PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
NCRRP 03-01: Intercity Passenger Rail Service and Development Guide Curtis Morgan Program Manager Rail Research Program, Texas A&M Transportation Institute.
Unified Carrier Registration (UCR) Update August 24, 2006.
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
Section 305 Technical Subcommittee Chicago IL June 22 nd 2011.
Standardization Working Group Report
Independent Review of NGEC Standardization Process.
IT Governance and Management
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Section 305 Technical Subcommittee Progress Report Mario Bergeron-Chairman Dale Engelhardt-Vice Chairman Charlotte, NC September 15, 2011.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
MAC Committee Update Robert Kondziolka, MAC Chair.
0 PRIIA 305 Technical Subcommittee PRIIA Executive Board Meeting March 10, 2010.
1 National Perspective FEDERAL RAILROAD ADMINISTRATION April 17, 2012 Canada-United States Transportation Border Working Group - Spring Plenary Cross-Border.
Participating from a Distance Bringing the TRB Annual Meeting Home to the Washington State Department of Transportation Leni Oman Director Office of Research.
Financial Subcommittee Report February 15, Identify options for funding new equipment. Tasks include: Identify and evaluate potential sources of.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Treasurer’s Report February 23, Section 305 Next Generation Equipment Committee Approved Grant Revision April 1, 2011 to March 31, 2012 In thousands.
2010 Next Generation Corridor Equipment Pool Committee Steve Patterson and George Howell October 20, Preliminary Considerations -
Training Module 7. What You’ll Learn In This Module In what areas may Conservation Districts enter into a contractual agreement with Michigan Department.
Treasurer’s Report February 15, Section 305 Next Generation Equipment Committee Estimated Expenses January 1, 2010 to March 31, 2011 Executive Committee.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
Advisory Committee for Diversity in the Digital Age.
S C O F A — S T A N D I N G C O M M I T T E E O N F I N A N C E A N D A D M I N I S T R A T I O N H T T P : / / S C O F A. T R A N S P O R T A T I O N.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
PRIIA 209 Equipment Capital Working Group Ron Pate, Director Cascades Rail Corridor and Washington State Department of Transportation Rail Division.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
0 PRIIA 305 Technical Subcommittee Conference Call March 4, :00 pm ET.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
2011 OSEP Leadership Mega Conference Collaboration to Achieve Success from Cradle to Career 2.0 Race to the Top Assessment August 2, 2011 Patrick Rooney.
PRIIA 305 Diesel Electric Locomotive Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.
PRIAA Section 305 Next Generation Equipment Pool Committee (NGEC) Annual Meeting and Executive Board Business Session February 15, 2011.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
NGEC, moving forward Next Generation Equipment Committee October 24, 2014.
FRA Presentation to PRIIA 305 Tech Subc 22 Apri Kevin Kesler Equipment & Operating Practices Division PRIIA Section 305 Next Generation Passenger.
Finance Sub-Committee Report NGEC Annual Meeting Washington, DC February 21, 2014.
Section 305 Technical Subcommittee Progress Report Dale Engelhardt-Acting Chairman Washington, DC Feb. 21,
Professional Services for.  Desire to evaluate policies, procedures, and practices of LCPD  Hired Justice and Security Strategies (JSS) to: 1.Evaluate.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Section 305 Finance Subcommittee Report 2012 NGEC Annual Meeting Gordon Hutchinson, Acting Chief Financial Officer, Amtrak Washington, DC February 23,
WVHIMSS Board & Committees. President Responsibilities – Presides at all meetings of the Board of Directors and the membership – Attend the annual HIMSS.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Next-Generation Equipment Committee Executive Board
NMHIMSS Meet the Board & Committees May 26th, 2016
2018 – 2023 Strategic Budget Plan
Section 305 Technical Subcommittee Progress Report
Next-Generation Equipment Committee Executive Board
Midwest Rolling Stock - Section 6 Plan
PRIIA Section 209 States Working Group/Amtrak Update
NGEC Annual Meeting Washington, DC February 21, 2014
Next-Generation Equipment Committee Executive Board
Finance & Administrative Sub-Committee & Treasurer’s Report
NGEC Executive Board Chairman’s Report
Cooperative Rail Research at TRB
NGEC Executive Board Chairman’s Report
State of Amtrak 2012 Congressional Outlook
Finance & Administrative Sub-Committee & Treasurer’s Report
Alternative Fire and EMS Service Delivery August 18, 2016
Enterprise Content Management (ECM) Project
City Council February 4, 2019 Item No. 2
Report of the Technical Subcommittee
NGEC Executive Board Meeting
Chicago to Council Bluffs-Omaha
Presentation transcript:

PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010

1 Section 305 Next Generation Equipment Committee Purpose: –To design, develop specifications for, and procure standardized next generation corridor equipment Functions: –Determine number of different types of equipment required –Establish a pool of equipment for use on routes funded by participating states –Subject to agreement, utilize Amtrak-provided services to design, maintain and remanufacture equipment Cooperative Agreements –Amtrak and participating states may enter into agreements for funding, procurement, remanufacture, ownership and management –May apply to current or new equipment –May establish a corporation to perform these functions Participants –Amtrak, States, FRA, host railroads, equipment manufacturers, other operators as appropriate

2 Section 305 Executive Committee Executive Committee Membership –Amtrak –Federal Railroad Administration –States (CA, GA, IA, LA, MD, MO, NC, NY, WA, WI) Officers –Bill Bronte, California - Chair –Mario Bergeron, Amtrak - Vice-Chair –DJ Stadtler, Amtrak - Treasurer –Rod Massman, Missouri - Secretary Subcommittees/Task Forces –Financial –Technical –Administrative

3 Section 305 Deliverables Work Plan First Year Deliverables –Complete single-level specifications for corridor services –Complete bi-level specifications –Diesel locomotive specifications –Develop ownership and organizational structures –Determine appropriate procurement strategies –Fleet management strategy –Be prepared for initial procurements Rolling stock procurements using federal funds will be subject to “Buy America” requirements

4 Section 305 Current Activities Executive Committee has met four times in Washington DC FRA has provided $2 million grant for Section 305 activities –Grant agreement between Amtrak –Amtrak administered under direction of NGEC Executive Board Sub-Committees have been established and meet regularly –Technical, Financial Subcommittees and Administrative Task Force all underway –Work Plans and Budgets have been approved by Executive Board AASHTO providing Support Services to NGEC and working groups –Minutes, Action Items, Logistics, –Section 305 Website Administrative Task Force –Development of polices and procedures –Issues associated with liability, intellectual property –Alternative methods of organization/incorporation Financial Subcommittee –Exploring funding mechanisms –Gaining better understanding of potential markets

5 Section 305 Technical Subcommittee Technical Subcommittee “kick-off” meeting April in Chicago with 150 participants from rail industry Utilized “C-21” draft specification developed by Amtrak and Caltrans as starting point Established Working groups from the industry to review, modify and suggest changes to draft specification –Structural, Mechanical, Electrical, VTI, Interiors –THOUSANDS of cooperative, collaborative work hours from the industry Draft 305 Bi-Level Spec delivered to Executive Board for consideration in July - On Schedule Executive Board Review Panel and Independent Assessment performed mid-August Section 305 Executive Board unanimously approves Bi-Level Spec on August 31. Required for obtaining new bi-level corridor equipment with federal funds

6 Section 305 Bi-Level Spec Guiding principles –For use anywhere in U.S. or Canada where desired while meeting Amtrak clearance envelope (non-NEC) –Nationwide perspective for specifying component performance that reflects operational and environmental conditions where used –Dependence on industry standards –Functional compatibility with existing bi-level cars –Operate as discreet fleet or intermingled –40 year minimum design life –Safety, reliability and maintainability –CEM –Standardization of component assemblies

7 Section 305 Next Steps Complete by January 2011 –Single Level Car Specification –Diesel Locomotive Specification –Financing recommendations –Structure/Incorporation Opportunities Next year –Single Level Trainset Specification –DMU –Continue Structural/Incorporation/Financing –Other work as directed

8 Additional Information