they continue with OMRR&R Section 22 of WRDA 74 (PL ) – planning assistance to states Sec. 82 of WRDA 74 and 1974 Disaster Relief Act – emergency supplies of clean water Section 931 of WRDA 1986 (PL99-662) – unused M&I water can be used temporarily for irrigation Section 322 of WRDA 90 (PL ) – provides for a reduced price where cost of reallocated storage has been priced at the updated cost method

12 Authorities, Policies and Procedures POP Quiz Where in the PGN are the water supply policies and procedures located? How many primary water supply authorities are there and which one is used to the greater extent? How many years does a sponsor have to repay their water supply cost?

13 WS Overview Municipal and Industrial Water Supply (2007 data) Storage Space: 9.38 million acre-feet Reservoirs:134 reservoirs Location:26 States and Puerto Rico 24 of the Corps 38 districts Investment Cost:$1.28 billion No. Agreements316 covering 9.08 million acre-feet Irrigation Water Supply (2004 data) 56.6 million AF of storage for irrigation and other uses in 48 reservoirs in the West (only 640,000 of which is specific irrigation)

14 Distribution of M&I Storage Space by MSC (%) 10.2% 1. 3% 3. 9% 5. 9% 6. 5% 69.7% 2. 5% 0%

15 M&I and Irrigation Projects Location and Data Developed by Monica Franklin Water Supply / Fast Facts

16 % of M&I Storage Space by Type of Non-Federal Sponsor States with 50.3% have the majority of storage space

17 Scope of Corps WS - POP Quiz – 1.Approximately how many million acre- feet of M&I storage are in Corps reservoir projects? 2.In what MSC is the majority of this storage located? 3.Which type of entity has the most M&I storage space in Corps projects?

18 Conceptual Basis For Water Supply NED Benefits From the P&G: S ociety's willingness to pay for the increase in the value of goods and services attributable to the water supply. Where the price of water reflects its marginal cost, use that price to calculate willingness to pay.

19 Conceptual Basis For Water Supply NED Benefits Water Supply is normally priced on the average, not on the margin. So, must use one of the other accepted methods described in P&G.

20 Willingness To Pay Benefit Estimation Approaches Actual or simulated market price Change in net income Cost of the most likely alternative Administratively established values

21 Benefit Analysis - Steps Step 1 - Identify the Study Area Step 2 - Estimate Future M&I Water Supplies Step 3 - Project Future M&I Water Demand Step 4 - Identify the Deficit Between Future Water Supplies and Demand

22 Benefit Analysis – Steps (Cont.) Step 5 - Identify Alternatives Without Federal Plan Step 6 - Rank and Display the Alternative Plans Based on Least Cost Analysis Step 7 - Identify the Most Likely Alternative Step 8 - Compute M&I Water Supply Annualized Benefits

23 Water Supply - Reallocations Reallocate storage at existing reservoirs Key element is definition of costs of storage to new water supply user

24 Opportunities for Reallocation Reallocation of Flood Control Storage Reallocation of Conservation Storage - Water Quality - Hydropower - Other Reallocation of Sediment Pool

25 REALLOCATION Summary of Reallocation Agreements Reallocated FromNumber of Agreements Storage Reallocated (acre-feet) Hydropower41221,127 Flood Control51302,136 Conservation727,185 Water Quality7125,125 Other & NA17178,800 Total123854,373

26 Reallocations: Economic Evaluation Concepts Identify and measure benefits and costs using “with and without” principle Benefit is most-likely, least costly alternative Apply opportunity cost concepts to determine NED costs (e.g. what is foregone? What resources are needed?)

27 Price of Reallocated Storage Highest of: 1. Benefits foregone --opportunity costs from economic evaluation 2. Revenues foregone -- revenues to Treasury lost due to reduced power production (current power rates) 3. Updated cost of storage in the Federal reservoir

28 Price of Reallocated Storage (cont.) 3. Updated Cost of Storage = (TC - SP) X Storage reallocated (ac-ft) Total usable storage space (ac-ft) TC = total costs of construction updated using Civil Works Construction Cost Index System (CWCCIS) and ENR SP =specific costs = costs of identifiable project features for a specific purpose updated using CWCCIS and ENR

29 COSTS FOR REALLOCATED STORAGE Storage Space: – Average $530 Ac/Ft of space – Range from $100 to $4,500 Ac/Ft of space Yield: – Average $250 Ac/Ft/Yr of yield – Range from $50 to $1000 Ac/Ft/Yr of yield

30 Water Supply Economic Analysis for Reallocations Inputs: –Water demands –Cost of most likely alternative –For reallocations: Need the effects on existing project purposes –Updated project costs Outputs: –Net NED benefits –Benefit to cost ratio –Price of water supply storage ($/acre-foot) –Info for water supply contract

31 Reallocation Report Evaluations 1.Water supply demand analysis 2.Storage-Yield analysis 3.Analysis of alternatives to meet net demands 4.Cost of modifications/mitigation 5.Cost/Price for storage determination 6.Determination of Compensation to Others 7.NEPA Analysis/documentation 8. Public participation and public interest review documentation

32 Summary of Economics and Reallocations Benefits based on the most likely alternative Reallocation studies are the most common Corps water supply study Price of reallocated study based either on benefits foregone or updated price of storage

33 Water Supply Business Line Managers  Headquarters – Ted Hillyer IWR  MSCs –William Sutyak – NAD –Terry Stratton - SAD –Ronny Sadri – LRD –Kevin Curran – MVD/MVS –Jim Fredericks – NWD –Adrienne Carter – SWD –S.T. Su – SPD –Helen Stupplebeen - POD

34 Future Directions Trends - Associated Uncertainties Increase in population and economic growth - Uncertainty about growth rates - Potential for large shifts of water demand Increasing in-stream demands - Public resolve on environmental values Global warming and climate change - Pace and form of climate change - Impacts on water resources Demand for water for energy production - Selection of fuel alternatives (liquefaction or biofuel types) Aging water supply infrastructure - Budget priorities in funding for rehabilitation

35 Future Directions Other trends and Uncertainties Increased demands for reallocations and modifications Risk and Reliability based Yield evaluations Unquantified Indian water right claims Increase Water Transfers Development of new water supply and transmission infrastructure Increasing investment in water desalination Groundwater recharge and recovery Reclamation of wastewater and impaired water

36 Things in the Pipeline that may Alter Reallocation Policies Left out of WRDA Take the lower of updated cost of storage, benefits or revenues foregone or replacement cost. – Congress requests dialogue on WS pricing. Lake Lanier, GA. This has to do with reallocating storage in Lake Lanier and the law suit among GA, AL and FL on the ACT/ACF. Actions here may further define Corps discretionary authority under WSA 58. Chatfield, CO. This is an issue with reallocation of less than reliable storage in Corps reservoirs in CO. May affect pricing policies for less than reliable supplies. Water Supply Portfolio Analysis FY08/09 – To help prioritize WS study investments and may alter financing for study costs.

37 Water Supply Assistance John Micik – CECW-PC: 202/ Policy Compliance Reviewer Janet Hotubbee – CESWT-PE-P: , x3114 Water Supply Specialist (cell) Peter Shaw – CESWD-PDS-P: 469/ Technical POC for the Water Management & Reallocation Center of Expertise Steve Cone – CEIWR-GW: WS Knowledge Expert 571/ (cell) Ted Hillyer – CEIWR-GR: 703/ HQ WS Business Line Manager

38 Whiskey’s for drinkin’: water’s for fightin’ --Mark Twain Questions ?